Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

Ron Johnson

Sandstone,MN

Summary

Journeyman construction laborer with 9 years of experience doing utility work on residential and commercial projects. Can be pipe layer,Bottom man, or top man. Hardworking, good people skills, don't have a problem explaining and teaching less experienced workers, also love learning new ways to do things. Strongly believe in team effort/good chemistry, effective communication, organization/site cleanliness and having the right tools to do the job/taking care of those tools,and doing our job safely. Can read/interpret site plans, operate equipment if needed, follow orders or give them

Overview

10
10
years of professional experience
2012
2012
years of post-secondary education

Work History

Pipe Layer

Triple E Water & Sewer
03.2023 - 04.2024
  • Installed pipes using hand tools, power tools and heavy machinery.
  • Cleaned debris from worksites following completion of tasks.
  • Analyzed blueprints and technical documents prior to starting construction projects.
  • Used measuring instruments like levels, transits and laser devices for accurate positioning of pipes.
  • Inspected existing pipeline systems for defects and malfunctions.
  • Collaborated with team members in order to ensure successful completion of tasks.
  • Performed backfilling operations after completing piping installations.
  • Connected pipes with fittings such as elbows, tees, couplings, valves and clamps.
  • Tested newly constructed pipelines for leaks before commissioning them into service.
  • Assisted in the excavation of trenches for pipe laying.
  • Operated heavy machinery including tractors, bulldozers and loaders safely at worksites.
  • Assembled prefabricated parts such as chambers, manholes, catch basins.
  • Handled assembly and installation of underground piping, fittings and valves for storm drains and water mains.
  • Repaired sanitary and storm water sewer structures and pipe systems.
  • Directed equipment operators and alerted to hazards by using effective hand signals.
  • Graded and leveled trench bases using tamping machines and hand tools.
  • Located underground utilities in preparation for digging and marked locations to prevent damage.
  • Put in new fire hydrants, gate valves and fire lines to support city requirements.
  • Followed written instructions, schematics and blueprints to lay out pipe in correct arrangements.
  • Operated rollers, front-end loaders and backhoes for site work.

Pipe Layer, Bottom Man, Top Man

United Water & Sewer
08.2018 - 11.2021
  • Installed pipes using hand tools, power tools and heavy machinery.
  • Cleaned debris from worksites following completion of tasks.
  • Analyzed blueprints and technical documents prior to starting construction projects.
  • Collaborated with team members in order to ensure successful completion of tasks.
  • Performed backfilling operations after completing piping installations.
  • Inspected existing pipeline systems for defects and malfunctions.
  • Used measuring instruments like levels, transits and laser devices for accurate positioning of pipes.
  • Connected pipes with fittings such as elbows, tees, couplings, valves and clamps.
  • Completed projects within specified time frames while maintaining quality standards.
  • Tested newly constructed pipelines for leaks before commissioning them into service.
  • Operated heavy machinery including tractors, bulldozers and loaders safely at worksites.
  • Assembled prefabricated parts such as chambers, manholes, catch basins.
  • Handled assembly and installation of underground piping, fittings and valves for storm drains and water mains.
  • Repaired sanitary and storm water sewer structures and pipe systems.
  • Assessed pipes to ensure zero leakage and proper functionality.
  • Adhered to company equipment policies and safety procedures to avoid accidents and mishaps.
  • Directed equipment operators and alerted to hazards by using effective hand signals.
  • Graded and leveled trench bases using tamping machines and hand tools.
  • Located underground utilities in preparation for digging and marked locations to prevent damage.
  • Backfilled excavated locations after completion of work to protect piping and prepare for final grading.
  • Put in new fire hydrants, gate valves and fire lines to support city requirements.
  • Located existing pipes requiring repair or replacement using magnetic and radio indicators.
  • Followed written instructions, schematics and blueprints to lay out pipe in correct arrangements.
  • Operated rollers, front-end loaders and backhoes for site work.
  • Laid out and marked underground pipe routes to ensure accuracy of installation.
  • Assisted in the excavation of trenches for pipe laying.
  • Measured distances between points to determine the length of pipe needed for a job.
  • Notified supervisors of faulty operations and defective materials to improve production.
  • Logged inventory to track supply counts, organize equipment, and gather important materials.
  • Met company and OSHA safety guidelines for work site operations to minimize worker risk.
  • Sustained safety protocols to maintain secure, proper handling of equipment and materials.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Controlled traffic passing near, in or around work zones.
  • Dug ditches or trenches, backfilled excavations or compacted and leveled earth to grade specifications.
  • Lubricated, cleaned or repaired machinery or equipment.
  • Signaled equipment operators to facilitate alignment, movement or adjustment of machinery.
  • Tended pumps, compressors or generators to provide power or heat or move materials.
  • Installed sewer, water or storm drain pipes using pipe-laying machinery or laser guidance equipment.
  • Loaded or unloaded building materials to distribute machinery or tools.

Pipe Layer, Bottom Man

Park Construction
04.2017 - 07.2018
  • Installed pipes using hand tools, power tools and heavy machinery.
  • Cleaned debris from worksites following completion of tasks.
  • Analyzed blueprints and technical documents prior to starting construction projects.
  • Used measuring instruments like levels, transits and laser devices for accurate positioning of pipes.
  • Connected pipes with fittings such as elbows, tees, couplings, valves and clamps.
  • Laid out and marked underground pipe routes to ensure accuracy of installation.
  • Provided assistance in the installation of pumps, compressors and other mechanical systems related to pipelines.
  • Assembled prefabricated parts such as chambers, manholes, catch basins.
  • Handled assembly and installation of underground piping, fittings and valves for storm drains and water mains.
  • Repaired sanitary and storm water sewer structures and pipe systems.
  • Assessed pipes to ensure zero leakage and proper functionality.
  • Directed equipment operators and alerted to hazards by using effective hand signals.
  • Graded and leveled trench bases using tamping machines and hand tools.
  • Located underground utilities in preparation for digging and marked locations to prevent damage.
  • Put in new fire hydrants, gate valves and fire lines to support city requirements.
  • Operated rollers, front-end loaders and backhoes for site work.
  • Operated heavy machinery including tractors, bulldozers and loaders safely at worksites.
  • Ensured proper alignment of pipes by shimming or packing material around them.
  • Performed backfilling operations after completing piping installations.
  • Completed projects within specified time frames while maintaining quality standards.
  • Tested newly constructed pipelines for leaks before commissioning them into service.
  • Verified that all safety protocols were followed while performing duties.
  • Measured distances between points to determine the length of pipe needed for a job.
  • Inspected existing pipeline systems for defects and malfunctions.
  • Backfilled excavated locations after completion of work to protect piping and prepare for final grading.

Bottom man, Top Man, Pipe layer

Redstone Construction
08.2014 - 11.2016
  • Installed sewer, water or storm drain pipes using pipe-laying machinery or laser guidance equipment.
  • Lubricated, cleaned or repaired machinery or equipment.
  • Controlled traffic passing near, in or around work zones.
  • Dug ditches or trenches, backfilled excavations or compacted and leveled earth to grade specifications.
  • Laid out and marked underground pipe routes to ensure accuracy of installation.
  • Provided assistance in the installation of pumps, compressors and other mechanical systems related to pipelines.
  • Completed projects within specified time frames while maintaining quality standards.
  • Connected pipes with fittings such as elbows, tees, couplings, valves and clamps.
  • Installed pipes using hand tools, power tools and heavy machinery.
  • Inspected existing pipeline systems for defects and malfunctions.
  • Used measuring instruments like levels, transits and laser devices for accurate positioning of pipes.
  • Assembled prefabricated parts such as chambers, manholes, catch basins.
  • Cleaned debris from worksites following completion of tasks.
  • Tested newly constructed pipelines for leaks before commissioning them into service.
  • Handled assembly and installation of underground piping, fittings and valves for storm drains and water mains.
  • Directed equipment operators and alerted to hazards by using effective hand signals.
  • Repaired sanitary and storm water sewer structures and pipe systems.
  • Located underground utilities in preparation for digging and marked locations to prevent damage.
  • Put in new fire hydrants, gate valves and fire lines to support city requirements.
  • Operated rollers, front-end loaders and backhoes for site work.

Education

East Central High School
Askov, MN

Skills

  • Pipe installation
  • Blueprint analysis
  • Heavy machinery operation
  • Pipeline inspection
  • Utility location
  • Leak testing
  • Trench excavation
  • Equipment maintenance
  • Safety compliance
  • Problem solving
  • Team collaboration
  • Effective communication
  • Time management
  • Safety procedures
  • Erosion control
  • Pipe cutting
  • Water and sewer piping
  • Utility locating
  • Trench safety
  • Pipe grading
  • Water main installation
  • Pressure testing
  • Traffic control
  • Soil compaction
  • Sewer line installation
  • Heavy lifting
  • Pipe joining
  • Equipment and tools
  • Valve installation
  • Pipe alignment
  • Positive working relationships
  • Excavation techniques
  • Backfilling procedures
  • Heavy equipment operation
  • Storm drain piping
  • Trench digging
  • Pipe bending
  • Shoring Procedures
  • Pipe layout
  • Physical stamina
  • Reliability
  • Pipe laying
  • Manhole setting
  • Backhoe operation
  • Laser levels
  • Construction math
  • Teamwork
  • Site preparation
  • Pipe joint assembly
  • Power Tools Use
  • Pipe alignment and installation
  • Drainage systems
  • Adherence to safety regulations
  • Blueprint interpretation
  • Underground utility locating
  • Organizational skills
  • Problem-solving abilities
  • Pipeline construction
  • Customer satisfaction
  • Teamwork and collaboration
  • Problem-solving

References

References available upon request.

Timeline

Pipe Layer

Triple E Water & Sewer
03.2023 - 04.2024

Pipe Layer, Bottom Man, Top Man

United Water & Sewer
08.2018 - 11.2021

Pipe Layer, Bottom Man

Park Construction
04.2017 - 07.2018

Bottom man, Top Man, Pipe layer

Redstone Construction
08.2014 - 11.2016

East Central High School
Ron Johnson