Overview
Work History
Skills
Timeline
Generic

Ronald Bass

Seneca,SC

Overview

28
28
years of professional experience

Work History

Set up 111

Itron
06.2023 - Current
  • Collaborated with team members to ensure smooth workflow and timely completion of tasks.
  • Maintained clean and organized tool sets for production runs.
  • Enhanced workplace safety by performing equipment inspections and adhering to proper procedures.
  • Improved production efficiency by setting up and maintaining machinery for optimal performance.
  • Inspected molds to identify maintenance and repair needs.
  • Maintained accurate documentation of set-up activities, including detailed logs for future reference.
  • Contributed to continuous improvement initiatives by suggesting process improvements based on observations and experience.
  • Trained staff in correct use and care of high-value production equipment.
  • Protected molds from damage through proper handling and storage between use.
  • Ensured consistent quality output by monitoring production processes and making necessary adjustments.
  • Supported engineering teams in implementing new equipment or process changes, ensuring minimal disruption to production schedules.
  • Helped team follow production standards and OSHA requirements for optimal safety.
  • Leveraged strong communication skills when working with cross-functional teams throughout the organization.
  • Optimized productivity by adjusting machine settings to meet specific job requirements.
  • Set up scheduled machines to meet demands of different production plans.
  • Effectively met tight deadlines under high-pressure environments without compromising quality standards.
  • Reduced machine downtime by conducting routine maintenance and troubleshooting issues as they arose.
  • Proactively sought opportunities for professional development through attending industry conferences, participating in training sessions, and staying current on industry trends and best practices.
  • Provided technical expertise during the development of new products or process improvements, offering valuable input from a set-up technician perspective.
  • Streamlined operations by developing standardized set-up procedures for various machines.
  • Evaluated equipment performance data to identify trends and areas in need of attention or improvement.
  • Reviewed production schedule in advance to set priorities and understand sequences.
  • Managed inventory of tools, parts, and materials needed for efficient set-up processes.

Lead Operator

US Engine Valve
12.2021 - 02.2023
  • Assigned tasks to team members based upon individual strengths and experience, realizing productivity and workflow improvements.
  • Fostered a positive work environment, promoting open communication among team members to address concerns or suggestions for improvement.
  • Completed various testing procedures for optimum work performance.
  • Supported management decision-making by compiling operational and production data into daily logs.

Team Lead

Kubota
04.2020 - 12.2021
  • Trained new team members by relaying information on company procedures and safety requirements.
  • Promoted a positive work environment by fostering teamwork, open communication, and employee recognition initiatives.
  • Served as a role model for the team by demonstrating commitment to excellence, professionalism, and adherence to company values at all times.
  • Coached team members in techniques necessary to complete job tasks.

Superintendent

Schiott Custom Homes
02.1996 - 08.2008
  • Reviewed design specifications critically for accuracy, identifying potential issues before they escalated into costly delays or rework situations.
  • Resolved conflicts efficiently among team members, fostering a positive work environment that contributed to successful outcomes.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Communicated effectively with clients throughout each stage of the project for transparency regarding progress updates as well as addressing any concerns raised promptly.
  • Managed multiple simultaneous projects while maintaining strict deadlines and adhering to budget constraints.
  • Established successful procedures for day-to-day operations and long-term planning.
  • Collaborated with architects, engineers, and contractors to achieve seamless project execution.
  • Implemented safety protocols for reduced workplace accidents and improved employee wellbeing.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Mentored junior staff, leading to increased productivity and improved teamwork throughout the organization.
  • Maintained safety onsite and upheld all OSHA regulations by Action.
  • Conducted regular site inspections to maintain compliance with industry regulations and standards.
  • Worked with specialized teams to accomplish all objectives and achieve goals.
  • Enforced rigorous safety procedures during daily operations, creating a safe working environment for all personnel involved in the project''s execution process.
  • Established effective quality control measures for consistent delivery of high-quality construction projects.
  • Scheduled and supervised maintenance and repair of equipment, buildings and grounds.
  • Resolved conflicts between staff and customers swiftly and professionally.
  • Managed complete construction process to maximize quality, cost-controls and efficiency.
  • Analyzed reports to identify areas of improvement and implement corrective action.
  • Evaluated subcontractor performance regularly, ensuring adherence to contract requirements and maintaining accountability throughout the lifecycle of each project.
  • Stepped up during foreman's absence to answer questions and delegate project tasks to employees.
  • Incorporated innovative construction techniques into projects, resulting in improved efficiency and overall quality of workmanship.
  • Optimized resource allocation to minimize delays and maximize project success.
  • Managed Number workers when performing duties in line with local and national building codes in construction.
  • Developed and maintained productive working relationships with internal and external stakeholders.
  • Monitored budgets and expenditures to maintain fiscal responsibility.
  • Championed continuous improvement initiatives within the organization, introducing new methodologies to increase productivity and reduce overall project costs.
  • Coordinated permit acquisition processes for smooth progress on all construction projects.
  • Enhanced project efficiency by streamlining communication between team members and stakeholders.
  • Developed comprehensive budgets and schedules to ensure timely project completion within allocated resources.
  • Negotiated contracts with vendors, resulting in cost savings and stronger relationships with suppliers.
  • Negotiated contracts with suppliers and vendors to confirm quality and cost effectiveness.
  • Directed Type projects producing exceptional cost savings by closely managing $Amount project budget.
  • Spearheaded efforts in sustainability initiatives, integrating eco-friendly materials and practices into construction projects.
  • Established and implemented district-wide policies followed by staff and students.
  • Directed projects according to schedule and quality demands.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Provided feedback to workers on job performance and safety procedures.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Inspected equipment and tools used for safe operation.
  • Sourced suppliers and purchased necessary materials for work.
  • Developed and maintained positive relationships with clients and other stakeholders.

Skills

  • Computer Skills
  • Maintenance troubleshooting
  • Machine Operation
  • Technical problem solving
  • Electrical Systems
  • Pneumatic Systems
  • Teamwork and Communication
  • Supply organization
  • Health and Safety Regulations
  • Blueprint Reading
  • Reading and Determining Measurements
  • Punctual and Reliable
  • Hand-Held Scanners
  • Materials Assembly
  • Production Documentation
  • Positive Attitude
  • Strong Work Ethic
  • Good Communication
  • Teamwork and Coordination
  • Attention to Detail
  • Following Instructions
  • Worksite safety
  • Material Handling
  • Punctual and Dependable
  • Safe Machine Operation
  • Production Operations
  • Inventory and Stocking
  • Quality Inspection
  • Visual Inspection
  • Safety Standards Compliance
  • Line Work
  • Equipment Operation
  • Production Processes Knowledge
  • Incident Reporting
  • Identifying Flaws
  • Assembly Line Operations
  • Equipment Setup
  • OSHA Guidelines

Timeline

Set up 111

Itron
06.2023 - Current

Lead Operator

US Engine Valve
12.2021 - 02.2023

Team Lead

Kubota
04.2020 - 12.2021

Superintendent

Schiott Custom Homes
02.1996 - 08.2008
Ronald Bass