Assist Quality Engineer (Lead) in reviewing/developing Inspection and Test Plans and relevant QC forms to be implemented on-site or off-site
Perform Site QC inspections in accordance with approved Inspection and Test Plans/Procedures
Accept/rejects the completed works offered for inspection by TSY Construction Team
Check the works in their area of responsibility for compliance with the specification and drawings
Performs progressive inspection and highlight potential nonconformities to TSY Construction Team
Review construction drawings and ensure latest approved drawings are followed
Prepare Inspection Request to be submitted to RAMPED in coordination with TSY Construction Team
Quality Control Inspector
Global Synergy Powers
06.2017 - 07.2020
processes, procedures and systems
Maintenance of accurate inspection and QCP records
Review supplier / contractor Quality Control Procedures
Investigate and rectify problems highlighted
Review and approval of all contractors welder certifications
Perform Non Destructive Testing on site, as per level 3 inspection standards
Assist and support Line Management and Supervision in all aspects of Quality, acceptance of the work and turnover undertaken by Construction Operations and ensure that the content and objectives of the Amec Foster Wheeler Quality Policy and manuals are implemented and understood by Amec Foster
Quality Control Inspector
Tradesman International
09.2013 - 06.2017
Gagepack® knowledge and/or database systems structure knowledge/experience
Good written and verbal communication skills
Strong presentation skills
Excellent written and verbal communication skills
Demonstrated excellent planning, and organizational skills
Working knowledge of DOE Standard 1212-2012
Excellent English verbal and written skills
Inventory tracking and accountability experience
Good computer literacy skill in MS Office
46 years of directly-relevant quality inspection experience
ELECTRICAL APPRENTICE
Enersys
09.2008 - 07.2013
Cut and strip wires, crimp and solder connections
Moved components and chargers to and from the work area as required
Installed circuit boards, fuses and other finish parts as required
Performed final check, revised or rework cabinets, components, and sub-assembly components as required
Used high voltage equipment to hi-pot chargers, read meters, set and interpret results of testing equipment
Troubleshoot product, make repairs and adjustments to bring chargers into specifications
Charged and label batteries for further shipment
Miscellaneous related duties as required
Assisted in material handling as needed
Inspected own work and inspected work of others to ensure the elimination of defects and enhance product quality.
CONSTRUCTION LABORER
Shaw Group Inc
04.2005 - 05.2008
Assisted in building structures for residential, business, and construction sites