Summary
Overview
Work History
Education
Skills
Timeline
Generic

Ross Newland

Leander,USA

Summary

I have been working in construction most of my life either with my family or a contractor, I am a dedicated construction professional with a strong foundation in quality assurance and process evaluation, dedicated to enhancing product quality and optimizing operational efficiency. I am committed to growing a culture of quality and excellence within teams and processes. I have been a leader on many different types of projects from industrial to general construction of chill water plants and have built a strong background in guiding teams, managing complex projects, and achieving strategic objectives. I have used my time in building my knowledge of many types of piping systems developing efficient processes, ensuring high standards, and aligning efforts with organizational goals. I have currently worked along side multiple sub-contractors to ensure their quality programs as well as ensure the installation of the UPW piping system at Samsung Taylor.

Overview

20
20
years of professional experience

Work History

Lead QA/QC Engineer

Nomura Micro Science
07.2023 - Current
  • Reviewed and oversaw the Quality programs of 3 sub-contractors
  • Approved the installation of NMS Ultra-Pure Water system
  • Reviewed and approved the hydrostatic and pneumatic testing of the Pure water system

Pipefitter

Dynamic Systems Inc
08.2021 - 01.2023
  • Proficient in Stainless Steel, Carbon Steel, Aluminum and plastic piping systems.
  • Detailed, Fabricated, and installed the supports and piping for water, steam, chemical and gas systems @ Tesla and Samsung

General Foreman/ Site Superintendent

Kilgore
03.2017 - 07.2021
  • Analyzed and evaluated project plans, budgets, and schedules
  • Provided guidance and direction to foremen and crew
  • Ensured projects were completed on time and within budget
  • Efficiently communicated with clients and team members
  • Maintained accurate and UpToDate records

Foreman

Zachry Industrial
03.2015 - 02.2017
  • Turbine Generator project in Granbury, TX.
  • Installed heavy wall carbon steel pipe for steam lines.
  • Installed Stainless Steel pipe for oil and gas lines.
  • Installed pumps, valves, and equipment that aids in the function of the STG.
  • Performed hydrostatic and pneumatic testing of those lines.
  • Wolf Hollow Steam

Pipefitter

Becon/Bechtel
Temple, TX
10.2013 - 01.2015
  • STG Power project where I installed steam, oil, gas and water lines to facilitate the power plant.
  • Set pumps and aligned.
  • Installed support systems for various piping systems.
  • Panda Power Project

Pipefitter

FOX/ TDI
02.2010 - 09.2013

Pipefitter

Bechtel/ Flour Daniels/ KBR
08.2006 - 01.2010

Education

AMT license - Aviation Maintenance

Spartan College of Aviation
Tulsa, OK
09-2006

Skills

  • Bluebeam
  • Navis
  • Teams
  • Excel
  • PowerPoint
  • In-process inspection
  • Corrective actions
  • Final inspection
  • Pressure testing
  • Visual inspection
  • Preventive actions
  • Quality inspections
  • Root-cause analysis
  • Welding inspection

Timeline

Lead QA/QC Engineer

Nomura Micro Science
07.2023 - Current

Pipefitter

Dynamic Systems Inc
08.2021 - 01.2023

General Foreman/ Site Superintendent

Kilgore
03.2017 - 07.2021

Foreman

Zachry Industrial
03.2015 - 02.2017

Pipefitter

Becon/Bechtel
10.2013 - 01.2015

Pipefitter

FOX/ TDI
02.2010 - 09.2013

Pipefitter

Bechtel/ Flour Daniels/ KBR
08.2006 - 01.2010

AMT license - Aviation Maintenance

Spartan College of Aviation
Ross Newland