Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic
Rossana  Do Espirito Santo

Rossana Do Espirito Santo

Luanda, Talatona,Angola

Summary

Combines practical knowledge with leadership skills to develop high-performing service teams. Problem-solves tactically to eliminate operational delays. Together we achieve more, therefore my communication and team-work skills. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.

Overview

7
7
years of professional experience
6
6
years of post-secondary education

Work History

Maintenance supervisor

Schlumberger
Luanda, Angola
11.2022 - Current
  • Led team of 12 technicians and 4 engineers for maintenance execution.
  • Improved asset availability by reducing the asset turnaround time.
  • Liaised with internal clients to determine scope of work and project requirements.
  • Monitored maintenance priorities from different projects and allocated labor resources to meet expected demands.
  • Ensured implementation of maintenance process through the computerized maintenance management system and standard work adherence.
  • Supported on materials and supplies (M&S) planning and ordering to deliver on time by providing input to the manager for M&S stock on hand and M&S needed to fulfill work orders on hand.
  • Managed workshop resources for maintenance execution by keeping workshop inventories updated to enable timely stock reorder and replenishment.
  • Ensured technicians and engineers utilize maintenance business systems to reach full cost, time and equipment traceability for maintenance performance.
  • Supported continuous improvement culture and initiatives.
  • Completed detailed inspection audits on specified timeframe to promote satisfaction and safety.
  • Engaged with the local and international suppliers for acquiring products and services as needed.

Maintenance Engineer

Schlumberger
Luanda, Angola
08.2019 - 10.2022
  • Carried out scheduled preventative maintenance requests for the assets assigned to active projects.
  • Created Maintenance control panel to measure efficiency and schedule compliance.
  • Tracked all maintenance records on Computerized maintenance management system,
  • Created quarterly preventive maintenance plans for assets from different projects ( mainly for B17, B32, B15).
  • Reduced by 8,28% the asset depreciation cost by following up on overall maintenance and shipment progress of assets from Angola to China and India.
  • Prepared and presented technical presentations.
  • Supported on maintenance promotional checklist project for Subsea maintenance population worldwide.

Global Asset Coordinator (Temporary)

Schlumberger
Luanda, Angola
11.2020 - 05.2021
  • Supported on assets Import/Export for Global Operation ensuring assets availability to cover the locations demand.
  • Managed subsea asset utilization and consequently reduced depreciation cost for the locations.
  • Ensured all asset movements and disposal are captured in all related business systems for subsea landing string worldwide.
  • Supported on Write off of assets for 7 subsea locations worldwide (Angola, Argentina, Australia, Brazil, Egypt, Malaysia and UK)
  • Participated in Physical Asset Count for remote locations as Kuwait & Saudi Arabia and Mexico and as well active locations as UK and Angola as preparation of SAP deployment.
  • Managed the asset disposal and cold stack process, maintaining updated and clean accounting records.


Packaging Technology Assistant

Coca-Cola Bottling Luanda
Luanda, Angola
12.2016 - 08.2018
  • Created losses control reports and time optimization.
  • Evaluated the lines capability to improve its performance.
  • Tested raw materials and choose according to the quality and cost;
  • Engaged with local and external suppliers for process improvement ;
  • Verified and analyzed the critical control points of process weekly.
  • Worked on Personal Qualification and development project, Developing a tool based on company requirements for personal evaluation in three departments (Production, syrupery and Husky) with 80 employees in total .
  • Coordinated Water saving KPI's aligned with Coca-Cola Company.
  • Line set up time reduced by 27% with 5S and SMED implementation.

Education

Engineer Degree - Industrial engineering

Polytechnic Institute of Technology and Science
Luanda,Angola
03.2012 - 12.2016

Engineer Degree - Industrial Engineer

Federal University of São Carlos
São Paulo, Brazil
09.2015 - 09.2016

Skills

  • MS Project
  • Excel proficiency
  • Power Point
  • Power BI
  • Communication and Team Work
  • Adaptability
  • Planned Preventative Maintenance (PPM) scheduling
  • Root cause failure analysis
  • Lean management
  • KPI management
  • Site audits
  • Facilities maintenance
  • Team management
  • Materials requisition

Languages

Portuguese
Native
English
Upper intermediate (B2)

Timeline

Maintenance supervisor

Schlumberger
11.2022 - Current

Global Asset Coordinator (Temporary)

Schlumberger
11.2020 - 05.2021

Maintenance Engineer

Schlumberger
08.2019 - 10.2022

Packaging Technology Assistant

Coca-Cola Bottling Luanda
12.2016 - 08.2018

Engineer Degree - Industrial Engineer

Federal University of São Carlos
09.2015 - 09.2016

Engineer Degree - Industrial engineering

Polytechnic Institute of Technology and Science
03.2012 - 12.2016
Rossana Do Espirito Santo