Summary
Overview
Work History
Education
Timeline
Generic

Roy Gutierrez

Junction City,OR

Summary

Provide the highest level of customer service Effective working alone or as a cooperative team leader with strong organizational skills Responsible, dependable, punctual and take pride in my work Follow all safety policy and procedures to promote an environment of effectiveness and efficiency Thorough in handling all details of job, paying attention to quality requirements

Overview

9
9
years of professional experience

Work History

Installer

Discount Windows,We Do Windows, Doors And Installation For Less
Junction City, OR
05.2018 - Current
  • Installed windows and doors with precision and attention to detail.
  • Utilized hand and power tools for efficient installation processes.
  • Collaborated with team members to ensure project timelines were met consistently.
  • Assisted in measuring and preparing spaces for accurate installations.
  • Trained new hires on installation techniques and safety practices effectively.
  • Maintained inventory of installation supplies, ensuring availability for projects.
  • Identified opportunities for process improvements, enhancing overall efficiency during installations.
  • Laid out materials and system components to prepare for installation.
  • Operated tools, equipment, and machinery according to safety standards.
  • Enhanced customer satisfaction by providing timely and accurate installations.
  • Collaborated with team members to ensure smooth workflow and successful project completion.
  • Maintained a safe work environment by strictly adhering to safety protocols and guidelines.
  • Achieved high levels of client satisfaction, carefully tailoring installation solutions to individual needs.

Production Manager

Discount Windows,We Do Windows, Doors And Installation For Less
Junction City, OR
05.2017 - Current
  • Oversaw production schedules to ensure timely completion of window and door installations.
  • Trained team members on safety protocols and operating machinery effectively.
  • Streamlined workflow processes to enhance productivity in manufacturing operations.
  • Coordinated with suppliers to maintain inventory levels and reduce lead times.
  • Developed training materials to support employee onboarding in production techniques.
  • Resolved issues quickly to maintain productivity goals.
  • Managed multiple projects concurrently, ensuring timely completion and meeting budget constraints.
  • Sourced materials to keep up with production goals and meet customer demands.
  • Delivered direct feedback to senior management regarding project visibility and status.
  • Reviewed maintenance and repair problems to determine appropriate action for resolution.

Delivery Driver

Discount Windows,We Do Windows, Doors And Installation For Less
Junction City, OR
05.2017 - Current
  • Delivered windows and doors efficiently to residential and commercial locations
  • Ensured timely and accurate deliveries while adhering to safety protocols
  • Loaded and unloaded delivery vehicles, optimizing space for safe transport
  • Maintained vehicle cleanliness and functionality, performing routine inspections

KIS Construction
Eugene, OR
  • House remodeling
  • Clean-up
  • Removal and Installation of plumbing, dry wall, and other utilities

First National Tap House
Eugene, OR
  • AM Kitchen Opener and Line cook
  • Food Preparations such as – Brisket, Prime Rib, Chicken Cordon Bleu
  • Get Line Ready
  • Fire up all the meats and prepare vegetables
  • Put together ingredients to make sauces and aioli
  • Decide and invent different restaurant specials to cook for each day

Maintenance-State of Oregon
Ontario, OR
  • Maintain city parks and roadways
  • Loaded and unloaded trucks by hand using pallet jacks
  • Clean building floors by sweeping, mopping, and scrubbing
  • Mix water and detergents in containers to prepare cleaning solutions, according to specifications
  • Restock supplies and equipment needed for cleaning and maintenance duties
  • Service, clean and supply kitchens and restrooms

Drywall-Mike Johnson Contractor
Eugene, OR
  • Hang dry lines to wall moldings to guide positioning of main runners
  • Remove and install insulation between studs, and tack plastic moisture barrier over insulation
  • Remove plaster, drywall, or paneling
  • Measure and marks cutting lines on framing, drywall and trim, using tape measure, straightedge or square, and marking devices
  • Trims rough edges from wallboard to maintain even joints
  • Fits and fastens wallboard or sheetrock into specified position, using hand tools, portable power tools or adhesive

Education

GED - undefined

Lochner High School
Albany, OR

Timeline

Installer

Discount Windows,We Do Windows, Doors And Installation For Less
05.2018 - Current

Production Manager

Discount Windows,We Do Windows, Doors And Installation For Less
05.2017 - Current

Delivery Driver

Discount Windows,We Do Windows, Doors And Installation For Less
05.2017 - Current

KIS Construction

First National Tap House

Maintenance-State of Oregon

Drywall-Mike Johnson Contractor

GED - undefined

Lochner High School
Roy Gutierrez