Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Roy Mendez

Elberta,AL

Summary

Knowledgeable leader with record of accomplishment on diverse construction projects. Translates directives of architects, constructions managers and clients into actionable on-site directives to consistently meet project demands. Expert in tackling problems head-on and maintaining strict standards. Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills. Committed job seeker with a history of meeting company needs with consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.

Overview

8
8
years of professional experience

Work History

Superintendent

Lord & Son Construction
Fort Walton Beach, FL
11.2021 - Current
  • Maintained accurate records such as daily logs, time sheets, inspection reports, for each project.
  • Attended and participated in progress and project meetings.
  • Maintained safe work site by implementing safety requirements and good housekeeping regulations.
  • Oversaw employee productivity to enforce efficient use of materials and equipment.
  • Conducted regular meetings with contractors, subcontractors, laborers to review progress and address any issues, concerns.
  • Supervised staff including subcontractors and laborers on assigned projects.
  • Planned, managed and coordinated construction activities to ensure timely completion of projects.
  • Coordinated installation activities for projects to promote smooth workflow and achieve quality standards.
  • Adhered strictly to company policies and procedures while overseeing operations at the site.
  • Ensured that all subcontractors are in compliance with contract documents by conducting regular inspections of their workmanship.
  • Inspected construction sites regularly to detect potential safety hazards and ensure compliance with safety protocols.
  • Recognized and enforced quality standards through daily inspection of construction sites.
  • Monitored construction schedule to deliver highest quality product on time and within budget.
  • Oversaw complete construction process to maximize quality, cost controls and efficiency.
  • Reviewed project proposals, estimates, schedules and contracts related to the project.
  • Collaborated with engineers, architects and other professionals to discuss plans and resolve design issues.
  • Met and worked with internal teams to recognize and discuss current and future needs.
  • Developed strategies for cost control, scheduling, quality assurance and problem solving.
  • Negotiated changes or modifications in contracts as needed during the course of a project.
  • Created work crew schedules and delegated assignments.
  • Prepared and planned worksites to help jobs run smoothly.
  • Delegated work to staff, setting priorities and goals.
  • Delegated duties to employees based on skillset.
  • Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
  • Kept detailed progress records to hit strict deadlines and adjust plans.
  • Built and established strong partnerships with teams, vendors and contractors.
  • Led meetings with internal team members, consultants and contractors.
  • Reviewed Shop drawing submittals from sub-contractors

Construction Superintendent

Birkshire Johnstone
Pensacola, FL
06.2021 - 11.2021
  • Reviewed project plans, specifications, and change orders to ensure accuracy and completeness.
  • Resolved conflicts between general contractors, subcontractors, vendors, inspectors, or owners in a timely manner.
  • Coordinated material deliveries with suppliers to maintain an uninterrupted flow of materials to the job site.
  • Responded quickly when issues arose on-site by evaluating solutions that would minimize delays or additional expenses.
  • Communicated regularly with clients throughout the duration of the project in order to keep them informed of progress.
  • Developed and monitored construction schedules to ensure projects were completed on time and within budget.
  • Educated employees in proper use of personal protective equipment and enforced safety requirements to minimize workplace accidents.
  • Inspected earthwork, concrete, structural steel, decking, fireproofing, framing and finish work.
  • Maintained written daily log of job site activities for permanent records.
  • Maintained records of all changes made during construction process including cost estimates and labor hours worked.
  • Eliminated project lags by inspecting work-in-progress to maintain pace, compliance and top quality control.
  • Guided and directed third-party inspectors throughout project.
  • Supervised projects to uphold schedule requirements and quality demands.
  • Established expectations and motivated crews to consistently meet or beat goals.
  • Planned material and equipment needs to drive on-time delivery in concert with project schedule.
  • Assigned rotating work schedules to maximize coverage and maintain productivity.
  • Rolled out new processes to achieve operational excellence.
  • Increased productivity by improving employee morale and cross-functional communications.
  • Defined and monitored personnel and project schedules to ensure on-time project completion.

Supervisor

RC Construction Services
Greenwood, MS
12.2019 - 06.2021
  • Monitored construction progress, communicated project updates and identified potential problems or delays.
  • Conducted daily site inspections to ensure safety regulations were being adhered to.
  • Ensured that all safety protocols were strictly followed at all times throughout the duration of the project.
  • Supervised crew to facilitate top quality and achievement of project milestones.
  • Reported to superintendents with project updates and estimated completion dates, noting delay issues.
  • Reviewed plans, blueprints and drawings for accuracy of measurements and specifications.
  • Mitigated risk, coordinating plans and specifications to ensure safety and OSHA compliance.
  • Created weekly schedules and daily workflows to support adequate project coverage.
  • Supervised projects to uphold schedule requirements and quality demands.
  • Planned and managed manpower and resource requirements to support project activities.
  • Communicated with employees to demonstrate high standards and mitigate issues.
  • Delegated work to staff, setting priorities and goals.
  • Kept production team moving forward for progress in daily site operations.

Construction Foreman

Bocci Group
Santa Rosa Beach, FL
12.2016 - 12.2019
  • Inspected forms, footings, and foundations for accuracy in accordance with plans and specifications.
  • Calculated concrete quantities needed for jobs.
  • Poured concrete into forms using pump hose and leveled.
  • Ordered necessary supplies such as formwork, rebar, and cementitious materials, as needed for each job site.
  • Removed debris and waste to clean site after completing work.
  • Operated excavators and loaders to prepare site.
  • Reviewed blueprints and other drawings to identify correct grades.
  • Conducted daily safety meetings with crew members prior to beginning work.
  • Scheduled inspections, meetings, pours and workers for over 10 jobs.
  • Ensured that all workers followed safe operating procedures while working around heavy machinery.
  • Assigned and supervised personnel to ensure tasks were completed efficiently.
  • Managed scheduling of crews based on weather conditions and availability of materials and equipment.
  • Constructed forms to create various concrete structures.
  • Analyzed blueprints and drawings for specific job requirements.
  • Trained and hired 15+ new employees on concrete processes, safety protocols and company expectations.
  • Set up scaffolding, braces, and other temporary structures to support crew during work.
  • Maintained accurate records of labor hours, material costs, and other related expenses.
  • Adapted concrete mixing techniques in terms of client wishes and atmosphere.
  • Positioned wire mesh and rebar to reinforce concrete.
  • Led team of various workers on numerous construction projects from start to finish.
  • Worked with teammates to move steel forms.
  • Dismantled forms using basic and advanced tools.
  • Read site layouts and developed plans for concrete pouring and mixing.
  • Resolved any conflicts among personnel or equipment issues in a timely manner.
  • Led weekly team meetings with crew members to discuss upcoming jobs or changes in procedure.
  • Prepared and planned worksites to help jobs run smoothly.
  • Delegated duties to employees based on skillset.

Carpenter

Ard Contracting Inc.
Birmingham, AL
12.2015 - 11.2016
  • Used various carpenter's hand tools, portable power tools and standard measuring instruments.
  • Operated power tools safely when performing carpentry tasks such as drilling holes into lumber pieces.
  • Cut timber, panels and other wooden materials according to measured dimensions.
  • Stripped off formed surfaces once they had set properly according to design plans.
  • Set up, aligned, leveled, and braced forms as per engineering specifications.
  • Filled joints between sections of forms with mortar or grout material.
  • Assisted in the construction of concrete forms for various structures and projects.
  • Placed anchor bolts into wet cement to secure structural members in place.
  • Installed steel reinforcing bars into concrete forms prior to pouring concrete.
  • Measured and cut wooden boards to specific dimensions for formwork fabrication.
  • Learned project dimensions and form design by effective blueprint reading.
  • Maintained clean and organized workplace to optimize performance, efficiency and safety.

Education

High School Diploma -

Foley High School
Foley, AL

Skills

  • Continuous Improvement
  • Strategic Planning
  • Quality Assurance
  • Fiscal planning
  • Program implementation
  • Employee discipline
  • Subcontractor Management
  • Construction management
  • Blueprint Interpretation
  • Blueprint and schematic understanding
  • Commercial construction experience
  • Project Coordination
  • Scheduling Coordination
  • Relationship building and management
  • Key decision making
  • Site preparation
  • OSHA Regulations
  • Layout planning
  • Subcontractor coordination
  • Schedule Coordination

Languages

Spanish
Professional

Timeline

Superintendent

Lord & Son Construction
11.2021 - Current

Construction Superintendent

Birkshire Johnstone
06.2021 - 11.2021

Supervisor

RC Construction Services
12.2019 - 06.2021

Construction Foreman

Bocci Group
12.2016 - 12.2019

Carpenter

Ard Contracting Inc.
12.2015 - 11.2016

High School Diploma -

Foley High School
Roy Mendez