PROFESSIONAL SUMMARY
Overview
Work History
Education
Skills
ADDITIONAL INFORMATION
Languages
Timeline

RUBEN CAVAZOS

Cooper Steel
Edinburg
1
Language
7
years of professional experience

Safety tech with osha 30 with 6 years of experience in machine installation, maintenance, and troubleshooting, specializing in valve technology and flowback operations. Demonstrates strong skills in equipment inspection and conveyor systems, ensuring efficient and safe production processes. Committed to fostering teamwork and continuous improvement in safety protocols across diverse industrial environments.

Work History

undefinedundefined
  • Safety tech with osha 30 with 6 years of experience in machine installation, maintenance, and troubleshooting, specializing in valve technology and flowback operations. Demonstrates strong skills in equipment inspection and conveyor systems, ensuring efficient and safe production processes. Committed to fostering teamwork and continuous improvement in safety protocols across diverse industrial environments.

MAINTENANCE TECH

11 Months
ImiCA | 01.2023 - 12.2023
  • Making sure fuji production machine is maintenance and installed the right way make sure every sensor is working
  • Make sure you inspect product before sending out and turn on systems for production.
  • Make sure production machine is running at all time and is able to maintain while in shift.
  • Make and identify the issue by see function of the machine to fix any issue that might be messing up production.
  • Install conveyer bed set up photo eyes set up mount to conveyor run and rout wiring
  • Setting up telecommunication and WiFi
  • Set up wire harness in side cable tray to set up .
  • Run CAT 5,6 Wap cabling for WiFi and phone lines run cabling
  • Make service loops and hang cable hangers to run cables in the ceiling and walls of the building
  • Terminate cables in each cubical and rooms
  • Test all cables to makes sure there in the right areas and work
  • Tsi

INSTALLER LEVEL 4

2 Years
Kroger | 01.2020 - 01.2022
  • In charge of a large group with any type of install with in the distributions.
  • Layout: platforms, conveyor beds on the floor and in the air.
  • Install: incline and decline
  • Details: resin decking, guard rails, side pan, belly pan under guard. Netting
  • Beds. Charge, intermediate, discharge, gravity beds mvr beds, curves, rat beds
  • Structural: in charge of installing steel and columns
  • Preventable maintenance for distributions: making sure packing in motors are good clean up greases.
  • Make sure grounds are good on conveyor beds make sure the product is to its spec.
  • Make sure belts are put on right and make sure knife is sharp to cut a new belt piece if needed.
  • Make sure the run is 1/8 to 1/4 away from the side pan if not adjust on sprocket and standby.
  • 2020 - 2022
  • California

Millwright

1 Year 6 Months
ITS | 01.2024 - 07.2025
  • Building platforms/ deck for ovens
  • Aligned and install beams and columns for oven support bring and setting beams and columns for secondary level for ovens
  • Set up ventilation systems, optimizing air flow and safety.
  • Setting up ductwork for ventilation for ovens
  • Conducted pipe fitting for varied pressure systems, ensuring operational efficiency.
  • Pipe fitting working with low pressure/ high pressure 2,3,4,5,6
  • Set up/ build pipe racks and threading tool area
  • Line up 6” pipe and install gaskets assemble 1”,2”valves on manifold and install gasket and torque to spec
  • Install pressure gauges using thread glue and Teflon tape on manifold
  • Leak test all manifold on ovens and ensuring leak-free performance.
  • Built platforms and decks for oven installations, ensuring structural integrity.
  • Aligned and installed beams and columns for oven support, enhancing stability.
  • Set up ventilation systems, optimizing air flow and safety.
  • Conducted pipe fitting for varied pressure systems, ensuring operational efficiency.
  • Installed and tested manifold components, ensuring leak-free performance.

Ironworker

9 Months
Cooper Steel | 01.2026 - Current
  • Erected structural steel beams and columns according to blueprints and alignment specifications.
  • Rigged material for crane lifts using slings, shackles, and hoists.
  • Bolted and torqued connections to secure steel framework safely and accurately.
  • Installed metal decking, stairs, and handrails on commercial construction sites.

Education

High School Diploma

Edinburg High School | Edinburg, TX | 05.2016

510 safety course at UTA Arlington, Texas

Skills

Millwright
Maintenance
Machine Installation
Valve Technology
Flowback Operations
Equipment Inspection
Troubleshooting
Rigging
Torque Testing
Conveyor Systems.

ADDITIONAL INFORMATION

  • RELOCATION
  • Willing to relocate: Anywhere

Languages

Spanish
Native or Bilingual

Timeline

Ironworker

Cooper Steel
01.2026 - CurrentRead More

Millwright

ITS
01.2024 - 07.2025Read More

MAINTENANCE TECH

ImiCA
01.2023 - 12.2023Read More

INSTALLER LEVEL 4

Kroger
01.2020 - 01.2022Read More

Edinburg High School

High School Diploma
Read More
RUBEN CAVAZOS