Proven Construction Foreman with a track record of leading teams to exceed project goals while maintaining budget and quality standards. Expert in equipment coordination and crew oversight, adept at enhancing site efficiency and implementing OSHA-compliant safety protocols. Demonstrated ability to improve project delivery by 30%, showcasing exceptional project management and negotiation skills. Hardworking Construction Foreman bringing almost 3 decades of progressive experience. Quality-focused and diligent with excellent communication, multitasking and time management skills. Focused Foreman considered expert in planning, assigning and directing work tasks. Dedicated team player committed to maintaining safe, clean job sites. Pursuing role where hard work and dedication will be highly valued.
Overview
27
27
years of professional experience
1
1
Certification
Work History
Heavy Equipment Operator
Alamo city constructors
San Antonio
11.2024 - Current
Operated heavy machinery to complete excavation and grading tasks.
Conducted daily inspections to ensure equipment safety and functionality.
Collaborated with team members to coordinate site operations effectively.
Construction Foreman
Burtech Pipeline
04.2017 - Current
Asserted control over material usage and contractor man-hours to keep projects in line with budgetary restrictions.
Delegated assignments based on plans, project needs, and knowledge of individual team members.
Interacted with employees to demonstrate high standards and mitigate issues effectively.
Supervised material usage and contractor man-hours to keep projects in line with budgetary restrictions.
Supervised field crews to maximize quality and work efficiency.
Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.
Verified and submitted team timesheets.
Coordinated materials to maintain steady flow and meet productivity objectives.
Delivered reports to construction manager to detail project updates and likely completion dates, noting delays, and causes.
Studied and interpreted blueprints to plan construction phases and team assignments.
Completed accurate material and labor estimates for jobs ranging from small to large budgets.
Inspected work for compliance with applicable regulations and job specifications.
Evaluated team member strengths and assigned tasks based upon expertise and background.
Analyzed project blueprints and specifications to identify exact number of laborers needed to complete job.
Identified and eliminated safety risks through additional training.
Reworked positions and workflow based on individual abilities and production targets.
Evaluated incoming materials for quality and amounts ordered.
Checked equipment to determine if maintenance was required.
Inspected completed work to verify quality standards and compliance with criteria.
Developed and implemented new procedures to increase productivity and constructiveness.
Addressed issues with employees and customers to manage healthy conflict resolutions.
Conducted monthly meetings with employees to discuss safety issues, status and development.
Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
Reviewed project details to specify correct materials and equipment for job sites.
Handled issues with relative ease by implementing best practices and applying critical thinking skills to find best solutions.
Construction Foreman
Ortiz Corp.
01.2011 - 04.2017
Asserted control over material usage and contractor man-hours to keep projects in line with budgetary restrictions.
Delegated assignments based on plans, project needs, and knowledge of individual team members.
Interacted with employees to demonstrate high standards and mitigate issues effectively.
Supervised field crews to maximize quality and work efficiency.
Verified and submitted team timesheets.
Coordinated materials to maintain steady flow and meet productivity objectives.
Completed accurate material and labor estimates for jobs ranging from small to large budgets.
Reworked positions and workflow based on individual abilities and production targets.
Analyzed project blueprints and specifications to identify exact number of laborers needed to complete job.
Checked equipment to determine if maintenance was required.
Handled issues with relative ease by implementing best practices and applying critical thinking skills to find best solutions.
Reviewed project details to specify correct materials and equipment for job sites.
Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
Pipe Layer
Orion Construction Company Inc. Dba Orion Paving
02.2008 - 01.2011
Assembled and installed underground pipe, fittings, and valves of various sizes.
Checked and tested underground water/ sewer/storm drain lines and pipes to verify proper functionality.
Observed all safety measures and company equipment policies to prevent job site accidents.
Handled all repairs for sanitary and storm water sewer structures and pipe systems.
Graded or leveled trench bases using tamping machines or hand tools.
Located existing pipes needing repair or replacement using magnetic or radio indicators.
Covered completed pipes with earth or materials and prepared sites for grading.
Checked slopes for conformance to requirements using levels or lasers.
Reviewed schematics and measured pipes to make accurate cuts.
Read and understood drawings, written instructions and blueprints to plan work and layout pipe.
Followed plans to locate existing utilities prior to digging and flagged locations for operators.
Installed new hydrants, valves and lines to meet fire department needs and protect residents.
Used equipment such as rollers, dump trucks and front-end loaders to move important supplies.
Participated in team projects, demonstrating an ability to work collaboratively and effectively.
Excellent communication skills, both verbal and written.
Worked flexible hours across night, weekend, and holiday shifts.
Gained strong leadership skills by managing projects from start to finish.
Acted as a team leader in group projects, delegating tasks and providing feedback.
Demonstrated strong problem-solving abilities by addressing unexpected complications during pipe installation processes.
Enhanced workplace safety by consistently following standard operating procedures and wearing appropriate personal protective equipment.
Displayed adaptability by seamlessly transitioning between various types of pipe materials, including PVC, steel, and concrete pipes.
Optimized material usage by accurately determining the type, size, and quantity of pipes needed for each job site.
Collaborated with engineers and project managers to update on progress and address any unforeseen challenges promptly.
Installed various types of pipes, including PVC, concrete, and metal, ensuring efficient water and waste flow for municipal projects.
Optimized water flow in residential areas with precise installation of sewage and drainage pipes.
Laborer
Ortiz Corp
06.1999 - 06.2008
Performed general housekeeping and cleaning tasks.
Organized materials, tools, and equipment to supply team members.
Prepared job sites by removing debris and setting up materials and tools.
Loaded, unloaded, and moved material to and from storage and production areas.
Used measuring tools such as gauges and tape measure to identify conforming parts during production.
Utilized construction tools and machinery to effectively complete job site projects.
Worked alongside team to accomplish work goals according to schedule.
Observed site safety rules to maximize protections for team members and equipment.
Dug trenches, ditches and holes to allow for utility, water and sewer installation and proper foundation for structures.
Assembled and disassembled formwork to facilitate correct shaping and pouring of concrete.
Followed proper equipment operation and maintenance procedures to keep equipment in good working condition.
Understood and followed verbal and written instructions to complete work correctly.
Maintained organized and clean work areas at all times on job sites.
Identified and reported hazards on job sites to prevent accidents and injuries.
Worked on sites, installing roofs and other exterior components.
Followed instructions and safety protocols to prevent accidents and injuries.
Dug trenches, backfilled holes and compacted earth to prepare for new construction.
Used variety of hand and power tools to complete tasks.
Cleaned and maintained tools, equipment and worksites.
Loaded and unloaded materials and equipment onto and off construction sites.
Mixed and poured concrete for variety of projects.
Assisted in digging, trenching and backfilling trenches and foundations.
Loaded and unloaded materials onto trucks and trailers.