Summary
Overview
Work History
Education
Skills
Timeline
Generic

Russell Davidson II

4946 Sw 121st Rd Webster ,FL

Summary

Results-driven Riggin Foreman at TEiC Construction with expertise in load calculation and crew supervision. Proven track record of enhancing safety compliance and optimizing workflow efficiency, leading to successful project completions within budget. Dependable leader skilled in problem-solving and fostering teamwork to achieve operational excellence.

Overview

2025
2025
years of professional experience

Work History

Riggin Foreman

TEiC Construction
  • Supervised rigging operations to ensure compliance with safety regulations and industry standards.
  • Coordinated daily tasks and schedules for rigging crew, optimizing workflow efficiency.
  • Trained new team members on equipment handling and safety protocols to enhance team performance.
  • Conducted regular inspections of rigging equipment to maintain operational integrity and reliability.
  • Collaborated with project managers to align rigging operations with overall project timelines and objectives.
  • Optimized load handling techniques to minimize risks associated with heavy lifting operations and protect valuable assets.
  • Developed cost-effective solutions for complex rigging challenges, ultimately delivering projects within budget constraints.

General Foreman

Wood Group
North Fort Myers, FL
03.2024 - 06.2024
  • Supervised daily operations to ensure project timelines and quality standards were met.
  • Coordinated workforce schedules to optimize productivity and resource allocation.
  • Implemented safety protocols, reducing workplace incidents through training and compliance monitoring.
  • Mentored junior staff on best practices, improving team performance and efficiency.
  • Evaluated work processes, identifying areas for improvement in workflow efficiency.

Structural Welder

Liquid Metal Coatings
North Dakota
01.2020 - 06.2021

Outage work

Boilermaker

Midstate Sms
Lakeland Florida
01.2015 - 06.2018
  • Fabricated and assembled boiler components using welding and cutting techniques.
  • Interpreted blueprints and technical drawings to ensure accurate installations.
  • Conducted inspections to identify defects and ensure compliance with safety standards.
  • Assisted in maintaining equipment, enhancing operational efficiency through preventive maintenance.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Assembled and analyzed boilers for defects.
  • Cleaned and maintained boilers and associated equipment to increase efficiency and performance level.
  • Achieved timely project completion by effectively managing resources, schedules, and deadlines while working on multiple projects simultaneously.
  • Assembled and installed boilers, tanks and vats according to blueprints and specifications.

Education

GED -

Roosevelt Highschool
San Antonio, TX
12-2014

Skills

  • Hazard identification
  • Heavy lifting
  • Load calculation
  • Load balancing
  • Job site coordination
  • Sling selection
  • Signal communication
  • Hoisting techniques
  • Rigging inspection
  • Fall protection
  • Lift planning
  • OSHA compliance
  • Teamwork
  • Dependable and hardworking
  • Problem-solving
  • Construction safety
  • Reliability
  • Worker supervision
  • Forklift operation
  • Lockout and tagout
  • Crew supervision
  • Physical stamina

Timeline

General Foreman

Wood Group
03.2024 - 06.2024

Structural Welder

Liquid Metal Coatings
01.2020 - 06.2021

Boilermaker

Midstate Sms
01.2015 - 06.2018

Riggin Foreman

TEiC Construction

GED -

Roosevelt Highschool