Summary
Overview
Work History
Education
Skills
Timeline
Generic

Ryan Robb

Rancho Cucamonga,CA

Summary

I have over 28 years experience in all aspects of construction and maintenance. My expertise includes flooring, paint, drywall, plumbing, electrical, and HVAC to name a few but I am proficient in most trades. Through my years of vast experience I have been able to accumulate most of the tools needed to execute most projects.

Overview

24
24
years of professional experience

Work History

Construction

Self Employed
01.2000 - Current
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Worked with contractors and other tradespeople to meet project specifications and deadlines.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Operated power equipment to move materials and promote job efficiency.
  • Installed drywall, flooring and other interior finishes to create finished and functional living and work spaces.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Observed safety regulations on job sites to minimize accidents.
  • Followed blueprints and diagrams to complete projects according to specifications.
  • Dug trenches and set up forms to specified requirements for concrete pours.
  • Assembled and disassembled scaffolding and ladders to guarantee safety of workers while performing tasks at heights.
  • Conducted daily site inspections to identify potential safety hazards.
  • Used variety of hand and power tools to complete tasks.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Loaded and unloaded materials onto trucks and trailers.
  • Cleaned and maintained tools, equipment and worksites.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Provided labor support to carpenters, masons and other skilled trades.
  • Completed tear-down of existing structures to prepare for new construction.
  • Mixed and poured concrete for variety of projects.
  • Installed drywall, siding and other structural components.
  • Assisted in digging, trenching and backfilling trenches and foundations.
  • Inspected tools and equipment to maintain safety and efficiency.
  • Helped with door and window installations.
  • Operated forklifts and boom lifts to complete various tasks.
  • Finished surfaces of woodwork or wallboard in houses and buildings with paneling, paint and hand tools.
  • Helped with erecting scaffolding and ladders.

Education

Alta Loma High School
Alta Loma, CA

Skills

  • Measurement and Calculation Accuracy
  • Safe Work Practices
  • Wire Strippers
  • Ditch Digging
  • Marble and Tile Cutting
  • Heavy Labor
  • Chemical Cleaners
  • Power Sanders
  • Protective Equipment Knowledge
  • Safe Equipment Usage
  • Materials Distribution
  • Customer Preferences
  • Form Construction and Removal
  • Miter Saws
  • Project Drawings
  • Vehicle and Equipment Cleaning
  • Project Support
  • Crack Sealing
  • Power Washer
  • Production Standards
  • General Housekeeping
  • Technical Sketches
  • Scaffolding Disassembly
  • Carpenter Assistance
  • Water and Sewer Piping
  • Material Needs Determination
  • Demolition and Destruction
  • Operational Efficiency
  • Standard Operating Procedures Understanding
  • Bathroom Remodeling
  • Operational Safety
  • Worksite Safety and Maintenance
  • Following Supervisor Instructions
  • Soil Preparation
  • Container Placement
  • Handheld Devices
  • Preparing Job Sites
  • Installation and Finishing
  • Performing Manual Labor
  • Electric Clippers
  • Large-Scale Measurement
  • Texture Painting
  • Trash Waste and Removal
  • Regulatory Standards
  • Laser Marking
  • Joint Sealing
  • Commercial Property
  • Equipment Maintenance
  • Physical Labor
  • Team Coordination and Oversight
  • Subcontractor Management
  • Stairs and Railings
  • Adhesive and Grouting
  • Interior Painting
  • Concrete Removal
  • Protective Gear
  • Scaffold Erection
  • Physical Strength and Stamina
  • Plaster Painting
  • Air Hammers
  • Hazardous Chemical Handling
  • Materials Estimations
  • Technical Specifications
  • Basic Welding Skills
  • Personnel Protection
  • Hand Tool Operations
  • Recordkeeping Ability
  • Physical Agility and Coordination
  • Commercial Projects
  • Forklift Driving
  • Warehouse Operations Knowledge
  • Sustainable Materials
  • Remove Debris
  • Basic Electrical Knowledge
  • Safety-First Mentality
  • Minor Maintenance
  • Safety Behaviors Expertise
  • Remodels and New Construction
  • Contractual Obligations

Timeline

Construction

Self Employed
01.2000 - Current

Alta Loma High School
Ryan Robb