Summary
Overview
Work History
Education
Skills
Timeline
Generic

Ryan Nesvig

Brighton,CO

Summary

At JRB service i started out as an apprentice with no knowledge what so ever of the glazing industry. After a couple years working side by side with an experienced foreman i gained the knowledge i needed to become a lead. I was already driven by safety, quality, efficiency, professionalism and customer service. So with the newly found knowledge in glazing i was running some of the larger jobs. Some examples are:

  • CU Boulder- Fleming building. This was a renovation with Adolph Peterson. Although JRB was not directly responsible for the demolition part of the job, i did have the opportunity to see some of the procedures.
  • ANB Bank- Cheyenne WY. Working for the customer directly, on this job we replaced all the glass and the exterior metal panels. The glass was replaced from the interior, the building was occupied and operational which meant working closely with the occupants on scheduling and planning.
  • Presbyterian St. Lukes- Denver CO. This was another full renovation, the GC was Layton construction. Again, JRB was not responsible for the demo part of the job but i had the opportunity to see first hand the steps needed for containment in a fully operational hospital. Our scope was installation of new storefront in all exterior openings and interior storefront as well.
  • Randolph center- Boulder CO. This was an interesting and challenging job. It was built in 1976 using a pressure fit storefront system which started to fail. We were hired directly by the customer to retrofit a new exterior system and glass. In order to complete this we had to basically cut the entire face of the building off using skill saws and grinders, then reinstall new components and glass. This building was occupied and a strict schedule was needed to ensure tenants were affected little as possible.
  • Apple campus- Austin TX. This was a newly built complex that a car drove through the lower level of the building, in one end and out of the other, damaging the curtain wall glazing system. On this job we were hired to demo the damaged areas and replace with new and finish with it looking like nothing ever happened.

In addition to the jobs listed above i have ran many other successful smaller jobs over the years with JRB, many of which had small demolition details involved.

If hired by Fiore and Sons i would bring a good attitude, willingness to learn, good work ethic and hopes to grow within the company.

Overview

16
16
years of professional experience

Work History

Foreman

JRB Service
09.2015 - 04.2026
  • Supervised daily operations to ensure adherence to safety protocols and efficiency standards.
  • Coordinated workflow among team members to optimize resource allocation and project timelines.
  • Trained new employees on equipment operation, safety procedures, and operational best practices.
  • Monitored job site activities, resolving issues promptly to maintain project schedules.
  • Implemented process improvements that enhanced productivity and reduced downtime across multiple projects.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Enhanced team productivity by providing clear direction, setting expectations, and offering constructive feedback.
  • Conducted thorough quality control checks to ensure high standards of workmanship across all projects.
  • Developed strong relationships with clients, subcontractors, and suppliers, fostering open communication channels for smooth project execution.
  • Collaborated with project managers in planning stages, advising on schedule adjustments and potential obstacles.


Wireline Operator

Baker Hughes
06.2010 - 06.2015
  • Operated wireline equipment to execute logging and perforating operations efficiently.
  • Conducted routine maintenance on tools to ensure optimal performance and reliability.
  • Collaborated with team members to enhance safety protocols during field operations.
  • Provided training and mentorship to junior operators on equipment handling procedures.

Education

High School Diploma -

Bradshaw Mountain
Prescott Valley, AZ
05-1992

Skills

  • Attention to detail
  • Crew leadership
  • Decision-making
  • Effective communication
  • Worksite safety
  • Quality control
  • Daily reporting
  • Work Planning and Prioritization
  • Materials management
  • SQUAPS: This was a term i presented to our team at JRB Safety, Quality, Unity, Attitude, Planning, Speed To me this represents what i stand for

Timeline

Foreman

JRB Service
09.2015 - 04.2026

Wireline Operator

Baker Hughes
06.2010 - 06.2015

High School Diploma -

Bradshaw Mountain
Ryan Nesvig