
Ryan Willard, 778459, 06/04/18 to present, Assembly, Built A and B series after-coolers for mainline, Built Brake oil coolers for zone 3, Built Tier 4 subs, Built Turbos for mainline, Built Water manifolds and Regulators, Mainline, Zone 2 Turbos, NOPS 3rd shift, Installed Short parts on 3500 engines mainly Flowerpots and turbos during ULB parts shortage, Installed Heads, Changed out piston rings and rods., Worked on any other engines that needed finished to make RTS the following day, Main stalls, Built 3600 engines from short block up to finish, DGB recon area, Disassembly and rebuild of DGB engines, 3500 assembly cells 3rd shift, Assembled 3500 assembly cell engines on 3rd shift, Machine Repairmen, Perform preventative maintenance on Cat equipment, CLS warehouse, Zone 2 turbo install 1st shift, 6 months, 3500 NOPS, 3500 Assembly cells, Back Half AT stalls, DGB recon 3rd shift, Safety Champion Team, Helped roll out the new CSI Safety initiative (still currently active)