Overview
Work History
Education
Skills
Employee
Timeline
Ryan Willard

Ryan Willard

Frankfort,IN

Overview

21
21
years of professional experience

Work History

Machine Shop, Assembly, Quality, Supply Chain, Operations Support

Caterpillar
06.2018 - Current
  • Company Overview:
  • Built A and B series after-coolers for mainline
  • Built Brake oil coolers for zone 3
  • Built Tier 4 subs
  • Built Turbos for mainline
  • Built Water manifolds and Regulators
  • Installed Short parts on 3500 engines mainly Flowerpots and turbos during ULB parts shortage
  • Installed Heads, Changed out piston rings and rods
  • Worked on any other engines that needed finished to make RTS the following day
  • Built 3600 engines from short block up to finish
  • Disassembly and rebuild of DGB engines
  • Assembled 3500 assembly cell engines on 3rd shift
  • Perform preventative maintenance on Cat equipment
  • 7 Months in Operations Support
  • 31 Months in Machine Shop Maintenance
  • 4 Months in Assembly
  • 7 Months in Quality
  • 6 Months in Supply Chain
  • 31 Months in various roles

Packaging Machine Operator

Frito Lay
04.2014 - 03.2018
  • Troubleshot machine alarms and jams, repairing machines and thoroughly documenting results.
  • Replenished packaging supplies such as printer ribbon and boxes to maintain inventory.
  • Assisted in training new employees on proper machine operation, safety protocols, and company policies.
  • Improved packaging efficiency by implementing standardized operating procedures for machine setup and operation.
  • Operated various types of packaging machines, adapting quickly to different product requirements and packaging materials.
  • Maintained high quality standards by routinely inspecting finished products for defects or deviations from specifications.
  • Reduced downtime by performing regular maintenance checks and troubleshooting packaging equipment issues.
  • Enhanced production speed with a focus on optimizing machine settings and processes.
  • Consistently met or exceeded daily production goals while maintaining high-quality output and minimal waste generation.
  • Contributed to continuous improvement initiatives by providing feedback on machine performance and suggesting process improvements.

Owner/Operator

Jiffy Lube
07.2003 - 11.2013
  • Managed day-to-day business operations.
  • Provided exceptional customer service, addressing issues promptly to ensure customer satisfaction and repeat business.
  • Increased customer satisfaction by providing high-quality services and timely communication.
  • Managed daily operations for optimal efficiency, streamlining processes to reduce costs.
  • Spoke professionally with customers regarding complaints, gathering all necessary information to make educated decisions and address issues.
  • Developed and implemented successful marketing strategies, resulting in increased brand awareness and customer base.
  • Established strong relationships with suppliers, ensuring consistent delivery of goods and services at competitive prices.
  • Developed business plan, processes and procedures to provide superior Product or Service to customers.
  • Cultivated a positive work environment, leading to higher employee retention rates and overall job satisfaction.
  • Implemented effective financial management practices, improving cash flow and profitability.

Education

H.S. Diploma -

Clinton Prairie Jr/Sr High, Frankfort, IN
05.2001

Skills

  • Warehouse operations
  • Continuous improvement initiatives
  • Supplier relationship management
  • Logistics management
  • Supply chain management
  • Staff management
  • Performance tracking

Employee

Ryan Willard, 778459, 06/04/18 to present, Assembly, Built A and B series after-coolers for mainline, Built Brake oil coolers for zone 3, Built Tier 4 subs, Built Turbos for mainline, Built Water manifolds and Regulators, Mainline, Zone 2 Turbos, NOPS 3rd shift, Installed Short parts on 3500 engines mainly Flowerpots and turbos during ULB parts shortage, Installed Heads, Changed out piston rings and rods., Worked on any other engines that needed finished to make RTS the following day, Main stalls, Built 3600 engines from short block up to finish, DGB recon area, Disassembly and rebuild of DGB engines, 3500 assembly cells 3rd shift, Assembled 3500 assembly cell engines on 3rd shift, Machine Repairmen, Perform preventative maintenance on Cat equipment, CLS warehouse, Zone 2 turbo install 1st shift, 6 months, 3500 NOPS, 3500 Assembly cells, Back Half AT stalls, DGB recon 3rd shift, Safety Champion Team, Helped roll out the new CSI Safety initiative (still currently active)

Timeline

Machine Shop, Assembly, Quality, Supply Chain, Operations Support - Caterpillar
06.2018 - Current
Packaging Machine Operator - Frito Lay
04.2014 - 03.2018
Owner/Operator - Jiffy Lube
07.2003 - 11.2013
Clinton Prairie Jr/Sr High - H.S. Diploma ,
Ryan Willard