worked on swecos rotexs bag Houses dryers bucket elevators etc..
tracked belts
Industrial Maintenance Mechanic
Birdsong peanut plant
Gorman, TX
01.2022 - 10.2023
Performed preventive maintenance on equipment to minimize down time and extend life of equipment.
Replaced defective parts, such as bearings, seals, valves and other components.
Assembled, installed and repaired electrical wiring, conduit systems and fixtures.
Repaired hydraulic systems including pumps, motors and cylinders.
Rebuilt worn out components in order to restore them to their original condition.
Operated a variety of hand tools such as wrenches, grinders, drill presses and saws.
Fabricated metal machine parts when needed
Responded quickly to emergency repair requests from production personnel.
Ordered required spare parts from suppliers when necessary.
Conducted preventive maintenance and repairs on equipment.
Understands all equipment in depth from electric motors, gearboxes, conveyors, hydraulics, load out chutes, gas and diesel engines, vehicle and machine repairs, with the ability to trouble shoot, analyze, and make quick responsive repairs without guidance
• completed work order effectively and efficiently
•optimized on downtime to operate more efficiently when running
Unit Operator
Invicta hydrostatic testing
Levelland, TX
01.2020 - 02.2021
Performed hydrostatic testing of pressure vessels, pipelines and related components according to applicable safety regulations.
Verified accuracy of test data and recorded results in logbook for future reference.
Calibrated instruments and gauges used in the testing process.
Maintained a safe working environment by adhering to established safety procedures.
Monitored pressure levels during the hydrostatic testing process to ensure accuracy of readings.
Provided technical guidance and assistance to junior technicians as required.
Kept records of all tests conducted along with any repairs or modifications made during the process.
Reviewed reports submitted by other team members after completing their respective tasks.
Evaluated current procedures used in the hydrostatic testing process and made recommendations for improvement where necessary.
• rebuilt plug Valves chicksens bop’s etc..
Identified process improvement opportunities by analyzing existing processes and developing new solutions.
Developed and implemented process related projects, initiatives and programs to improve operational efficiency.
Monitored performance of processes to ensure they are meeting the established standards and goals.