Dedicated and results-driven SAP PP Consultant with four years of hands-on experience in implementing, configuring, and optimizing SAP Production Planning solutions. Skilled at working with cross-functional teams to improve overall operational efficiency and optimize production processes. Demonstrable experience in completing SAP PP project effectively, guaranteeing on-time, within-budget deployments while satisfying customer expectations. Competent in identifying business requirements, developing solutions, and offering clients professional advice, all of which lead to better production planning and execution. Strong interpersonal and communication skills, a dedication to lifelong learning, and knowledge of the most recent SAP best practices and technology. Adept at identifying problems and coming up with creative solutions for challenging production problems. Wishing to use experience to help companies succeed that are trying to improve their production planning skills.
● Analyzed the as-is condition of the client’s existing manufacturing system and carried out the to-be analysis through business process re-engineering and configuration.
● Performed fit-gap analysis by conducting business discussions with core team and business process workshops for Blueprint design.
● Documented critical changes, trained client team about the new system functionality.
● Participated in configuration and customization of PP functionalities for master data (materials, BOMs, routings and production versions), product master data, MRP, work centers, rate routing, and product cost collectors.
● Configured purchase order types, order type dependent parameters, and scheduling agreement types.
● Configured and executed the shop floor activities including creation of orders, conversion of planned orders, goods movements, order confirmations and availability check.
● Interacted with the controlling team to solve issues related to costing sheet, activity pricing, work center, activity type, cost center assignment, and product cost collectors.
● Used net requirements planning strategy and transferred data to demand management.
● Implemented repetitive manufacturing environment for production activities.
● Worked on planned order parameters for defining the order profile, availability check, control keys for routing data.
● Defined reporting points for the back-flush process.
● Configured order types, REM profiles, and MRP parameters.
● Maintained plant parameters such as MRP controller, MRP groups, MRP types, Lot sizing procedure, availability check for components, and conversion of procurement proposals.
● Created a variant for MRP run and scheduled a background job to run every weekend.
● Responsible for maintenance of number ranges for inventory documents, info records, and source list for purchase materials.
● Worked along with technical consultants and developed customized reports for PP and MM module.
● Involved and coordinated unit and integration testing with other modules and created test scenarios.
● Achieved the Go-Live date and provided Go-Live and Post live support.
● Conducted end user training, institution of help desk and end user documentation.