Summary
Overview
Work History
Education
Skills
Languages
Certification
Affiliations
Timeline
Generic

Salvador Gutierrez

Mount Angel,OR

Summary

Skilled Concrete Pump Operator with expertise in boom positioning and pump pressure control for efficient material transfer. Inspected equipment for safety, maintained team communication, and enforced quality assurance during concrete pours. Managed equipment cleaning and maintenance to uphold operational reliability and safety standards while solving problems in high-pressure environments to ensure timely project completion.

Overview

2
2
Languages
1
1
Certification
6
6
years of professional experience

Work History

Concrete Boom Pump Operator

Efficient Construction LLC
Beaverton, Oregon
04.2025 - Current
  • Operated concrete pump equipment for Efficient Construction LLC jobsite placements.
  • Positioned boom and line pumps to reach designated pour areas.
  • Monitored concrete flow and adjusted pump pressure during pours.
  • Communicated with foremen, truck drivers, and crew during pumping operations.
  • Inspected pump hoses, valves, and controls before each shift.
  • Lubricated and maintained machines prior to setup, calibration and operation.
  • Cleaned pump systems, lines, and hoppers after concrete delivery.
  • Attached pump hoses securely to ensure proper material transfer. and pipelines to transfer material.

Line pump/Boom Pump/Mobile mix driver

JR Concrete Pumping
Tigard, Oregon
05.2020 - 04.2025
  • Operated concrete pump truck for residential and commercial job sites.
  • Positioned pump setup for safe concrete placement at work sites.
  • Inspected truck, boom, and hoses before each delivery route.
  • Communicated with dispatch, crew, and customers during daily deliveries.
  • Checked loads to ensure that cargo was secure and distributed evenly.
  • Conducted pre-trip inspections prior to departure including verifying load details and confirming route information.
  • Utilized GPS and maps for efficient route planning.
  • Saved fuel by leveraging GPS to identify faster routes.
  • Prepared documents such as bills of lading, invoices, receipts, proof of delivery documents.

Education

Associate of Arts - Oregon Transfer

Chemeketa Community College
Salem, OR
05.2001 -

Skills

  • Concrete pumping
  • Boom positioning
  • Pump pressure control
  • Hoses and valves
  • Equipment calibration
  • Machine operation
  • Safety compliance
  • Equipment cleaning
  • Problem resolution
  • Attention to detail
  • Logistics management
  • Team communication
  • Effective communication
  • Verbal communication
  • Active listening
  • Collaborative teamwork
  • Reliability
  • Stress tolerance
  • Interpersonal skills
  • Hand-eye coordination
  • Problem-solving

Languages

English
Professional
Spanish
Professional

Certification

  • CDL Class A

Affiliations

  • Spending time with my Wife, 2 year old son, and looking forward for my wife to give birth November 5th 2026

Timeline

Concrete Boom Pump Operator

Efficient Construction LLC
04.2025 - Current

Line pump/Boom Pump/Mobile mix driver

JR Concrete Pumping
05.2020 - 04.2025

Associate of Arts - Oregon Transfer

Chemeketa Community College
05.2001 -
Salvador Gutierrez