Pursuing full-time role that presents professional challenges and leverages interpersonal skills, effective time management, and problem-solving expertise.
Overview
4
4
years of professional experience
Work History
Electrician
J-Thompson Industrial and Commercial Engineering
12.2022 - Current
Installed and wired electrical transformers, service panels, and circuit breakers.
Worked on both dead and energized lines.
Installed, maintained, repaired, and tested equipment for electricity generation and utilization.
Inspected electrical systems, equipment and components to identify hazards, defects, and repair requirements.
Used testing instruments such as ohmmeters, voltmeters, ammeters, and multimeters.
Installed 120/208 volt systems and 347/600 volt systems.
worked on 12,470 high voltage power lines dead end, cutouts fuses, guy wires underground conduit, single pot, three pot, wire connections delta/delta wye/delta open delta, cornered delta, Polyphase system
taking safety measures against electrical shock by grounding all phases to ground, 12kv gloves, installing blankets on wire whether energized or not
Install 1200 amps switch gears for rock crusher, 1000 KVA transformers
Tenant improvement upgrades/add-ons, retro fit lighting/ new lighting
equipment battery chargers
underground dry utilities
cell site power upgrades
Electrician
Mc Electric
01.2021 - 11.2021
Worked from ladders, scaffolds and lifts to install, maintain, or repair electrical wiring equipment and lighting fixtures in ceilings, on roofs and on towers.
Installed and wired electrical transformers, service panels, and circuit breakers.
Installed, maintained, repaired, and tested equipment for electricity generation and utilization.
Planned layout and installation of electrical wiring, equipment, and fixtures based on specifications and applicable code.
Underground utilities
general construction, concrete, form setting, concrete finish
equipment operator, skid steer, mini ex
Electrician
Velex
01.2021 - 10.2022
lead electrician/ civil foreman
Build from ground generator site
excavate footings/ slabs
bring in my underground to generator access panel
poor concrete smooth it and give a broom finish
set generator
energize and commission site
Education
No Degree - Electrical Engineering
Mount San Antonio College
Walnut, CA
07-2027
Skills
Heavy equipment operation
Carpentry abilities
Scaffolding setup
Concrete finishing
Flooring installation
Drywall installation
Framing techniques
HVAC systems
Weatherproofing techniques
Tile installation
Electrical
Plumbing basics
Worksite safety
Painting techniques
Attention to detail
Problem-solving
Power tool operation
Basic carpentry
Multitasking and organization
Machinery operation
Drywall hanging
Equipment operation
Blueprint reading
Physical stamina
Welding proficiency
Concrete laying
Timeline
Electrician
J-Thompson Industrial and Commercial Engineering
12.2022 - Current
Electrician
Mc Electric
01.2021 - 11.2021
Electrician
Velex
01.2021 - 10.2022
No Degree - Electrical Engineering
Mount San Antonio College
Similar Profiles
Andrew CooperAndrew Cooper
Foreman at Thompson IndustrialForeman at Thompson Industrial