Accomplished Pipefitter with extensive experience at McAbee Construction Inc., recognized for optimizing workflows and enhancing safety protocols. Proficient in pipe welding and installation, demonstrating strong teamwork and problem-solving skills. Committed to delivering high-quality results while adhering to industry standards and maintaining a clean, organized work environment.
Work History
Pipefitter
1 Year 7 Months
Keiwit | 04.2025 - Current
Interpreted blueprints and isometrics to layout pipe routes for safe, accurate installation.
Installed carbon steel, stainless steel, and PVC piping using hand tools and power tools.
Measured, cut, threaded, and assembled pipe components to meet fabrication specifications.
Supported rigging and hoisting activities to position pipe, valves, and fittings efficiently.
Aligned piping systems with welders, electricians, and millwrights to maintain project flow.
Followed confined space, lockout/tagout, and jobsite safety procedures to reduce hazards.
Maintained clean work areas and organized materials to support productive field operations.
Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
Threaded pipes using piping machines.
Followed safe work practices, which included fall protection and personal protective equipment.
Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.
Installed new systems and connected piping to existing components by welding, bolting and threading.
Facilitated smooth project execution by interpreting isometric drawings for accurate installation or modification of piping systems.
Enhanced safety by conducting regular inspections of tools and equipment, ensuring proper maintenance and functionality.
Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
Contributed to overall company success by maintaining a strong work ethic, adaptability, and commitment to delivering exceptional service on all projects undertaken.
Utilized specialized tools and equipment for precise pipefitting processes, ensuring optimal results for each project.
Optimized material usage
Pipe Fitter / Welder
3 Months
McAbee Construction Inc. | 01.2025 - 04.2025
Measured, cut, and fitted pipe sections for precise weld alignment and secure structural installation.
Welded piping systems using MIG, TIG, and stick techniques to meet code and blueprint requirements.
Inspected welds and joints for defects, ensuring consistent quality and leak-free performance.
Interpreted drawings, isometric diagrams, and specifications to complete pipe assemblies accurately.
Prepared materials by cleaning, beveling, and grinding surfaces for stronger weld penetration.
Operated welding equipment and hand tools while maintaining safe, organized work areas.
Collaborated with crew members to position pipe runs and coordinate installation sequences efficiently.
Followed safety procedures and project standards to support dependable field fabrication and repair work.
Welded in flat, horizontal, vertical, and overhead positions.
Maintained correct arc length and movement speed to form specified fusion depth and bead.
Increased weld quality by utilizing appropriate techniques such as TIG, MIG, and Stick welding processes.
Set up and operated shielded metal arc and gas metal arc welding equipment.
Enhanced customer satisfaction through attention to detail in completing precise welds that met or exceeded expectations.
Optimized workflow by maintaining a clean and organized workspace to streamline the completion of tasks efficiently.
Completed projects on time and within budget by effectively prioritizing and managing workload.
Inspected welds and checked critical measurements to meet specifications.
Developed solid understanding of various metals'' properties, allowing for proper selection of filler materials for different applications.
Strengthened professional relationships with clients, colleagues, and supervisors by consistently demonstrating exceptional work ethic and dedication to project success.
Boosted productivity levels by troubleshooting and resolving issues promptly when they arose during the welding process.
Combo Pipe Welder
4 Months
ME&I | 09.2024 - 01.2025
Welded carbon steel, stainless steel, and alloy pipe using MIG, TIG, and SMAW processes.
Read blueprints, isometric drawings, and weld symbols to complete precise pipe fit-up.
Measured, cut, beveled, and aligned pipe sections for code-compliant weld preparation.
Inspected welds for defects and corrected root pass, cap, and joint alignment issues.
Verified completed welds met project specifications, quality standards, and safety requirements.
Effectively managed project documentation, maintaining accurate records of work completed, materials used, and hours logged for each assignment.
Contributed to reducing project delays by efficiently managing time and prioritizing tasks according to shifting schedules and deadlines.
Consistently met or surpassed productivity goals while maintaining strict quality control standards for all completed work.
Maintained clean workspaces by proactively removing debris and hazardous materials from the job site, promoting a safe working environment for all personnel.
Increased project efficiency with timely completion of complex welding tasks, contributing to overall project success.
Streamlined workflows by effectively organizing tools, equipment, and materials needed for daily tasks.
Improved weld quality by consistently adhering to proper welding techniques and maintaining a high level of precision in pipe alignment.
Enhanced workplace safety by diligently following established safety protocols and conducting regular equipment inspections.
Continually sought opportunities for professional growth by attending industry seminars, workshops, and training sessions related to advancements in welding technology.
Established lasting professional relationships with clients through excellent communication skills and a commitment to exceeding expectations in service delivery.
Achieved consistent weld integrity through careful preparation of materials and adherence to industry standards.
Collaborated with team members
Pipe Welder/fitter
5 Months
Travis Parker | 04.2024 - 09.2024
Interpreted blueprints and weld symbols to assemble pipe systems accurately.
Fabricated and welded piping using MIG, TIG, and stick welding processes.
Inspected welds for quality, alignment, and compliance with job specifications.
Measured, cut, and beveled pipe sections for proper fit-up and installation.
Inspected welds for defects, ensuring joints met quality and safety standards.
Prepared pipe ends through cutting, beveling, and grinding for clean weld penetration.
Maintained welding equipment, torches, and power tools for dependable daily operation.
Followed lockout, hot work, and PPE requirements to maintain safe work areas.
Collaborated with fitters and supervisors to resolve layout issues and support workflow.
Welded in flat, horizontal, vertical, and overhead positions.
Maintained correct arc length and movement speed to form specified fusion depth and bead.
Increased weld quality by utilizing appropriate techniques such as TIG, MIG, and Stick welding processes.
Collaborated with team members to complete complex pipe installations, fostering efficient teamwork and communication.
Provided valuable input during project planning phases by offering insights into potential challenges and solutions based on experience.
Improved project efficiency by accurately interpreting blueprints and welding symbols for pipe installations.
Assisted in minimizing material waste by accurately measuring and cutting pipes before welding them together.
Inspected welds and checked critical measurements to meet specifications.
Completed projects on time and within budget by effectively prioritizing and managing workload.
Optimized workflow by maintaining a clean and organized workspace to streamline the completion of tasks efficiently.
Developed solid understanding of various metals'' properties, allowing for proper selection of filler materials for different applications.
Demonstrated adaptability by quickly adjusting to changing project requirements
Pipe General Foreman
4 Years
McAfee | 04.2020 - 04.2024
Directed pipe crew activities to maintain safe, efficient workflow across active jobsite operations.
Coordinated pipe installation schedules with superintendents, trades, and inspectors to prevent delays.
Reviewed isometric drawings, plans, and specifications to verify accurate pipe layout and fit-up.
Enforced safety procedures, tool use, and housekeeping standards throughout daily field operations.
Interpreted isometric drawings and specifications to verify accurate pipe installation and layout.
Coordinated materials, tools, and equipment to maintain continuous workflow across active job sites.
Enforced safety procedures, jobsite standards, and permit requirements during field operations.
Supervised foremen and craft workers, providing guidance on installation methods and task priorities.
Inspected completed piping work for quality, code compliance, and alignment with project requirements.
Collaborated with project management, contractors, and other trades to resolve field conflicts efficiently.
Conducted regular performance evaluations for team members, identifying strengths weaknesses opportunities for improvement.
Improved project efficiency by consistently meeting deadlines through effective resource allocation and task delegation.
Ensured accurate documentation was maintained at all times relating to project progress reports, change orders, inspection records as well as other relevant data.
Reduced material waste by implementing inventory control measures and ensuring proper storage of materials.
Enhanced safety standards on job sites by conducting regular inspections, enforcing protocols, and providing ongoing training for crew members.
Collaborated with project managers to develop detailed work plans, schedules, and budgets for piping projects.
Established and enforced safety regulations, procedures and standards for construction and extraction workers.
Education
GED
Jones County Junior College | Ellisville, MS | 05.2013