Welder
1 YearNucor data systems | 10.2025 - Current
- Inspect welded surfaces for consistency and correct defects before parts move to the next stage.
- Set up machines and equipment for routine production tasks and changeovers.
- Use measurement tools to verify dimensions and support accurate fit during fabrication work.
- Handle materials safely and keep parts staged for smooth production movement throughout the shift.
- Follow shop procedures to maintain safe, clean, and efficient workstations.
Grinder
10 MonthsNucor data systems | 01.2025 - 11.2025
Grinding metals
Push break operator
Spot weld
Production Worker
11 MonthsRite screen | 01.2024 - 12.2024
- Operated production machinery to assemble window screens efficiently.
- Saw operation to cut screen
- Rf scanner
Floor Layer
1 YearNew era flooring | 09.2022 - 09.2023
- Prepared surfaces by cleaning, leveling, and repairing substrates before installation.
- Maintained flooring tools and supplies for smooth daily operations and steady installation flow.
- Installed carpet, vinyl, and hardwood flooring with consistent attention to finish quality and fit.
Laborer
1 Year 10 MonthsAluma Systems | 09.2020 - 07.2022
- Grinding sheet metals
- Material handling
- Sanding down steel and metal
- Operated tools and equipment for construction site tasks and material handling.
- Cleared work areas of debris, enhancing site safety and accessibility.