Summary
Overview
Work History
Education
Skills
Timeline
Generic

Scott Gantt

Orange,TX

Summary

Detail-oriented individual with exceptional communication and project management skills. Proven ability to handle multiple tasks effectively and efficiently in fast-paced environments. Recognized for taking proactive approach to identifying and addressing issues, with focus on optimizing processes and supporting team objectives.

Overview

17
17
years of professional experience

Work History

Crane Operator

Echo/Kiewit
02.2022 - Current
  • Performed daily safety checks to achieve safe operating condition of equipment.
  • Calculated appropriate size and weight distribution to safely manage load.
  • Excelled under pressure by safely executing demanding lifts in challenging weather conditions and tight spaces.
  • Operated large cranes to lift and move materials with precision and accuracy.
  • Used hand signals, verbal communication and radio to reduce risks in coordinating crane movements.

General Foreman

Excel Contractors
07.2018 - 01.2022
  • Worked alongside team to accomplish work goals according to schedule.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Completed final walkthroughs at job sites to close out projects.
  • Achieved timely completion of projects with strict adherence to budget constraints and quality standards.
  • Demonstrated strong leadership abilities in managing diverse teams to achieve common goals while fostering a positive work environment.
  • Delivered project updates to superintendent and detailed issues that could halt work progress.
  • Collaborated with subcontractors for seamless coordination of work scopes, ensuring smooth project execution from start to finish.
  • Prepared daily time cards and assisted in preparation of estimates and scope of work statements.
  • Prepared and submitted reports on job progress and safety conditions to upper management.

Maintenance Pipefitter

Echo/Turner/Excel
04.2009 - 06.2018
  • Ensured adherence to safety regulations by following proper procedures when working with hazardous materials or confined spaces during pipe repairs or installations.
  • Improved system efficiency by identifying and repairing pipe leaks in a timely manner.
  • Streamlined workflow by fabricating custom pipe supports and hangers for unique system configurations.
  • Achieved rapid response times with effective communication and coordination among team members during emergency repair situations.
  • Reduced downtime with prompt troubleshooting and resolution of system and equipment issues.
  • Collaborated with other maintenance team members to complete complex repair projects successfully.
  • Assisted in the development of comprehensive maintenance plans to proactively address potential issues within the facility's piping infrastructure.
  • Contributed to cost savings through effective materials management, including procurement, inventory control, and disposal of excess materials.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.

Boilermaker

JVIC
02.2008 - 03.2009
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Maintained compliance with all safety procedures from both client and employer.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Inspected equipment and structures to determine scope of work (SOW).
  • Inspected and lubricated valves; removed, replaced, or installed components to correct operating deficiencies.
  • Assembled and analyzed heat exchangers for defects.
  • Removed boiler casings, grades, handrails, manhole, and hole covers to facilitate access to boilers or other vessels for repair.

Instrumentation Fitter

Becon Construction
11.2007 - 02.2008
  • Maintained a clean and organized work environment, ensuring adherence to safety protocols at all times.
  • Partnered with cross-functional teams to ensure seamless communication throughout projects, resulting in successful outcomes.
  • Elevated overall work quality through consistent adherence to industry best practices while carrying out tasks related to instrumentation fitting.

Education

High School Diploma -

Deweyville High School
Deweyville, TX
05-2007

Skills

  • Nccer Pipefitter
  • Nccco Crane Operator
  • Leading teams
  • PM of systems and equipment
  • Job site maintenance
  • Performing final fit and makeups for pump alignments
  • Mechanical troubleshooting and diagnostics
  • Site inspections
  • Daily planning
  • Safety practices
  • Documentation skills

Timeline

Crane Operator

Echo/Kiewit
02.2022 - Current

General Foreman

Excel Contractors
07.2018 - 01.2022

Maintenance Pipefitter

Echo/Turner/Excel
04.2009 - 06.2018

Boilermaker

JVIC
02.2008 - 03.2009

Instrumentation Fitter

Becon Construction
11.2007 - 02.2008

High School Diploma -

Deweyville High School
Scott Gantt