Summary
Overview
Work History
Education
Skills
Timeline
Generic

Scott Hiatt

Honolulu,HI

Summary

Thorough Engineering Technician equipped with strong attention to detail and recognize potential issues before problems occur. Highly alert while performing job tasks and determined problem-solver.

Overview

26
26
years of professional experience

Work History

Engineering Technician

NAVFAC PEARL HARBOR
PEARL HARBOR , HAWAII
02.2022 - Current
  • Update Maximo Program assets information. Ensures program contains accurate information that coincides with assets in field.
  • Work Utilities Infrastructure and Condition assessment Program (UICAP); carefully grades assets on 5 domains; asset based on visual defects or deterioration, performance capability within its limits, preventative maintenance (PM) procedures, performance reliability and degradation index score.
  • Ensures data in Internal Navy Facility Assets Data Store (iFADS) match property records assigned to NAVFAC. Take corrective actions if data is incorrect or missing.
  • Work Existence and Completeness (E&C) to ensure equipment in field coincides with Maximo data and iNFADS. Make corrections if data is incorrect upon field verification

High Voltage Electrician

NAVFAC PEARL HARBOR
Pearl Harbor, Hawaii
09.2015 - 02.2022
  • Troubleshoot and repair primary and secondary cable and breakers.
  • Work electrical section Preventable Maintenance program to better insure equipment reliability.
  • Work as temporary Work Leader; provide estimated cost of repair and time frame of projects.
  • Waste Accumulation Point Manager; ensure used transformer oil is completely extracted, properly handled, and stored into barrels from out-of-service transformers according to EPA and local laws.
  • Complete necessary paperwork for transfromer and oil pick up for disposal.

Planning Non-Commissioned Officer In-Charge

United State Air Force
Lackland Air Force Base , Texas
10.2011 - 02.2015
  • Conducted site visits to plan placement of equipment and interconnection to site's existing electrical system.
  • Read and interpreted electrical, mechanical and architectural drawings and electrical code specifications for wiring layouts.
  • Worked with various types of cableways, conduits and other electrical raceways.
  • Used testing instruments such as ohmmeters, voltmeters, ammeters and multimeters.
  • Installed and wired electrical transformers, service panels, and circuit breakers.

Electrical Non-Commissioned Officer In-Charge

United States Air Force
Hickam Air Force Base, Hawaii
10.2008 - 10.2011
  • Managed 37 Electric Shop Personnel for electrical system, fire alarm systems and security alarm systems.
  • Oversaw daily operations for installation, maintenance and repair of electrical systems.
  • Provided daily electrical emergency response teams.
  • Provided non-emergency requirements within 30 calender days.
  • Provided Commander and Superintendent Rough Order Magnitude cost of repair.

Electrical Systems Craftsman

United States Air Force
Anderson AFB, Guam
06.2006 - 10.2008
  • Led electrical construction for monumental movement of three squadrons for U.S. Pacific Command.
  • Reconfigured high voltage layout of three buildings.
  • Planned project order of operation for each building.
  • Created project cost for each phase of construction.
  • Accomplished advanced medical training to better aid personnel in event of weather condition injury.

Electrical Systems Craftsman

United States Air Force
Scott Air Force Base, IL
01.2002 - 06.2006
  • Troubleshot and repaired problems with components of energized and de-energized electrical distribution systems.
  • Installed and maintained high voltage electrical systems and parts.
  • Worked with facility personnel to identify and administer electrical system upgrades while maintaining needed material and equipment.
  • Read and followed drawings, blueprints and other technical documentation to make accurate updates.
  • Led crew to safely isolate and repair of high voltage cable and equipment damage caused by 104 mile per hour winds.

Electrical Systems Journeyman

United States Air Force, USAF
Ramstein Air Base Germany
07.1999 - 01.2002
  • Installed, troubleshot and repaired primary and secondary distribution cable.
  • Provided cost estimates and timelines for major projects to key personnel.
  • Maintained critical area lighting for military housing and headquarters.
  • Maintained and repaired fire alarm and intrusion detection systems for critical facilities.
  • Maintained airfield lighting system to ensure sorties requirements are met.

Electrical Systems Journeyman

United States Air Fore
Nellis Air Force Base, NV
07.1995 - 07.1999
  • Troubleshot and repaired problems with components of energized and de-energized electrical distribution systems.
  • Replaced and repaired lighting fixtures and electrical control and distribution equipment.
  • Interpreted drawings, wiring diagrams, flow charts and written descriptions of project requirements.
  • Studied building schematics to determine location of wiring and equipment.
  • Troubleshot and repaired critical airfield lighting circuit.

Education

Project Management

American InterContinental University
Schaumburg, IL
11.2016

Electrical Mechanical Technology - Electrical Mechanical Technology

University of Maryland - College Park
College Park, MD
2002

Skills

  • Maximo
  • Existence and Completeness Program (E&C)
  • Utilities Infrastructure and Condition Assessment Program (U-ICAP)
  • Internal Naval Facilities Asset Data Store program (iNFADS)

Timeline

Engineering Technician

NAVFAC PEARL HARBOR
02.2022 - Current

High Voltage Electrician

NAVFAC PEARL HARBOR
09.2015 - 02.2022

Planning Non-Commissioned Officer In-Charge

United State Air Force
10.2011 - 02.2015

Electrical Non-Commissioned Officer In-Charge

United States Air Force
10.2008 - 10.2011

Electrical Systems Craftsman

United States Air Force
06.2006 - 10.2008

Electrical Systems Craftsman

United States Air Force
01.2002 - 06.2006

Electrical Systems Journeyman

United States Air Force, USAF
07.1999 - 01.2002

Electrical Systems Journeyman

United States Air Fore
07.1995 - 07.1999

Project Management

American InterContinental University

Electrical Mechanical Technology - Electrical Mechanical Technology

University of Maryland - College Park
Scott Hiatt