Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Scottie Darryll Helton

Tahlequah

Summary

Dynamic foreman with extensive experience in supervising piping installation projects. Skilled in team collaboration and implementing quality control measures to enhance operational efficiency and ensure safety standards.

Overview

5
5
years of professional experience
1
1
Certification

Work History

Pipefitter

Platinum
Tulsa, Oklahoma
11.2025 - 04.2026
  • Managed piping systems by fabricating, assembling, installing, and maintaining components to ensure operational efficiency.
  • Installed piping systems based on blueprints and specifications, ensuring compliance with industry regulations and operational requirements.
  • Executed assembly and disassembly of boilers, tanks, vats, pressure vessels, exchangers, and heaters per blueprint specifications to meet safety and performance standards.
  • Using blueprints, laid out scale drawings of pipe systems and supports.
  • Measured and marked pipes for cutting and threading.
  • Installed valves, pumps, pressure gauges and other components of piping systems.

General Foreman

3s
Tulsa, Oklahoma
07.2025 - 11.2025
  • Supervised daily operations to ensure compliance with safety regulations.
  • Coordinated team schedules to optimize workflow and resource allocation.
  • Monitored project progress, providing timely updates to management to facilitate informed decision-making.
  • Implemented quality control measures, ensuring adherence to high standards throughout project lifecycle.
  • Collaborated with subcontractors to ensure timely task completion.
  • Documented labor hours, crew attendance and individual performance.
  • Followed rules and regulations to keep job sites safe for workers, contractors and visitors.
  • Communicated regularly with team members about changes in scope or schedule.
  • Supervised, trained, and evaluated personnel, fostering compliance with company policies and enhancing team capabilities.
  • Oversaw all aspects of construction, including scheduling personnel and supplies.
  • Estimated time, material, and labor costs used in project plans.
  • Reviewed blueprints and specifications prior to starting job to fully understand project scope.
  • Performed final walkthroughs of each job and prepared reports.
  • Maintained accurate records of daily operations including time cards, production data logs.
  • Collaborated with engineers and architects on design modifications when necessary.
  • Planned and managed manpower and resource requirements to support project activities. Used Navis Work, BIM and Blue Beam.

Mechanical Pipefitter

Cobb Construction
Colorado Springs, Colorado
12.2024 - 07.2025
  • Fitted mechanical parts and systems using hand tools and power tools for precision and accuracy.
  • Cut pipes precisely according to specific blueprint layout and bent them to fit designated configurations.
  • Leveled industrial equipment with optical level and aligned using theodolite; created floor markings for production line layout of boilers, chillers, cooling water structures, and plate exchangers.
  • Installed various industrial instruments and equipment in compliance with technical specifications.
  • Assembled mechanical components according to engineering specifications and project requirements.
  • Assembled mechanical components according to technical specifications and drawings.
  • Read technical drawings and schematics to understand assembly processes clearly.
  • Made sure that mechanical parts were properly fit and assembled while observing tight project deadlines.
  • Tested equipment after installation to check for issues and correct.
  • Contributed to development of technical drawings and blueprints for assemblies and components.
  • Overhauled systems by executing detailed work orders and instructions.

Foreman/Journeyman Pipefitter

Piping Enterprise Company
Sand Springs, Oklahoma
03.2022 - 09.2024
  • Supervised daily operations for piping installation and repair projects, ensuring adherence to safety standards and project timelines.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Coordinated with other departments to ensure project deadlines were met.
  • Checked project details to verify job site materials and equipment.
  • Viewed and checked job equipment to determine maintenance requirements.
  • Conducted visual inspections of products for quality compliance.
  • Assisted in developing and revising quality control procedures, enhancing compliance and operational efficiency.
  • Maintained accurate inspection records in accordance with company policies, supporting accountability and quality assurance.
  • Verified accuracy of production processes by measuring dimensions, angles, and other parameters using precision instruments.
  • Performed detailed measurements with handheld devices and performed visual inspections of line.
  • Read blueprints and manuals to determine test procedures or adjustment methods.
  • Checked software programs for usability, functionality, and design issues. Walked down P&IDs after lines and equipment were installed.

Journeyman Pipefitter

Integrated Service Co.
Tulsa, Oklahoma
01.2022 - 03.2022

Installed piping systems for various commercial and industrial projects, ensuring compliance with specifications.

  • Read and interpreted blueprints to ensure accurate installations.
  • Diagnosed pipe system issues and implemented effective solutions.
  • Inspect completed installations for accuracy and compliance with applicable codes or regulations.
  • Worked inside boilers, installed valves, and verified installed piping lines using Navis Work and CAD systems for cooling water systems.
  • Assembled and disassembled boilers, tanks, vats, pressure vessels, exchangers, and heaters to meet blueprint specifications.

Quality Control Inspector

Mohawk Field Services
Tulsa, Oklahoma
10.2021 - 12.2021
  • Inspected materials for defects and ensured compliance with quality standards.
  • Assessed materials, parts and products for conformance with quality control requirements and production specifications.
  • Ensured that all products met customer requirements prior to shipment.
  • Documented inspection results through reports and logs, summarizing data for quality database.
  • Recommended improvements to production processes, enhancing compliance with quality control standards.
  • Assisted in developing quality control procedures for improved efficiency.
  • Analyzed data from process control systems, identifying trends to inform quality assurance strategies.
  • Analyzed plans, specifications and blueprints to understand product requirements.
  • Oversaw proper tagging and identification of parts and components, enabling rejected or non-repairable parts to be properly marked, quarantined and rendered unusable.
  • Read blueprints and manuals to determine test procedures or adjustment methods.
  • Checked software programs for usability, functionality, and design issues.

General Foreman

Industrial Piping Companies
Sapulpa, Oklahoma
11.2020 - 08.2021
  • Oversaw construction operations, scheduling personnel and supplies to maintain workflow efficiency and project timelines.
  • Directed subcontractor activities to ensure quality workmanship and compliance with contract specifications, enhancing project reliability.
  • Monitored project progress and provided timely updates to management to facilitate informed decision-making.
  • Monitored project progress to ensure efficient use of resources and timely completion of tasks.
  • Collaborated with subcontractors to ensure timely task completion.
  • Implemented quality control measures to maintain high standards.
  • Reviewed blueprints and specifications prior to starting job to fully understand project scope.
  • Performed inspections of completed work prior to acceptance by client or owner representative.
  • Performed final walkthroughs of each job and prepared reports.
  • Maintained accurate records of daily operations including time cards, production data logs.
  • Documented labor hours, crew attendance and individual performance.
  • Coordinated materials procurement with suppliers, contractors, and subcontractors.
  • Assisted in inventory management and material ordering processes.
  • Studied project specifications to plan sequence and schedule for pipe installations.
  • Oversaw fabrication processes for job-specific components.
  • Studied project specifications to plan sequence and schedule for pipe installations.

Education

Some College (No Degree) -

Rogers State University
Claremore, OK

Skills

  • Pipe installation
  • Industrial piping systems
  • Welding techniques
  • Blueprint reading
  • Quality assurance
  • Equipment servicing
  • System integration
  • Pipe manufacturing
  • Team collaboration

Certification

  • Mechanical Journeyman PP-1

Timeline

Pipefitter

Platinum
11.2025 - 04.2026

General Foreman

3s
07.2025 - 11.2025

Mechanical Pipefitter

Cobb Construction
12.2024 - 07.2025

Foreman/Journeyman Pipefitter

Piping Enterprise Company
03.2022 - 09.2024

Journeyman Pipefitter

Integrated Service Co.
01.2022 - 03.2022

Quality Control Inspector

Mohawk Field Services
10.2021 - 12.2021

General Foreman

Industrial Piping Companies
11.2020 - 08.2021

Some College (No Degree) -

Rogers State University
Scottie Darryll Helton