Overview
Work History
Education
Skills
Languages
Timeline
Generic

Sebastian Chester

Gurdon,Arkansas

Overview

5
5
years of professional experience

Work History

Painting

LDC
06.2021 - Current

Painting

Experience with interior painting on Kingdom hall projects and very limited exterior experience on disaster relief

  • Removing trim
  • Sanding trim, cabinets
  • Deglossing trim, cabinets, doors
  • Deglossing with an ethanol based deglosser
  • Painting using brush on trim, cabinets, doors, walls
  • Experience cutting in on walls
  • Rolling paint onto walls
  • Very limited experience spraying paint onto cabinet doors

Drywall

Repairing crack and holes where ceiling fans hung in drywall on the inside roof

  • Scraping acoustic off roof
  • Spreading mud onto roof
  • Used drywall tape to cover where crack was
  • Used metal drywall patch to fill hole where ceiling fans hung in roof

Janitorial Services

Chester Enterprises
05.2018 - Current

VCT Type Tile Flooring

  • Mopping: cleaning any spills, spots, or residue on floor with neutral cleaner designed to neutralize any acidic or basic agents that may damage tile
  • Buffing: polishing wax on floor
  • Scrubbing: scrubbing tile on floor, cleaning any spots, spills, or residue
  • Stripping Wax: completely removing old wax off of floor, cleaning any spots, spills, and residue on floor
  • Laying Wax: laying new coats of wax onto floor to prolong life of tile and make it look more attractive

Carpet

  • Vacuuming any dirt or other debris found on carpet
  • Spraying cleaning chemicals onto carpet to help extract dirt, drinks, chemicals, and other things spilled that could damage or make carpet unattractive
  • Wand Extractor: using wand that sprays water and allows extraction of dirt, spills, or chemicals in carpet
  • Bonnet: using bonnet that agitates dirt in carpet, allowing it to be extracted

Concrete Flooring

  • Sweeping floor of any dirt or other debris
  • Scrubbing concrete floors of any dirt, spills, or residue found, prolonging life of floor and making it more attractive
  • Sealing concrete by mopping sealer onto it, prolonging life of floor

Post-Construction Cleanup

  • Completely disinfecting all surfaces of new hospital wing, including walls, railings, equipment, furniture, and lights

Terminal Cleaning

  • Completely disinfecting general patient rooms and operating rooms in hospital

General Cleaning of Siplast, a Commercial Roofing Plant

  • Collecting trash of bathrooms, breakrooms, labs, and offices
  • Wiping surfaces, including counters, tables, desks, and toilets in bathrooms, breakrooms, labs, and offices
  • Sweeping of and dirt or debris, including limestone dust, asphalt granules, etc.
  • Mopping VCT, LVT, and concrete flooring of spills and tar
  • Dusting of any dust or cobwebs found

Roofing

LDC
04.2018 - Current

Asphalt Shingles

  • Tearing off asphalt shingles
  • Cleaning roof of any nails, staples, and old tar/felt paper to prepare for new roofing material
  • Replacing damaged plywood
  • Laying new felt as underlayer for shingles using pop-cap nails and pneumatic staple guns
  • Laying shingles with pneumatic nail guns, including 3 tabs on edge of roof, in valleys, and in field
  • Installing ridge cap

Metal Roofing

Galvanized Tin Sheet Metal Roofing: disaster relief in Puerto Rico

  • Tearing off old sheet metal panels
  • Installing new sheet metal panels using metal self tapping screws.

Standing Seam: installing standing seam type metal roofing on Kingdom Halls.

  • Cleaning roof of any nails, staples, and old tar/felt paper to prepare for new roofing material
  • Laying new felt using pneumatic staple guns
  • Laying felt with adhesive back
  • Installing sheet panels in field
  • Installing sheet panels in valley
  • Cutting and installing Z-Bar for ridge cap
  • Installing ridge caps

Scaffolding

LDC
04.2018 - Current

Scaffolding

Erecting Scaffolding

  • Erecting scaffolding around Kingdom Halls and homes
  • Assembling using OSHA approved wooden boards for walking planks
  • Assembled using metal walking planks
  • Experienced erecting on multi-leveled scaffolding projects
  • Led crew (under overseer's direction) on Kingdom Hall project

Teardown

  • Dismantling scaffolding around Kingdom Halls and homes
  • Experience dismantling on multi-leveled scaffolding projects

Concrete Laborer

LDC
04.2018 - Current

Demolition

Concrete: On a Kingdom Hall project, working on a parking lot

  • Using sledge hammer to break concrete pieces into smaller ones
  • Shoveled, leveled ground to prepare for pouring of concrete
  • Helped set wood to prepare for concrete pour

Maintenance

Parking Lot Maintenance, caulking joints and cracks to prolong life of parking lot

  • Crack chasing: grinding cracks in concrete to widen them in preparation of caulking them
  • Cleaning cracks and joints of any dirt, debris, or plants
  • Laying backer rod in joints and cracks in preparation of caulk
  • Shooting caulk into joints
  • Tooling caulk to make sure it bonded to each side of crack or joint to protect from water

Education

High School Diploma -

Gurdon High School
Gurdon
05.2016

Skills

Scaffolding

Roofing

Concrete

Floor Technician

  • LVT
  • Carpet
  • Terminal Cleaning

General Cleaning

Saying Yes Sir

Languages

Chinese (Mandarin)
Elementary

Timeline

Painting

LDC
06.2021 - Current

Janitorial Services

Chester Enterprises
05.2018 - Current

Roofing

LDC
04.2018 - Current

Scaffolding

LDC
04.2018 - Current

Concrete Laborer

LDC
04.2018 - Current

High School Diploma -

Gurdon High School
Sebastian Chester