
Dynamic Instrument Technician with extensive experience at Limak-Ictas-Astaldi, skilled in field instrumentation and measurement devices. Proven track record in executing precise surveying operations and enhancing team performance through effective multitasking. Committed to delivering high-quality results while ensuring reliability and accuracy in all project phases.
Thorough team contributor with strong organizational capabilities. Experienced in handling numerous projects at once while ensuring accuracy. Effective at prioritizing tasks and meeting deadlines.
Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
I carried out pile point staking operations for the foundation strengthening works of the 36-story G Yoo Project developed by MAR-YAPI and performed all required surveying and measurement operations for the superstructure construction. I executed on-site field applications in accordance with the instructions and engineering plans provided by senior supervisors.
I supervised and actively participated in the road construction project carried out between the districts of Çan and Biga, performing measurement and surveying operations on-site throughout all stages of the project, including infrastructure works, excavation, filling, and asphalt paving.