Summary
Overview
Work History
Education
Skills
Timeline
Generic

Shane Fetch

Denver,CO

Summary

Focused Construction Project Engineer with 5+ years of experience; adept at planning, directing, and maintaining operations in various industries and scopes. Known to provide a creative and analytical approach to determine efficient solutions when presented with obstacles. Trusted to provide guidance and constructive feedback to reinforce a positive team mentality. Complete every task as assigned, receptive to feedback, adaptable, reliable and punctual.
Proficient in: BlueBeam, Microsoft Office, Microsoft Projects and ProCore

Comfortable Experience in: AutoCAD, AutoDesk Construction Cloud, BIM 360, Capterra, PlanGrid, P6 Primavera and Nialli

Overview

6
6
years of professional experience

Work History

Project Engineer

Sturgeon Electric
Loveland, CO
03.2024 - Current
  • Developed and implemented project schedules to ensure timely completion of Low Voltage scope within the established CPM Schedule.
  • Worked with General Contractor and Subcontractors to develop and manage a set of tasks to be tracked within both a detailed internal and published construction schedules.
  • Developed detailed project plans with install teams to utilize project readiness against manpower and determine methods to navigate the schedule as it changes.
  • Researched previous installations as well as innovative solutions to provide the design team with proper variables to make a educated decisions when design issues are found.
  • Utilized the RFI and submittal process to confirm design, proposals and closeout documentations are within specifications.

Project Engineer

Evergreen Innovation Group
Phoenix, AZ
06.2023 - 02.2024
  • Coordinated the construction of modular electrical room skids mainly focused on data centers.
  • Provided construction support via on-site inspections for documentation and quality assurance/control.
  • Understood, compiled and enforced contract language between subcontractors, EIG, and the general contractor through all phases of construction.
  • Involved in the change order process from coordination to procurement and eventually budget and accounts payable/receivable.
  • Prepared, maintained, and implemented various document control entities such as daily reports, material procurement logs, submittal logs, as-builts, testing and inspection logs, RFI logs, and change order logs.
  • Managed project budgets with precision, preventing cost overruns and ensuring financial integrity as well as presented this information to leadership in monthly meetings.

Project Engineer

Encore Electric
Denver, CO
07.2020 - 05.2023
  • Directed subcontractors while driving efficiencies and ensuring installation in accordance with contract documents/owner specifications.
  • Prepared estimates and worked with subcontractors to align change orders with rates and work outlined when scope was adjusted.
  • Conducted weekly recurring team meetings and coordinated impromptu technical discussions.
  • Reviewed approved designs for compliance with industry standards and implementing corrective action.
  • Managed information flow between customer and subcontractor to ensuring timely progress of work.
  • Member of electrical construction team responsible for project values exceeding 500 million

Education

High School Diploma -

Century High School
Bismarck, ND

Skills

  • Project management
  • Design and Specifications Review
  • Schedule management
  • Planning and deployment
  • Change Orders
  • Estimating and Bidding
  • Contract Compliance
  • Document management
  • Quality control
  • Subcontractor management

Timeline

Project Engineer

Sturgeon Electric
03.2024 - Current

Project Engineer

Evergreen Innovation Group
06.2023 - 02.2024

Project Engineer

Encore Electric
07.2020 - 05.2023

High School Diploma -

Century High School