Summary
Overview
Work History
Education
Skills
Timeline
Generic

Shawn Chamness

Construction
Great Falls,MT

Summary

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

5
5
years of professional experience

Work History

Readiness Logistics Manager

Air Force
Great Falls, MT
04.2021 - Current
  • Kept corporate departments and customers updated on critical shipments.
  • Planned and supervised shipments from production to end-user and scheduled daily and weekly routes.
  • Directed shipping and receiving of wide range of products daily.
  • Monitored logistics performance and identified improvement opportunities.
  • Improved inventory accuracy by developing and implementing enhanced control systems.
  • Selected, trained and developed logistics personnel to achieve high-performing teams.
  • Equipped 104 members with 267k worth of gear to prepare them for deployment. Supported 7 Deployed locations.
  • Led squadron initial issue program. Eliminated safety hazard for extreme cold for 238 personnel.
  • Scheduled 75 members for pre-deployment training at 8 global sites.
  • Reviews and corrects Defense Travel System Authorizations for 14 different career field specialty contingency training courses.

Pavements and Equipment Journeyman

Air Force
Great Falls, MT
01.2018 - 03.2021
  • Conducted maintenance and repair services to keep equipment working efficiently.
  • Maintained vehicles per manufacturer specifications, applying prescribed preventive maintenance.
  • Recorded operational failures and variances as reported by flight personnel.
  • Operates $19M worth of heavy equipment including dozers/loaders/backhoes/graders/excavators/dump trucks/sweeper/plows.
  • Snow/ice removal operations.
  • Executed COVID beddown ops. Loaded/staged 60 barriers enabling medical testing/treating 8K personnel.
  • Regraded 282K sq ft blast site/established bunker for 30 personnel enabling UXO disposal ops.
  • Trenched 80ft for power supply line replacement which restored heat to 60 residents.
  • Assisted high voltage install by trenching 800ft which powered 1 facilities and protected $132M rescue assets.

Education

High School Diploma -

Prattville High School
Prattville, AL
05.2001 -

Skills

Order picking and processing

undefined

Timeline

Readiness Logistics Manager

Air Force
04.2021 - Current

Pavements and Equipment Journeyman

Air Force
01.2018 - 03.2021

High School Diploma -

Prattville High School
05.2001 -
Shawn ChamnessConstruction