Summary
Overview
Work History
Education
Skills
Timeline
Generic

Shawn Mckuen

Ashland

Summary

Efficient Carpenter equipped with tools necessary to complete tasks on time and with little guidance.

Skilled carpenter with background in residential and commercial construction projects. Experience includes framing, finishing work, cabinetry, and custom furniture creation. Strengths lie in problem-solving, craftsmanship, and ability to work efficiently both independently and as part of a team. Contributed to improving project timelines through innovative solutions and attention to quality.

Overview

2000
2000
years of post-secondary education

Work History

Residential Roofer

Affordable roofing and construction
Ashland
  • Installed roofing materials on residential properties using various tools and techniques.
  • Inspected roofs for damage and recommended appropriate repairs to homeowners.
  • Collaborated with team members to ensure efficient project completion and safety compliance.
  • Assisted in the removal of old roofing materials before installation of new systems.
  • Trained new workers on proper roofing techniques and safety practices in the field.
  • Removed old shingles and tiles from roofs prior to installation of new material.
  • Worked closely with colleagues on larger-scale residential roofing projects.
  • Kept worksites clean by removing debris regularly throughout the duration of a project.

Drywall installer and finisher

Bob sell drywall
Moriah
  • Installed drywall sheets efficiently in residential and commercial projects.
  • Measured and cut drywall to fit various wall configurations accurately.
  • Applied joint compound and tape to seams for smooth finishes.
  • Assisted in the setup and cleanup of job sites to maintain organization.
  • Cleaned up job sites after completion of each task assigned.
  • Completed drywall finish work with exceptional quality and efficiency.

Roofer

Superior roofing and metal work
Ashland
  • Installed roofing materials on residential and commercial buildings.
  • Conducted inspections to identify roof damage and required repairs.
  • Operated power tools and equipment safely in various weather conditions.
  • Applied waterproofing techniques to enhance roof durability.
  • Assisted in training new employees on roofing processes and safety standards.
  • Removed old roofing materials prior to installation of new systems.
  • Provided guidance and instruction to apprentices on proper techniques related to roofing work.
  • Added vapor barriers or insulating materials on flat roofs.

Carpenter team lead

KV build
Ashland
  • Constructed frameworks for residential and commercial projects using various materials.
  • Installed cabinetry, trim, and moldings to enhance interior aesthetics.
  • Operated power tools safely and efficiently in diverse construction tasks.
  • Assisted in training new carpenters on proper techniques and safety protocols.
  • Installed drywall sheets onto walls or ceilings using nails or screws.
  • Installed interior trim work such as baseboards and moldings around windows and doors.
  • Repaired or replaced damaged structures or components.
  • Fitted door locksets, deadbolts and other hardware on doors according to manufacturer's instructions.
  • Positioned and installed floor joists, trusses and rafters.
  • Read blueprints, schematics and drawings to determine layout requirements.
  • Installed building windows, trim and cabinetry alone or with assistants to meet job deadlines.
  • Constructed forms for concrete pours in accordance with building codes.
  • Assisted in the installation of metal framing systems for commercial construction projects.
  • Worked independently on projects and tasks within carpentry team.
  • Communicated with teammates and supervisors frequently to understand requirements and complete projects on time.
  • Roughed in door and window frames or subflooring in structures undergoing construction or repair.

Carpenter

CMC Construction
Ashland
  • Constructed frameworks for residential and commercial projects using various wood materials.
  • Assisted in measuring, cutting, and shaping wood to meet project specifications.
  • Installed doors, windows, and cabinets following precise guidelines and safety protocols.
  • Provided support in the renovation of existing structures through remodeling techniques.
  • Adhered to safety standards to minimize risks on job sites during construction activities.
  • Performed various carpentry duties, including both rough and finish carpentry.
  • Installed drywall sheets onto walls or ceilings using nails or screws.
  • Repaired or replaced damaged or defective parts using power tools and equipment.
  • Repaired or replaced damaged structures or components.
  • Positioned and installed floor joists, trusses and rafters.

Education

Ashland High School
Ashland , Wi

Skills

  • Roofing installation
  • Drywall finishing
  • Framework construction
  • Safety compliance
  • Equipment operation
  • Time management
  • Attention to detail
  • Job site organization
  • Metal roofing
  • Roof installation
  • Weatherproofing solutions
  • Shingle application
  • Gutter installation
  • Adherence to codes
  • Waterproofing techniques
  • Flashing installation
  • Residential construction
  • Paint applications
  • Commercial roofing
  • Roofing
  • Blueprint reading
  • Safety training
  • Customer service
  • Wood shingles
  • Asphalt shingles
  • Able to lift over 50 pounds
  • Water sealant
  • Clear communicator
  • Forklift operations
  • Flat roofing
  • Self motivated
  • Rubber roofing
  • All-weather worker
  • Repair jobs
  • Low-slope roofing systems
  • Metal roofing fitting
  • Roof insulation

Timeline

Residential Roofer

Affordable roofing and construction

Drywall installer and finisher

Bob sell drywall

Roofer

Superior roofing and metal work

Carpenter team lead

KV build

Carpenter

CMC Construction

Ashland High School
Shawn Mckuen