Diligent Millwright journeyman with a solid foundation in machinery installation, maintenance, and repair. Proven track record of ensuring operational efficiency and reducing downtime through efficient troubleshooting.
Overview
10
10
years of professional experience
Work History
Journeyman Millwright
Overhead Conveyor Co
07.2025 - Current
Install and level conveyor systems including: power roll beds, turn/swing tables, and skillet
fabricate conveyor modifications along with steel
demo of old conveyor systems
Journeyman Millwright Foreman
Lesco
07.2024 - 07.2025
Layout of large conveyor systems along with cranes
rigging of heavy machinery
precision leveling of cranes and conveyor
anchoring and erecting of columns
Journeyman Millwright Foreman
International Industrial Contracting Corporation
01.2023 - 07.2024
Layout and installation of heavy machinery, along with multiple crane and conveyor systems
precision leveling machinery along with crane systems
fabrication of working platforms and columns
Journeyman Millwright General Foreman
Central Conveyor
08.2020 - 01.2023
Led installation and maintenance of all conveyor and machinery to ensure optimal operational efficiency these systems included; phosphate and ecoat dip tanks, ovens, vdls, along with multiple kinds of roller bed systems
Developed and maintained technical documentation for machinery specifications and maintenance procedures
Conducted quality control inspections on installed equipment to ensure compliance with industry standards
Worked together with the plant to fix breakdowns along with advise on solutions
Journeyman Millwright Foreman
FM Sylvan
10.2019 - 08.2020
Coordinated with engineering to ensure seamless installation of new installation
Installation of power and free conveyor, screen guard, and drives.
Lay out, level and alignment of heavy machinery, conveyor, and drives