23+ years’ experience in Process Engineering and Production Management with a proven track record of manufacturing, relationship management and people development.
Overview
24
24
years of professional experience
1
1
Certification
Work History
Manufacturing Supervisor
Radiometer
05.2022 - 11.2023
Supervised Substrates, Sensor Testing, and Dispense
Participated in 3 Kaizen events
Lean cell layout of back end for 23% savings
SMED Kaizen event reducing set up times from 67 min to 15 min
10 Pc flow of Sensor Flowcell to Packaging
Determined root cause of accuracy failures using PSP, reduced failures by 95%, Increase in 3.5 overall yield.
Changed sanding method to reduce Via Fill visual failures by 80%, adding 1.5% overall yield
Increased yields of 2 main products by 11%
Created and used scorecards to see winning or losing in 3 seconds
Created material tracker to establish material needs for setting up Kanban
Worked with team in establishing quality 1st policy
Reduced WIP from 84 lots of material to 35 lots(59% reduction), and lead time by 30%, while maintaining downstream Supermarket levels
Established cross training program using Training Matrix to fill gaps
Ran morning meetings going over (SQDIP) Safety, Quality, Delivery, Productivity, and Compliance while promoting escalation of problems for each KPI
Worked closely with support teams (Engineering, Maintenance, Materials, and Quality)
Used Standard work to touch on critical to quality and delivery daily
Implemented VOP to track critical operations affecting quality
Worked with team to reduce GDP errors by 45%.
Manufacturing Supervisor
CAES (Cobham Advanced Electronic Solutions)
06.2019 - 05.2022
Supervised MRSI Pick and Place/MIC Assembly Lines
Team identified root causes to low productivity through Kaizen Event
Star teams formed to implement new system to boost output by 50% on one line and 25% on each of 4 other lines while reducing HC from 26 to 22
Provided reports and updates in driving continuous improvement through PDCA
Implemented 6S, TPM, Supervisor Standard Work and Pitch Charts and Training Matrix
Interface with Planners, Materials, Engineering, and CI team on material shortages BOM, traveler and drawing issues and Cell Optimization
Lead team to meet daily and weekly rates through pitch counts and visual observation of WIP levels during Gemba Walks
Collaborated with other Line leads over resource allocation to attack bottlenecks
Identify and track defects and report to engineering to identify solutions
Communicated daily in team meetings safety, output goals and results, defects, and component shortages
Communicate performance feedback.
Manufacturing Manager
Natel Engineering Co, Inc.
08.2007 - 12.2018
Oversaw all facets of manufacturing, including management up to 50 personnel, process compliance monitoring, quality assurance, scheduling, safety, and customer service interface
Reduced costs through lean initiatives and setup reductions, Kaizen events facilitation, A3 and other technical issue resolution
Managed monthly ship schedules, capacity planning
Thick Film Manufacturing Engineer
Natel Engineering Co, Inc.
01.2000 - 12.2018
Oversaw LTCC/Thick Film Punch, Printing, Inspection, Lamination, Firing, Solder reflow and Brazing processes
Promote Build Quality In
Coordinated team meetings and engineering tasks as Project Manager
Executed maintenance of all training records
Mentored and trained new and existing personnel through hands-on and classroom instructions
Communicated and presented high level information to design engineers, regarding designs and process issues, troubleshooting, and development processes
Collaborated with customers on design- and material-related issues
Review travelers and documentation to ensure proper build sequence and materials relative to customer requirements during ERB process
Developed controls in photolithography/Etch process to reduce rework and scrap by 90%
Developed photo dielectric process for 'air bridge' in Lange coupler manufacturing resulting in millions of dollars of future business
Performed and reviewed resistor, capacitor, wire bond, TCR, TCC, die shear, voltage breakdown, viscosity, and thickness data for acceptance and process variation per mil std 883 or customer requirements
Wrote and revised SOP's and Work Instructions with safety in mind
Used SMED to reduce print set up time by 50%
Collected data for Pareto amalysis to drive continuous improvement though use of various lean tools, such as A3, PSP, Poke Yoke, and Kaizen events
Senior Software Engineer II (Test Lead & Scrum Master) at Radiometer (Danaher Corporation)Senior Software Engineer II (Test Lead & Scrum Master) at Radiometer (Danaher Corporation)
Occupational Therapy Assistant at Encompass Health and Rehabilitation HospitalOccupational Therapy Assistant at Encompass Health and Rehabilitation Hospital