Summary
Overview
Work history
Education
Skills
Websites
Certification
Languages
References
Timeline
Generic
Skhawat Ali

Skhawat Ali

Lahore,Pakistan

Summary

Diligent HVAC Engineer experienced in design, installation and commissioning across electrical, mechanical and plumbing assets. Adaptable and highly-motivated to achieve project tasks within quality, cost and timescale targets.

Overview

16
16
years of professional experience
2
2
years of post-secondary education
1
1
Certification

Work history

Operations manager

Al-Awan Electric Works & Construction Co.
Lahore, Pakistan
12.2024 - Current
  • Responsible for overseeing all aspects of a heating, ventilation, and air conditioning (HVAC) project from start to finish, including planning, budgeting, scheduling, smooth execution of the project ensuring quality control, timely completion within budget and in compliance to project specifications, while maintaining client satisfaction.
  • Coordinated cross-functional teams, achieved project milestones on schedule with efficiently task delegation.
  • Established and optimised methods for construction, installation and commissioning.
  • Led teams to achieve business objectives on time and within budget constraints.
  • Identified bottlenecks, implemented solutions, increased productivity during project execution.
  • Encouraged innovative thinking in the team, fostered an environment of growth and development.
  • Led and managed administrative staff to maintain smooth daily operations.

QA/QC Engineer HVAC

NESPAK
Lahore, Pakistan
01.2009 - 11.2024

Projects:

1-Professional manpower supply contract for SEC-NEOM, Suadi Electricity Company Western Region.

M.H Aitah - NESPAK is rendering engineering consultancy services to Saudi Electric Company (SEC) on different projects with a team of Electrical, Mechanical, Civil, Safety & Planning Engineers.

2-Construction supervision of HVAC/FF works for Nurses Dormitories (Male & Female) buildings & Patient Apartment Buildings (9 Floors each) at Pakistan Kidney and Liver Institute (PKLI)-Package-C, Lahore

(Fire-Fighting: All the buildings shall be equipped with fire sprinklers & fire hose cabinets reels.

HVAC: The Nurses Dormitories served with VRF system whereas Patient Apartment building with Chillers (350TR x 3) based centralized HVAC system comprising of 10 No. AHUs & FCUs and duct distribution system. (PKR 1.565 billion for MEP Scope only)

3-Lahore Orange Line Metro Train Project, Lahore (USD 1478.18 million)

4-HVAC System components replacement at Faisalabad Institute of Cardiology

5-HVAC System Up-gradation / Replacement at State Bank of Pakistan, Faisalabad (PKR 300 million)

6-HVAC System installation, testing & commissioning of ICT building at University of agriculture, Faisalabad

7- HVAC System installation, testing & commissioning at Cricket House Building (PCB) Lahore, Pakistan

8- 1230 MW Combined Cycle Power Plant Project, at Haveli Bahadur Shah Jhang (USD 813.832 million)

9- 969MW Neelum Jhelum Hydro Power Project (Joint Venture of 5 Consultants) (PKR 510 billion)

10- Infrastructure Development Project under Water & Sanitation Agency (WASA), Multan (PKR 3310 million)

Main Duties and Responsibilities:

  • Top and Detailed Supervision of HVAC/FF works at Project Sites.
  • Technical Scrutiny of the equipment at Site and at manufacturer premises.
  • Carried out Site Quality Inspections for executed works (HVAC/FF, Mechanical, Electrical & associated Civil works) in compliance to project specifications, approved drawings, ITPs and method statements.
  • Carried out installation, testing & commissioning of mechanical systems & equipment.
  • Review of shop drawings at execution stage and as-built drawings after completion submitted by the contractors.
  • Review and approval of technical submittal submitted by the contractor.
  • Coordination of services and equipment with other disciplines at design & project execution stage.
  • Development of Electrical Control & Distribution Diagrams.
  • Estimation & verification of Contractor's Material/equipment claims for Non-BOQ Items in order to proceed for variation orders.
  • Taking measurements at site for verification of contractor's IPCs.
  • Supervised installation, testing & commissioning of mechanical construction including; cooling water system, cranes, cooling towers, HVAC and fire-fighting & fire extinguishing system, and Pre-engineered steel structures at 1230 MW combined cycle power plant Project and, 969MW Neelum Jhelum Hydroelectric Power Project.
  • Ensures at site, health and safety guidelines are being met as per project's requirements.
  • Prepares daily, weekly and monthly progress reports of the project.
  • Generates punch lists after completion and re-scheduling of project lagging activities to ensure its timely completion.

Education

B.Tech (Hons) Mechanical -

Institute of Southern Punjab
Multan/Pakistan
01.2012 - /2016

B.Tech Mechanical -

Baha ud Din Zakarya University
Multan
08.2011 - 07.2013

Diploma - Mechanical

Punjab Board of Technical Education
01.2005 - /2008

Skills

  • Engineering Drawings & P&IDs
  • Cost Estimation
  • Construction Supervision
  • Electrical
  • Mechanical
  • Civil
  • Testing & Commissioning of Mechanical Systems/Equipment
  • HVAC System Design
  • Punjabi
  • English
  • Urdu
  • AutoCad
  • Revit
  • Microsoft Office
  • HAP
  • Primavera 6
  • DuctSizer

Certification

  • 01/01/2023, In-house training in Revit (MEP)
  • 01/01/2021, Registered Graduate Engineering Technologist with National Technology Council of Pakistan (NTC), Eng.Tech/Mechanical/00658
  • 01/01/2008, Diploma Certificate in AutoCad

Languages

English
Fluent
Urdu
Native
Punjabi
Native

References

References available upon request.

Timeline

Operations manager

Al-Awan Electric Works & Construction Co.
12.2024 - Current

B.Tech (Hons) Mechanical -

Institute of Southern Punjab
01.2012 - /2016

B.Tech Mechanical -

Baha ud Din Zakarya University
08.2011 - 07.2013

QA/QC Engineer HVAC

NESPAK
01.2009 - 11.2024

Diploma - Mechanical

Punjab Board of Technical Education
01.2005 - /2008
Skhawat Ali