Process Engineer
Quest Global Engineering Servies Private Ltd
05.2015 - 04.2020
- Provided technical assistance to production team when issues arose.
- Reviewed processes, identifying areas requiring improvement.
- Conducted root cause analysis to identify, prioritize and eliminate process losses.
- Participated in project reviews to enable ongoing status tracking and reporting.
- Prepared scope of work documentation for use in project planning
- Developed documentation, diagrams, and specifications to meet project requirements and regulatory standards.
- Met weekly with team members to discuss project implementations and alleviate any issues.
- Managed third-party contractors, inspecting completed work and ongoing efforts to confirm quality and adherence to prescribed guidelines.
- Analyzed critical line data to make recommendations for improvement.
- Interfaced with area teams to verify application of technical details.
- Collaborated with technologists to address operating issues and support rapid recovery.
- Developed conceptual scope analyses of project objectives.
- Documented feasibility and implementation of third-party projects for review and future reference.
- Evaluated proposed project economics and identified alternative solutions and designs producing improved results.
- Visited client sites to troubleshoot issues and provide one-on-one training.
- Developed and implemented process improvements to reduce costs and increase efficiency in industrial production.
- Collaborated with cross-functional teams to develop and implement process changes.
- Monitored and optimized production processes to increase throughput and improve quality.
- Conducted evaluations of equipment and machinery to verify optimal performance and efficiency.
- Led root cause analyses to identify and address problems in industrial production.
- Analyzed data to identify trends in production and maintenance costs and developed strategies to reduce expenses.
- Created and implemented project plans for new or improved industrial processes.
- Evaluated proposed project investments by conducting cost-benefit analyses.
- Built inventory management systems for industrial facilities and reviewed existing systems to identify potential for optimization.