Summary
Overview
Work History
Education
Skills
Timeline
Generic

Spencer King

Cincinnati,OH

Summary

Results driven Engineering Manager, skilled in optimizing designs, and driving continuous improvement. Specializes in project management and leading cross-functional teams to innovate and solve complex engineering challenges. Strong communicator with a focus on stakeholder collaboration and hands-on leadership. Passionate about combining a love for adventure and the outdoors with my career.

Overview

8
8
years of professional experience

Work History

Process Engineering Manager

thyssenkrupp Bilstein
Hamilton, OH
03.2025 - Current
  • Standardized processes and developed tools for tracking project status, leading the team to 100% achievement of cycle time, scrap, operational efficiency.
  • Sourced 15 machines within budget, totaling $4.75 million, while exceeding performance metrics.
  • Organized Capex planning and strategy, resulting in cash flow $1.7 million below budget for the year.
  • Championed cross-functional teams that implemented design changes, reducing operational costs by 45% annually, and process changes improving tool life.
  • Created training materials focused on FMEA and failure prevention for employee development.
  • Established cost calculations with the Acquisitions team, including investment planning, process flow creation, capacity analysis, and risk mitigation strategies.
  • Managed goal setting and coaching, resulting in the team achieving the top 25% of company performance and three members completing the next level in their professional development.

Technical Project Manager - Process (Stellantis)

thyssenkrupp Bilstein
OH, OH
07.2023 - 03.2025
  • Industrialized new technologies on schedule by leading a team of 25 engineers across the USA, Mexico, and Germany, resulting in the installation of 2 new manufacturing lines.
  • Managed a Capex budget of $21 million, achieving all KPIs, with 5% savings on new equipment, equipment upgrades, and building infrastructure.
  • Conducted layout and ergonomic analysis of a production unit, optimizing walking distances and operator workload to enhance efficiency, and reduce fatigue.
  • Sourced suppliers, negotiated contracts, and escalated issues to ensure the plant received the necessary support for operational success.
  • Standardized global lessons learned from projects and presented findings at cross-functional conference in Germany.
  • Executed System and Process FMEAs enabling the industrialization of advanced manufacturing methods.

Scrum Master

tk Talents Program
OH, OH
07.2022 - 10.2023
  • Led Scrum/AGILE team on global project to reduce backlog and implement scheduling system across Technical Centers.
  • Introduced AGILE leadership techniques, adapting Sprints, Huddles, and Review/Retrospective for team effectiveness.
  • Achieved cost calculation and ordering process for suitable product portfolios through collaborative efforts.

Technical Project Manager - Product (Ford, Toyota)

thyssenkrupp Bilstein
OH, OH
07.2021 - 06.2023
  • Industrialized new suspension technology for the Ford Bronco from concept to production, establishing design standards for future projects.
  • Implemented cost savings using a Gemba approach, exceeding targets and reducing damper cost by $30.
  • Coordinated with Marketing and Sales on the launch of the ESCV technology by attending enthusiast events, creating technical marketing material, and acting as a brand ambassador.
  • Led six sigma DMAIC teams, achieving 10% reduction in scrap. Negotiated solutions with Ford management, resulting in $1.8 million in lifetime savings through a new design.
  • Coordinated R&D task force, delivering four design concepts on schedule. Optimized alternative solutions during customer testing, focusing on FMEA and process feasibility.
  • Developed standard D-FMEA for new technology to ensure feasibility and risk mitigation.
  • Managed validation plans and test lab resources, surpassing all customer design requirements.

Product Engineer (Toyota, Tesla)

Thyssenkrupp Bilstein
OH, OH
05.2018 - 06.2021
  • Oversaw the acquisition of my '21 Toyota Tundra, reducing BOM costs by 10% and validation testing duration by 40%.
  • Regional expert in springs, injected molded components, and stamped parts responsible for enhancing product quality and standardizing future designs.
  • Executed hydraulic layout and damper designs to fulfill customer expectations.

Education

BS - Mechanical Engineering

University of Cincinnati
Cincinnati, OH
05-2018

Skills

  • Capex planning
  • Six Sigma Green Belt
  • Process standardization
  • Stakeholder communication
  • Automation technology
  • Supplier Development
  • Cost Reduction Strategies
  • Lean Methodology
  • FMEA development
  • Project management
  • Suspension system design
  • 3D CAD & PLM
  • GD&T
  • Design validation
  • Statistical analysis
  • DFM & DFA

Timeline

Process Engineering Manager

thyssenkrupp Bilstein
03.2025 - Current

Technical Project Manager - Process (Stellantis)

thyssenkrupp Bilstein
07.2023 - 03.2025

Scrum Master

tk Talents Program
07.2022 - 10.2023

Technical Project Manager - Product (Ford, Toyota)

thyssenkrupp Bilstein
07.2021 - 06.2023

Product Engineer (Toyota, Tesla)

Thyssenkrupp Bilstein
05.2018 - 06.2021

BS - Mechanical Engineering

University of Cincinnati
Spencer King