Qualified Mechanical Engineer with extensive knowledge in Project Management, Site Management and Mechanical Engineering, Designing, Installation, Testing & Commissioning. Committed to providing accurate work with eye for detail. Consistently commended for meeting stringent project deadlines under budget.
Project Exposure 01: North Field East Onshore Project EPC-1
Client: Qatar Gas and Qatar Energy
Consultant: Chiyoda-Technip Joint Venture (CTJV)
Project Value: USD 314,926,000.00
North Field East (NFE) project is an expansion of the North Field, the world’s biggest single non-associated natural gas field, to reach 110 Mtpa cumulated LNG Production for Qatar.
➢ Engineering, Procurement, Construction (EPC) and Commissioning work for U&O buildings located in the W2/W3 and W1A Plot areas (PSM-012A, PSM-012B, PSM-012D & PSM-012F) and its amendments.
➢ Project execution is being carried out the way/method of Integrated Project Delivery ( with 1 team 1 step further 0 incidents and defects).
Project Exposure 02: Katara Twin Tower
Location: Lusail Marina, Doha – Qatar
Project Value : 3.5 Billion Qatari Riyals
Iconic 36 Storey Twin Towers comprising 6* Hotel, 6* Branded Apartments, Five Star Hotel, Floating Island.
Reporting to : MEP Director & Project Director
Projects Exposure 01: Mandarin Hotels & Apartments Musheireb, Doha – Qatar
MEP Project Value : 250 Million Qatari Riyals
Mandarin Hotel & Apartments is a 5 Star Hotel with 300 Rooms, Restaurants, Kitchen and Basement Car Park.
Projects Exposure 02: South East Car Park
Location: Al - Rayyan, Doha – Qatar
MEP Project Value : 200 Million Qatari Riyals
Qatar Foundation Education City's South East Car Park is a high quality 3,159-car park space. It provides a link to the People Mover Station (PMS) for onward travel to final destinations in Education City and to Qatar Academy.
• Supervision of site work, work force handling and Job assignment
• Prepared Detailed Shop drawings of HVAC, Fire Fighting and Plumbing Systems.
• Prepared Technical Submittals and Material Submittals as per the Project Specifications and requirements.
• Prepared Material Take Offs for HVAC, Chilled Water, Fire Fighting, Plumbing, Drainage and send to procurement department to float enquiries.
• Prepared Duct Matrix and Duct Thickness Schedule (For GI, SS & Black Steel) Ducts as per the SMACNA requirements.
• Preparation of As Built drawings of HVAC, Fire Fighting and Plumbing Systems.
• Ensured all the documents and drawings are issued on time and site corrections are captured in as built as well.
• Successfully interpret construction drawings and studied the contract documents and applicable standards or specifications prior to execution of any jobs.
• Effectively estimated, prepared, and assigned the resources such as labor, materials, consumables, equipment, tools, etc., required for all Mechanical and related works prior to execution at site.
• Communicated with clients and their representatives including attending regular meetings to keep them informed of progress & Conducting site meetings concerning progress of the project.
• Ensured all the requirements are complied as per the Project Spec. and IFC Drawings.
• Ensured proper coordination with all other disciplines and co-ordination drawings are prepared before execution .
• Prepared the Monthly Invoices and submit to the QS of Client for Monthly Works.
HVAC/MEP design