Summary
Overview
Work History
Education
Skills
Certification
References
Personal Information
Accomplishments
Timeline
Generic

Srikar Venneti

Little Rock,AR

Summary

Experienced professional with extensive knowledge in power systems, renewable energy, and distribution planning seeking a challenging position in a dynamic organization. Committed to promoting sustainable practices and driving operational efficiency while contributing to innovative projects. Strong technical skills and leadership abilities.

Overview

9
9
years of professional experience
1
1
Certification

Work History

ENGINEER – III (Utility)

Entergy LLC
Little Rock, USA
01.2019 - Current
  • Executed over 75 DER Interconnection studies, including Initial Reviews, Feasibility Studies, and System Impact Studies for 200+ MW of predominantly solar projects.
  • Developed Power System Modeling tools to enhance distribution planning processes, improving efficiency, and customer satisfaction.
  • Successfully integrated LoadSEER system for enhanced load projections
  • Oversaw regulatory compliance for solar projects
  • Identified system upgrades to mitigate risks
  • Worked with diverse teams in several states to enhance energy distribution
  • Ensure the DER projects under construction are in compliance with Entergy's standards.

Research Assistant

Lamar Renewable Energy Microgrid Laboratory, Lamar University
Beaumont, USA
08.2016 - 12.2018
  • Performed generation interconnection analyses for microgrid backup power with Hybrid Fuel Cell Systems
  • Published findings from extensive research on PEM fuel cell systems in a peer-reviewed journal
  • Created Fuel Cell Model with COMSOL Multiphysics for thermal and electromagnetic analysis
  • Efficiently facilitated onboarding of over 200 graduates along with 50 exchange students

Systems Engineer

Infosys Ltd.
Chennai, India
09.2015 - 07.2016
  • Created a Hotel and Flight Reservation application using Python and MySQL
  • Domain: Financial Services – Application Development and Management (ADM) (Corporate and Institutional Banking) Client: Royal Bank of Scotland (RBS)
  • Served on the team that developed and managed Client Due-Diligence (CDD), Client Lifecycle Management (CLM), and Know Your Customer (KYC) Applications
  • Client Interaction and Elicitation
  • Creation of design prototypes using SQL for production end run time errors and bugs

Education

Master of Science (MS) - Electrical Engineering

Lamar University
Beaumont, TX
12.2018

Bachelor of Technology (B.Tech.) - Electrical and Electronics Engineering

Karunya University
Coimbatore, India
12.2015

Skills

  • Project Planning
  • System Troubleshooting
  • Proposal presentation
  • Feasibility analysis
  • Energy efficiency
  • Simulation Modeling
  • Environmental Compliance
  • Project Estimation

Certification

Six Sigma Green Belt Certification, Institute of Industrial and Systems Engineers (IISE)

References

Available upon request.

Personal Information

Authorized To Work: H1B

Accomplishments

  • Promoted 3 times since date of joining
  • Rated exceptional by manager and peers

Timeline

ENGINEER – III (Utility)

Entergy LLC
01.2019 - Current

Research Assistant

Lamar Renewable Energy Microgrid Laboratory, Lamar University
08.2016 - 12.2018

Systems Engineer

Infosys Ltd.
09.2015 - 07.2016

Six Sigma Green Belt Certification, Institute of Industrial and Systems Engineers (IISE)

Master of Science (MS) - Electrical Engineering

Lamar University

Bachelor of Technology (B.Tech.) - Electrical and Electronics Engineering

Karunya University
Srikar Venneti