Industrial Engineering professional with a Master’s degree from Arizona State University and Lean Six Sigma Black Belt certification. Experienced in applying DMAIC methodology, statistical analysis, and process improvement tools to optimize operational performance. Skilled in time studies, value stream mapping, process capability analysis (Cp, Cpk), and measurement system analysis using JMP and Microsoft Visio. Proven ability to analyze complex processes, identify root causes, and develop data-driven solutions that improve efficiency, reduce lead times, and increase operational capacity.
Overview
2
2
years of professional experience
1
1
Certification
Work History
Irrigation Design
Manley Irrigation
Houston, TX
06.2025 - Current
Assisted in the design of irrigation systems using Pro Contractor Studio (RainCAD)
Performed hydraulic calculations, pipe sizing, and layout design to ensure adequate pressure and flow
Selected applicable system components including sprinkler heads, rain sensors, and control equipment
Created densograms to verify coverage uniformity and system effectiveness
Applied engineering principles to balance system performance, reliability, and cost
Process Improvement Capstone Projects (DMAIC)
Bay Builders Of Bonita Springs
Bonita Springs, FL
01.2024 - 05.2024
Led two DMAIC-based process improvement projects focused on increasing process value efficiency (PVE) and reducing process lead time.
Conducted time studies and value stream mapping using Microsoft Visio to analyze workflow, cycle times, and non-value-added activities.
Utilized JMP statistical software to perform data analysis including regression analysis, correlation analysis, and process capability studies.
Completed Measurement System Analysis (Gage R&R) to evaluate measurement system variation, confirming acceptable measurement reliability with 11.44% GR&R.
Performed process capability analysis (Cp = 2.44, Cpk = 1.45) to determine whether the process met performance requirements.
Applied Lean Six Sigma tools including Ishikawa diagrams, Failure Mode and Effects Analysis (FMEA), and solution selection matrices to identify and prioritize root causes of process delays.
Developed improvement recommendations that increased process value efficiency from 34.13% to 41.59%.
Achieved a 27.28% reduction in process lead time (104.93 hours → ~76 hours), exceeding the project target of a 25% reduction.
Improvement recommendations indicated the potential for the organization to increase operational capacity by up to three additional projects per week.
Education
Master of Science - Industrial Engineering
Arizona State University
Tempe, AZ
12-2024
Bachelor of Science - Engineering Management
Arizona State University
Tempe, AZ
05-2023
Skills
Irrigation design expertise
Design visualization
JMP Analysis
Reliasoft
Process Mapping & Value Stream Mapping
Lean Six Sigma Methodology
SQL Exposure
Pro Contractor Studio (RainCAD)
Certification
Lean Six Sigma Black Belt (LSSBB)
Applied DMAIC methodology to real-world process improvement projects
Experience with value stream mapping, root cause analysis, and performance metrics