Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

Stephon Mccarther

New Castle,DE

Summary

Energetic hands on guy who's looking for more than a job but a career/trade to pour into. I get a deep satisfaction from having positive results of projects I've completed successfully. I take a lot of pride in my work. I look forward to learning new things and gaining experience! I am a team player looking for a team I can grow with and help grow as I bring in my strengths and experience. In any area where I may lack experience I will compensate with my time and dedication to thoroughly learn.

Overview

8
8
years of professional experience

Work History

Foreman/Supervisor

Triune Solutions
Baltimore, Maryland
10.2024 - Current

I had to pleasure of directing the build of a 4,000 sq ft house In the Maryland area. Ran into some unforeseeable issues but through experience and perseverance my team was able to overcome all arising issues. From the concrete and up, I overseen and directed the material, man hours and the overall execution of this project.

  • Organized meetings with clients to discuss project specifications and expectations.
  • Scheduled staff shifts based on project needs and availability.
  • Developed and implemented strategies to improve team productivity.
  • Maintained daily logs of labor and equipment used on-site.
  • Managed inventory levels of supplies necessary for job completion.
  • Supervised activities of personnel assigned to various tasks during construction jobs.
  • Created detailed reports on job progress and submitted them to management on time.
  • Identified areas of improvement for increased efficiency and productivity.
  • Monitored job progress and ensured completion within budget constraints.
  • Assessed work area conditions for potential hazards or risks.
  • Inspected tools, materials, and equipment to ensure quality standards were met.
  • Established expectations and motivated crews to consistently meet or beat goals.
  • Created work crew schedules and delegated assignments.
  • Delegated duties to employees based on skillset.
  • Prepared and planned worksites to help jobs run smoothly.
  • Planned ahead for future needs by assessing available materials and ordering additional supplies as needed.
  • Assisted in the development of blueprints and schematics for carpentry projects.
  • Inspected job sites prior to beginning work to identify any potential safety issues.
  • Planned work based on blueprints and individual project specifications.
  • Studied blueprints, sketches or building plans to prepare project layout and determine dimensions and materials required.
  • Positioned and installed floor joists, trusses and rafters.
  • Maintained clean and organized workplace to optimize performance, efficiency and safety

Carpenter/Demolition

CRP construction
Berlin, NJ
12.2016 - Current

Worked as a commercial finish carpenter and ran a crew of finish carpenters who was responsible for but not limited to: 

*Using glue and power grab and the appropriate adhesive to install FRP, Acrovin, Acrolite

*checkout matts and vestibule matts Installation 

* Install header and frame for door then install door frames and doors

*following blue prints and directions to install bathroom Vanities and Bathroom partitions

*From start to finish with the process of Drywall, with spackling and sanding and paint.

* With understanding of the angles successfully installed trim and molding, azek and cove base.

*Was able to lay out and install  hardwood laminate flooring while accounting for usages and transitions.

*Ran a night crew who was in charge of cutting the concrete trenches for the plumbers. We were using the Core cut cc3500 Machines

*Ran the commercial Demos. Is able to read blueprints, direct guys, removed; stucco, Stone, tile, drywall, studs (metal, wood), cabinets, carpet, concrete, curbs, asphalt, 

  • Operated power saws, planers, jointers, routers and pneumatic equipment.
  • Ordered materials and made material stock recommendations.
  • Selected lumber based on the particular species, characteristics, size, applications and applicable adhesives.
  • Installed cabinets, base cabinets and crown molding.
  • Safely used band, circular, jig, reciprocating, chop and compound miter saws.
  • Framed on a basic 16" layout using wood and metals studs aslo framed out old existing door and re sheathed it with exterior plywood covered with Tyvek 

Education

Maui Community School for Adults
Kahului, HI
2011

High School Diploma -

Northern Arizona University
Flagstaff, AZ
2010

Skills

  • Valid driver's license
  • Blueprint interpretation
  • Timely project completion
  • Strong work ethic
  • Flexible work schedule
  • Exceptional problem solver
  • Project oversight
  • Friendly and hardworking
  • Blueprint reading
  • Team player
  • Deadline driven

Accomplishments

Trained to effectively operate;  Boom lift, Scissor life, cherry picker, fork lift, Skid steer.

Timeline

Foreman/Supervisor

Triune Solutions
10.2024 - Current

Carpenter/Demolition

CRP construction
12.2016 - Current

Maui Community School for Adults

High School Diploma -

Northern Arizona University
Stephon Mccarther