Overview
Work History
Skills
Timeline
Generic

steven colclasure

Santa Maria,CA

Overview

2015
2015
years of professional experience

Work History

Utility A

Phillips 66 Pipeline
07.2005 - 04.2014
  • Operated and monitored pipeline systems to ensure safety and efficiency.
  • Conducted routine inspections and troubleshooting of equipment and systems.
  • Collaborated with team members to maintain compliance with safety regulations.
  • Assisted in the implementation of process improvements for operational efficiency.
  • Documented operational data and prepared reports for management review.
  • Trained new operators on safety protocols and operational procedures.
  • Coordinated emergency response activities during pipeline incidents or leaks.
  • Maintained accurate inventory records of supplies and materials used in operations.
  • Participated in ongoing professional development opportunities to stay current with industry trends and best practices.

Company Field Representative

Phillips 66 Pipeline
2010 - 2015
  • Conducted field inspections to ensure compliance with safety regulations and operational standards.
  • Assisted in data collection and analysis for pipeline integrity assessments.
  • Collaborated with engineering teams to support project execution and problem-solving initiatives.
  • Documented field activities, maintaining accurate records of inspections and maintenance tasks.

Skills

DOT inspection , ROW monitoring , inspection and retention One call - line locating Emergency response First responder State Fire Marshall and NFPA regulation requirements and form retention Santa Barbara County , APCD local fire Permit conditions and state agency requirements and relations Local office and field inventories tracking and purchasing Truck and station lifting equipment inspections Contractor scheduling / invoicing Document contractor mentoring safety and company and state /Federal/ enviromental requirements are implimented Documented pipeline depth surveys and projects into company maps excavation, pipeline cutouts , pressure tests and ILI runs Monitored Pipeline Temperature, pressures and flows from crude oil producers through station tankage or tightline then delivery into SMR and Downstream receiving product from SMR through pipeline to receving tankage at Atascadero facility then finally into Junction station

Timeline

Utility A

Phillips 66 Pipeline
07.2005 - 04.2014

Company Field Representative

Phillips 66 Pipeline
2010 - 2015
steven colclasure