Summary
Overview
Work History
Education
Skills
Timeline
Generic

Steven Harris Jr

Pomona,CA

Summary

Accomplished Finish Carpenter with over 15 years of experience Started in Residential and ended up in Commercial Construction at Final Phase Construction, specializing in exceptional finish carpentry and blueprint reading. Proven ability to lead teams and Fixture setting and seismic anchoring as well as ensuring safety compliance while delivering high-quality results. Adept at cabinetry and customer service, consistently exceeding client expectations through effective communication and project management.

Overview

22
22
years of professional experience

Work History

Finish Carpenter/Journeyman

K&M Doors And Moldings, Inc
Rancho Cucamonga, CA
12.2014 - 02.2021
  • Installed Exterior Windows and Exterior Doors and Sliders,Milled shelves, doors, cabinets and counters to correct scale and dimensions according to blueprints and buildings plans
  • Cut and installed moldings, crown, box beams, wainscot and ceiling/wall designs
  • Utilized tools to effectively complete installation projects.
  • Followed strict adherence to safety protocols from job start to final clean up to prevent accidents and mishaps.
  • Collaborated with other carpenters, journeymen and supervisors to complete projects.

Lead Custodian

Lanterman Developmental Center
Pomona, CA
01.2009 - 10.2014
  • Refinished and cleaned floors to uphold hygiene standards.
  • Monitored employees to enforce proper use of personal protective equipment, supplies and equipment.
  • Led, oversaw and trained team to perform routine custodial duties and basic maintenance and repair.
  • Performed custodial duties to maintain area in clean and habitable condition.

Assistant Manager/Maintenance Worker

Crest Mobile Manor
Pomona, CA
03.2006 - 01.2009
  • Handled multiple projects and daily activities to meet deadlines and developed plans to accomplish departmental and maintenance goals.
  • Developed and deployed maintenance control plans to direct execution of planned preventive and predictive maintenance activities.
  • Implemented safety programs through effective collaboration with operations.
  • Most duties included: tree trimming, painting, graffiti removal, Irrigation, Plumbing (run new water and gas lines) replace gas, water and electrical meters, landscape, groundskeeper and heavy equipment.
  • Conducted office tasks including drafting write-ups for homesites.
  • Consistently maintained typing speed of 48 words per minute.

Grocery Stocker

Vons
Alta Loma, CA
09.2004 - 03.2006
  • Ensured items were ready for sales floor by tagging and stocking.
  • Operated manual and electric pallet jacks, safely relocating heavy merchandise on sales floor for timely stocking.
  • Facilitated the transfer of large items for customers.
  • Evaluated supplies and product inventory to check for quality and quantity issues and returned unacceptable materials to vendors.

Applicator

Access Exterminator Service, Inc.
Orange, CA
11.2003 - 09.2004
  • Calculated areas for treatment to accurately estimate quantity of chemicals needed.
  • Inspected areas prior to application to confirm removal of all debris.
  • Maintained knowledge of equipment necessary to complete jobs, acquiring new skills and techniques.
  • Implemented protective measures to uphold health standards.
  • Maintained strong education on latest methods and techniques for applications through available training and courses.
  • Inspected, maintained and repaired sprayers and equipment.
  • Sanded and removed blemishes, dents and other imperfections on painting surfaces.
  • Monitored quality control and trends to report to job site supervisor.

Project Manager/Estimator

Final Phase Construction
Rancho Cucamonga, CA
09.2021 - Current
  • Completed precise joining and high-quality finish work by properly anchoring and bracing structures.
  • Organized project work by reading blueprints and assessing job specifications to determine optimal plans.
  • Completed installations of building structures, trim, flooring and cabinetry.
  • Installed paneling on walls to deaden sound, complete decorations or absorb shock based on individual customer requirements.
  • Kept team members safe and job sites free of hazards by maintaining good organizational skills.
  • Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Monitored tool and equipment condition and arranged repairs.
  • Planned projects by identifying necessary equipment, tools and required assistance.
  • Carefully read blueprints, sketches and technical drawings to inform comprehensive understanding of project scope and specifications.
  • Specialized in foundations, framing and finish carpentry.
  • Built and hung custom doors and frames.
  • Fabricated custom furniture, shelving and cabinets and installed in specified locations.
  • Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
  • Developed proficiency in stain-grade trim work, hanging doors and drilling and setting door hardware.
  • Consistently maintained typing speed of 50 words per minute.
  • Interpreted technical blueprints accurately.
  • Planned, designed, and scheduled phases for large projects.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Developed comprehensive project plans with clear timelines, milestones, and budget requirements, ensuring timely delivery of high-quality results.
  • Identified plans and resources required to meet project goals and objectives.
  • Monitored progress against established goals, adjusting schedules and resources as needed to keep projects on track.
  • Led teams and managed construction tasks with 15+ years of hands-on experience.

Education

High School Diploma -

Claremont High School
Claremont, CA
06.1999

Skills

  • Multi-piece crown molding
  • Interior trim
  • Door hanging
  • Cabinetry
  • Layouts
  • Blueprint reading
  • Hand and power tools
  • Exceptional finish carpentry skills
  • Safety and compliance
  • Heavy Equipment Operation
  • Painting
  • Flexible & Adaptable
  • Customer service

Timeline

Project Manager/Estimator

Final Phase Construction
09.2021 - Current

Finish Carpenter/Journeyman

K&M Doors And Moldings, Inc
12.2014 - 02.2021

Lead Custodian

Lanterman Developmental Center
01.2009 - 10.2014

Assistant Manager/Maintenance Worker

Crest Mobile Manor
03.2006 - 01.2009

Grocery Stocker

Vons
09.2004 - 03.2006

Applicator

Access Exterminator Service, Inc.
11.2003 - 09.2004

High School Diploma -

Claremont High School
Steven Harris Jr