Overview
Work History
Timeline
Generic

Steven Jameson

Caldwell,WV

Overview

2026
2026
years of professional experience

Work History

Electrical Technician

Greenbrier Electric and Technology’s
Lewisburg, WV
06.2025 - Current
  • Implemented preventive maintenance protocols to reduce downtime due to system failure or malfunctioning components.
  • Tested existing electrical components to ensure proper functioning.
  • Utilized specialized tools such as voltmeters, ammeters, ohmmeters to diagnose problems within circuitry.
  • Developed test plans based on customer specifications and requirements.
  • Inspected all electrical components for damage or wear and tear.
  • Built panels containing relays, switches, circuit breakers, according to customer specifications.
  • Connected and repaired equipment based on mechanical drawings and electrical prints.
  • Provided electrical services and control wiring for diverse locations.
  • Frequently worked overtime, weekends and holidays.
  • Repaired electrical equipment using hand and power tools and testing and diagnostic equipment.
  • Established outstanding relationships with electricians and consumers.
  • Installed electrical wiring during remodeling projects.
  • Interpreted electrical and mechanical schematics, blueprints and diagrams.
  • Read and worked from electronic blueprint drawings.
  • Tested energized and de-energized circuits, following test procedures and assisted in specialized test procedures.
  • Tested electrical systems and continuity of circuits in electrical wiring, equipment, and fixtures
  • Set up and operated specialized or standard test equipment to diagnose, test or analyze performance of electronic components, assemblies or systems.
  • Performed diagnostics and testing to locate root causes and resolve issues for optimal performance.
  • Read and interpreted technical manuals, drawings and schematics to make accurate repair decisions.
  • Assembled electrical systems or prototypes using hand tools or measuring instruments.
  • Constructed and evaluated electrical components for consumer electronics applications.
  • Improved electrical installations by standardizing procedures for production and field .
  • Provided training to personnel on proper use of tools and techniques related to fiber optics.
  • Assisted with the development of new technologies related to fiber optics.
  • Organized and coordinated resources required for successful completion of jobs.
  • Prepared detailed reports on completed projects for management review.
  • Maintained documentation of all network changes and repairs.
  • Documented installation records in a timely manner.
  • Performed maintenance on fiber optic networks.
  • Provided technical support to customers regarding their fiber optic Programmed optical power meters to perform loss measurements.
  • .
  • Monitored progress reports and documented results from each job site visit.
  • Tracked inventory levels of tools, parts, and supplies used in job sites.
  • Calibrated test equipment to verify accuracy of readings.
  • Inspected and tested fiber optics equipment to ensure optimal performance.
  • Worked with other technicians as part of a team on large projects.
  • Utilized software applications to monitor and troubleshoot telecom devices from remote locations.
  • Created sensors and conducted thorough inspections to locate fiber optic system defects.
  • Established and modified networks and computers at businesses, schools, government buildings, medical .


  • Assisted in the development of safety procedures for working with hazardous materials.
  • Installed new electrical wiring and equipment in accordance with local codes

Carpenter

Long Construction
Union, , WV
06.1995 - 03.2000
  • Installed cabinets, fixtures and trim according to plans and blueprints.
  • Repaired or replaced damaged structures or components.
  • Assisted in the installation of metal framing systems for commercial construction projects.
  • Read blueprints, schematics and drawings to determine layout requirements.
  • Calculated material costs for projects based on labor estimates provided by clients.
  • Installed drywall sheets onto walls or ceilings using nails or screws.
  • Maintained a clean job site at all times by disposing of debris properly after each shift.
  • Measured, cut and shaped wood materials to specifications using hand tools, such as saws and chisels.
  • Constructed forms for concrete pours in accordance with building codes.
  • Laid out flooring patterns according to design templates or customer specifications.
  • Operated power tools safely when performing carpentry tasks such as drilling holes into lumber pieces.
  • Installed interior trim work such as baseboards and moldings around windows and doors.
  • Fabricated staircases, doors, window frames and other wooden components for buildings.
  • Studied blueprints, sketches or building plans to prepare project layout and determine dimensions and materials required.
  • Positioned and installed floor joists, trusses and rafters.
  • Cut timber, panels and other wooden materials according to measured dimensions.
  • Applied design-specific wood and composite trim according to architectural plans and neighborhood regulations.
  • Reviewed jobsite needs with foreman and coordinated construction.
  • Promoted team safety by keeping work areas free of hazards.
  • Conducted inspections, diagnosed problems, took measurements and made necessary adjustments to complete projects according to specifications.
  • Communicated with teammates and supervisors frequently to understand requirements and complete projects on time.
  • Worked independently on projects and tasks within carpentry team.
  • Covered subfloors with building paper and lay hardwood or parquet floors by nailing to subfloor or cementing to mastic base.
  • Maintained clean and organized workplace to optimize performance, efficiency and safety.
  • Took accurate measurements to calculate size and amount of materials needed for project completion.
  • Installed windows, flooring, or trim using hand or power tools.
  • Erected scaffolding to assemble above-ground structures.
  • Bore boltholes in wood, masonry or concrete using electric or pneumatic drill.
  • Studied blueprints or building plans to prepare layout and materials required.
  • Inspected tiles, wall coverings or woodwork for breakage or damage.

Equipment Operator

Dark Seam Coal Company
Rupert, WV
01.1992 - 06.1995
  • Completed 80Hour First Aid Training Certification Class through MSHA. Operated 988 Cat Frontend Loader. Worked at cleaning plants loading Trucks and feed cleaning plant raw coal.

Forman

Hall Construction
Concord , NC
08.1990 - 01.1992
  • Provided guidance, direction, and technical assistance to crew members.
  • Scheduled staff shifts based on project needs and availability.
  • Conducted regular performance reviews with crew members.
  • Prepared budgets for projects based on labor costs, materials needed.
  • Monitored compliance with local building codes and regulations.
  • Managed inventory levels of supplies necessary for job completion.
  • Organized meetings with clients to discuss project specifications and expectations.
  • Organized meetings with clients to discuss project specifications.
  • Communicated with suppliers and coordinated delivery of supplies to job sites.
  • Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
  • Prepared and planned worksites to help jobs run smoothly.

  • Monitored and tracked progress of installations to ensure adherence to timelines and budgets.
  • Conducted comprehensive research and data analysis to support strategic planning and informed decision-making.
  • Exceeded customer satisfaction by finding creative solutions to problems.
  • Utilized advanced technical skills and expertise to troubleshoot complex problems and implement solutions.
  • Recognized by management for providing exceptional customer service.
  • Conducted testing of software and systems to ensure quality and reliability.
  • Updated and maintained databases with current information.
  • Managed time effectively to ensure tasks were completed on schedule and deadlines were met.
  • Completed day-to-day duties accurately and efficiently.
  • Assisted with customer requests and answered questions to improve satisfaction.
  • Managed inventory and supplies to ensure materials were available when needed.
  • Identified needs of customers promptly and efficiently.
  • Provided support and guidance to colleagues to maintain a collaborative work environment.
  • Utilized various software and tools to streamline processes and optimize performance.
  • Conducted system analysis and testing to identify and resolve technical issues or inefficiencies.

Timeline

Electrical Technician

Greenbrier Electric and Technology’s
06.2025 - Current

Carpenter

Long Construction
06.1995 - 03.2000

Equipment Operator

Dark Seam Coal Company
01.1992 - 06.1995

Forman

Hall Construction
08.1990 - 01.1992

Steven Jameson