* CERTIFICATIONS
Hazmat
Ecatts
Twic
OSHA
Cad
Teams
Responsible for creating buildings in a three D cad program. Install all components in buildings for engineering to approve structurally and cosmetically before creating buildings . Completed 10 - 20 buildings every year per the size of building
Construction management Projects included:
* PENTAGON 5 MONTHS (2015)
Lead team of 15 divers that cleaned, inspected , and repaired all underwater cooling pipes ; responsible for crane, multiple dive stations, suction pumps, and decompression station .
* US.S. COAST GUARD CAPE MAY LIGHTHOUSE 1 MONTH (2015)
Led team of 13 responsible for building and installing lighthouse on break wall in hazardous conditions; responsible for ocean going crane barge , tug boat
* CALVERT CLIFFS NUCLEAR POWER PLANT 1 YEAR (2014-2015)
Managed 20 divers refurbished 14,000 sq. ft. of intake wall maintaining stability for nuclear core.
* U.S. NAVAL ACADEMY 1 YEAR (2014-2015)
Renovated and resurfaced over 200,000 sqft of seawall , managed multiple crews with multiple crane barges and heavy equipment, pumped more then 20,000 + yards of concrete .
* PORT OF BALTIMORE 10 YEARS (2005 - 2015 )
Managed the daily rehabilitation of port seawalls, methods including pile driving , Diving , earth work, concrete foundation. sheet pile work.
* WOODROW WILSON BRIDGE 3 YEARS ( 2001-2004)
Managed all undere water work for phases 1 and 2 of project .
assisted with all pile driving , coffer dam installation and removal , all dredging work , poured all foundation which were 30,000 + yards per foundation .
* CSX COAL PIER, 1 YEAR (2008-2009)
oversaw three crews each consisting of seven men to repair over 1,000 pylons under coal loading platform using epoxy jackets