
Managed daily site operations and supervised a five-member team, including machine operators and laborers, to achieve installation goals. Coordinate dump trucks to transport excavated materials, also making sure excavation is backfilled properly. From traffic control to paving at the end of a day it is also my duty to ensure the safety of everyone on site.
My job as foreman was to ensure proper installation of water , sewer , and storm drains. I pride myself in ensuring the safety on every job site. Repaired many sewer mains and laterals for the MDC.
I am a highly skilled construction worker with the experience and awareness to complete and job or task sent my way I have 20 yrs experience installing and repairing pipe I have the knowledge to read prints and run a job start to finish I also have my P6 certification