Steven Ratliff

Asheboro,North Carolina

Summary

Dedicated lineman with extensive experience at Pike Electric, excelling in storm damage repair and power line installation. Proven ability to enhance system reliability through effective troubleshooting and strong teamwork. Committed to safety and efficiency, consistently reducing outage durations while maintaining a stellar safety record.

Overview

31
31
years of professional experience

Work History

Lineman

MasTec
Asheboro, NC
03.2025 - Current

Lineman

Pike Electric
Asheboro, NC
02.1994 - 01.2011
  • Performed maintenance and reconducting work in varied weather conditions.
  • Responded to emergencies and outages that required additional labor and assistance for repairs.
  • Worked on both dead and energized lines.
  • Removed old poles and hardware and replaced with new equipment.
  • Installed, spliced and maintained overhead and underground power lines for residential and commercial customers.
  • Trained new team members in proper procedures, fostering a safe and efficient work environment.
  • Assisted in emergency storm restoration efforts, restoring power to affected communities as quickly as possible.
  • Followed all safety protocols and regulations while working at height and with live electricity.
  • Participated in ongoing training programs to stay current on industry trends and best practices.
  • Improved workplace safety by conducting regular equipment inspections and maintenance.
  • Reduced outage durations with quick response times and effective troubleshooting skills.
  • Inspected power lines for any damage or irregularities and replaced components.
  • Installed and maintained overhead and underground electrical power lines and auxiliary equipment.
  • Maintained a strong safety record by diligently adhering to OSHA regulations and company policies, ensuring the well-being of both team members and the public.
  • Assisted with constructing new power lines by using appropriate tools and equipment.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Enforced adherence to industry best practices, safety protocols and proper installation techniques.
  • Utilized advanced diagnostic tools to identify issues in power lines, ensuring timely repairs and minimal downtime.
  • Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.
  • Contributed to positive teamwork dynamics by effectively communicating with colleagues and supervisors throughout project lifecycles.
  • Effectively managed multiple projects simultaneously, prioritizing tasks based on urgency and impact on overall operations.
  • Performed powerline maintenance by cleaning and lubricating components and replacing worn parts.
  • Collaborated with cross-functional teams to complete large-scale projects on time and within budget.
  • Completed complex installations for major power distribution projects, ensuring adherence to industry standards.
  • Conducted thorough pre-construction assessments to identify potential challenges before beginning work on-site, preventing delays during project execution stages.
  • Recorded accurate measurements for installed new power lines and poles.
  • Maintained accurate records of completed tasks, contributing to streamlined operations.
  • Provided excellent customer service during service calls, addressing concerns promptly and professionally.
  • Adhered to strict safety protocols while working at heights or near energized equipment, minimizing accidents on the job site.
  • Coordinated with utility partners during joint infrastructure projects, facilitating smooth communication channels between teams resulting in successful outcomes.
  • Enhanced system reliability through efficient diagnosis and repair of electrical faults.
  • Supported the development of new processes for increased efficiency in line construction and maintenance activities.
  • Enhanced operational safety, providing comprehensive safety training and mentorship to new linemen.
  • Reduced downtime during outages, swiftly locating and repairing faults in power distribution network.
  • Facilitated smoother operations, efficiently coordinating with engineers and ground support teams on complex projects.
  • Improved team efficiency with rigorous adherence to safety protocols during high-risk operations.
  • Boosted network reliability, conducted thorough inspections, and maintenance of power lines and equipment.
  • Achieved significant reductions in equipment failure rates, implementing proactive maintenance schedules.
  • Expedited power restoration efforts after natural disasters, mobilizing and directing emergency response teams.
  • Optimized resource use, effectively managing materials and tools inventory for field operations.
  • Minimized environmental impact with careful planning and execution of line installations in sensitive areas.
  • Elevated customer satisfaction by restoring power quickly after storm-related disruptions.
  • Ensured continuous power supply by meticulously maintaining and repairing overhead and underground power lines.
  • Enhanced public safety by promptly responding to emergency outages and hazardous situations.
  • Strengthened infrastructure resilience, upgrading and retrofitting older lines and equipment to withstand adverse weather.
  • Enhanced service reliability, conducting detailed risk assessments and implementing mitigation strategies.
  • Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.
  • Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.

Education

High School Diploma -

Garden High
Oakwood, VA
06.1992

Skills

  • Bucket truck operation
  • Heavy lifting
  • Storm damage repair
  • Hand and power tools
  • Fall protection practices
  • Digger derrick use
  • Electrical power line installation
  • Hole digging
  • Grounding techniques
  • Safety procedures
  • Electrical safety procedures
  • Safety meetings
  • Repair work
  • Power line installation
  • Overhead line construction
  • Troubleshooting
  • Emergency repairs
  • Electrical distribution systems
  • Transformer maintenance
  • Written and verbal communication
  • Equipment selection
  • Crossarm installation
  • Electrical diagrams
  • Chain hoist operation
  • Electrical testing
  • Crew assistance
  • Blueprint analysis
  • Equipment maintenance
  • Lockout/Tagout
  • Fault detection techniques
  • Transformer removal
  • Wire splicing
  • Customer service
  • System troubleshooting
  • Shortening and lengthening lines
  • Conductor stringing
  • Schematics
  • Switchgear maintenance
  • Line extension planning
  • Electrical systems
  • Electrical power line maintenance
  • Voltage regulation
  • Company radio usage
  • Construction principles
  • Steel tower erecting
  • Troubleshooting equipment
  • Effective customer communication
  • Multitasking Abilities
  • Power restoration
  • Safety management
  • Teamwork
  • Teamwork and collaboration
  • Problem-solving
  • Time management
  • Attention to detail
  • Problem-solving abilities
  • Multitasking
  • Reliability
  • Excellent communication
  • Organizational skills
  • Team collaboration
  • Active listening
  • Effective communication
  • Adaptability and flexibility
  • Electrical safety
  • Decision-making
  • Relationship building
  • Team building
  • Task prioritization
  • Self motivation
  • Aerial lift operation
  • Interpersonal skills
  • Analytical thinking
  • Electrical systems installation
  • Goal setting
  • Professionalism
  • Blueprint reading
  • Interpersonal communication
  • Quality control
  • Time management abilities
  • Continuous improvement
  • Adaptability
  • Written communication
  • Vehicle operation
  • Rigging skills

Timeline

Lineman

MasTec
03.2025 - Current

Lineman

Pike Electric
02.1994 - 01.2011

High School Diploma -

Garden High
Steven Ratliff