
Routine decon for containment, set-up for cavity decon, setup bull pens.
Routine decon for containment, set-up for cavity decon, set-up bull pens.
Supervise decon technicians for all aspects of outage decontamination activities.
Routine decon for containment, set-up for cavity decon, set-up bull pens.
Routine decon for containment, set-up for cavity decon, set-up bull pens.
Routine decon for containment, set-up for cavity decon, set-up bull pens.
Routine decon for containment, refuel floor, aux building.
Routine decon for containment, refuel floor, aux building.
Routine decon for containment, refuel floor, aux building.
Routine decon for containment, refuel floor and aux building.
Confined Space Evaluator, perform initial and on-going atmospheric sampling for oxygen concentration, combustible gases and potential toxic vapors. Heat Stress Evaluator, evaluate workers to adverse environmental conditions.
Operate survey instruments, count rate meters, CAM's and HEPA equipment, perform radiation surveys, unconditional release surveys, airborne radioactivity surveys, posting de-posting, radiological job coverage to include high risk job coverage, job coverage for pulling reactor control rods, remote monitoring, area and equipment decon, support radioactive material movement, respond to radiological alarms, monitor and coach workers in the RCA.
Assist Sr. RP technicians with job coverage, routine surveys, daily source checks for radiation and contamination instruments, issue respirators, maintain control of step off pad.
Assist Sr. RP's with job coverage, routine Jr. RP duties.
Assigned to Drywell assist Sr. RP's with all aspects of job coverage for under vessel, surveying, collection and counting of air samples.
Assist Sr. RP's with job coverage, routine Jr. RP duties.
Routine Jr. RP duties.
Coverage for reactor building, HCU's, smear and clear tools from CA's.
Assist ALARA with lead shielding, routine decon, decon reactor temporary vessel cover, cavity decon.
Routine decon, containment, aux building, refuel floor.
Assist Sr. RP's with job coverage, routine surveys, response check instruments.
Decon support for pre-outage and outage.
Assist ALARA personnel with installing and removal of lead shielding, decon valves for boric acid, support at equipment hatch, decon upper lift rig, set up bull pens.
Assist with installation of water bladder shield on the fuel transfer tube, decon seal ring, stud bold plugs, install bull pens.
Decon support, containment, aux building, refuel floor.
Cavity decon, set up tri-nuke system and pump bay (SG) set-up and demo.
Refuel floor decon support for RP's and Areva, cavity decon, hot particle control, contamination control, general area decon of reactor building.
Radiological contamination zone installation and hot removal, precision tool disassembly and decontamination.
Operation of portable laundry for protective clothing, routine decon support for containment and aux building.