Summary
Overview
Work History
Skills
Timeline
Construction Worker

Sukhraj Dalchand

PG NY
NEWYORK,NY
20
years of professional experience

Hardworking professional well-versed in handling materials, operating machinery and supporting overall team and project needs. In-depth knowledge of compliance mandates governing site and worker safety. Focused on helping complete skilled work under deadlines.

Work History

Construction Worker

4 Years 9 Months
PG NY | NEWYORK, NY | 10.2021 - 07.2026
  • Supervised KNS Enterprises crews on commercial and residential construction sites.
  • Coordinated daily work plans with subcontractors and site supervisors.
  • Reviewed blueprints and verified layout before crew work began.
  • Managed PG NY job site safety checks and hazard controls.
  • Installed framing, drywall, and fixtures for PG NY builds.
  • Operated power tools and heavy equipment on PG NY projects.
  • Read blueprints and measured layouts for PG NY construction work.
  • Loaded, moved, and staged materials across PG NY sites.
  • Coordinated with PG NY supervisors and trades on daily tasks.
  • Performed demolition, cleanup, and debris removal at PG NY locations.
  • Trained new workers on PG NY safety rules and procedures.
  • Utilized power tools such as saws, drills and sanders on projects.
  • Maintained clean, safe working environment by removing debris from job site prior to shift completion.
  • Performed various carpentry tasks such as constructing walls, installing doors, windows and siding.
  • Mixed concrete, mortar and other materials to prepare building material.
  • Coordinated with other workers onsite to ensure efficient completion of tasks.
  • Repaired damaged structures with appropriate materials including wood and metal components.
  • Transported materials from one site location to another using trucks or trailers.
  • Assisted in the preparation of construction sites by clearing debris, leveling ground and erecting scaffolding.
  • Sustained safety protocols to maintain secure, proper handling of equipment and materials.
  • Completed carpentry work and installed crown molding and wood flooring to meet customer preferences.
  • Conducted regular maintenance checks on all tools used during construction process ensuring that they were properly functioning at all times.
  • Assisted electrical, plumbing and carpentry teams by completing basic and semi-skilled work.
  • Built temporary supports during construction processes such as shoring up beams or columns until they are set in place permanently.
  • Used laser measuring tools to calculate lengths, widths, and heights.
  • Operated a variety of tools to excavate, move and grade earth for foundations, trenches and roads.
  • Notified supervisors of faulty operations and defective materials to improve production.
  • Installed formwork for concrete structures according to specifications.
  • Followed blueprints or engineering plans to determine the best methods of assembling structures.
  • Maintained baseline safety knowledge to improve deficient areas and meet code.
  • Assembled structural components, replacing parts to meet regulatory code standards.
  • Lifted heavy objects into place with cranes or hoists.
  • Addressed and resolved on-site problems to keep teams on-task and avoid the development of larger concerns.
  • Monitored progress of construction activities making sure deadlines were met.
  • Ensured compliance with local codes regarding building regulations.
  • Logged inventory to track supply counts, organize equipment, and gather important materials.
  • Utilized two-way radios and hand signals to coordinate communication between equipment operators.
  • Maintained accurate records documenting project progress throughout duration of each job.
  • Acted as subject matter expert to provide industry insight and assist coworkers.
  • Performed lock-out-tag-out procedures on equipment prior to service work to promote workplace safety.
  • Erected steel framework for buildings using welding equipment.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Displayed high standards for quality workmanship and routinely double-checked work.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Worked productively as lead or helping team member to drive customer satisfaction.
  • Demonstrated best safety practices working at heights and lifting various objects.
  • Excavated ditches for drainage systems to ensure proper water flow. or trenches, backfilled excavations or compacted and leveled earth to grade specifications.
  • Measured, marked or recorded openings or distances to construction layout areas.
  • Inspected sites before and after construction projects.
  • Lubricated, cleaned or repaired machinery or equipment.
  • Controlled traffic passing near, in or around work zones.
  • Signaled equipment operators to facilitate alignment, movement or adjustment of machinery.
  • Positioned, aligned or sealed concrete wall sections or pipes.
  • Coordinated phases of construction projects from inception to completion.
  • Tended pumps, compressors or generators to provide power or heat or move materials.
  • Performed site activities required of green-certified construction practices.
  • Installed sewer, water or storm drain pipes using pipe-laying machinery or laser guidance equipment.

Construction Foreman

14 Years 10 Months
KNS Enterprises | NEWYORK | 07.2006 - 05.2021
  • Supervised KNS Enterprises crews on commercial and residential construction sites.
  • Supervised and coordinated the activities of workers engaged in all phases of construction projects.
  • Coordinated daily work plans with subcontractors and site supervisors.
  • Developed work plans, assigned tasks and monitored progress to ensure timely completion of projects within budget.
  • Managed daily work assignments by delegating tasks and monitoring progress.
  • Assigned projects and tasks to employees based on competencies and specialties.
  • Directed workers in proper techniques for installation or repair of structures according to blueprints or specifications.
  • Reviewed blueprints and verified layout before crew work began.
  • Read and followed blueprints when planning and implementing construction phases.
  • Scheduled materials, tools, and equipment for active project phases.
  • Coordinated with other trades on-site for efficient scheduling of materials delivery, labor force and equipment requirements.
  • Worked with suppliers to keep materials flowing and meet demanding timelines.
  • Organized the storage of supplies, tools and equipment used in the course of construction activities.
  • Trained new workers on job site procedures and equipment use.
  • Reported progress and issues to project management and clients.
  • Enforced safety rules and corrected unsafe job site conditions.
  • Enforced safety rules at all times to reduce workplace hazards for both employees and visitors.
  • Performed hands-on work when necessary including demolition, carpentry, painting and drywall installation.
  • Performed work safely and effectively in high and precarious places.
  • Maintained records such as daily time sheets, material orders, project costs and contractor information.
  • Assessed usage of equipment by crews to prevent accidents, damage and safety violations.
  • Kept track of supplies and materials to prevent inventory losses.

Skills

Blueprint reading
Formwork installation
Concrete laying
Framing
Carpentry
Scaffolding construction
Concrete finishing
Heavy equipment operation
Machinery operation
Site preparation
Construction layout
Installation coordination
Material coordination
Project scheduling
Site safety
Worksite safety
Code compliance
Construction safety
Crew supervision
Leadership direction
Work planning and scheduling
Heavy lifting
Problem resolution
Problem-solving
Attention to detail
OSHA
Asbestos removal
Worksite preparation
OSHA
Asbestos removal

Timeline

Construction Worker

PG NY
10.2021 - 07.2026Read More

Construction Foreman

KNS Enterprises
07.2006 - 05.2021Read More
Sukhraj Dalchand