Manufacturing Process Optimization using SIMIO, Spring 2024
Modeled and optimized a sheet metal manufacturing process to reduce bottlenecks and improve production efficiency.
Developed a discrete-event simulation model in SIMIO to analyze workstation utilization, material flow, and machine downtimes.
Increased throughput by 20%, reduced cycle time by 15%, and improved resource allocation, leading to an annual cost savings of $50,000.
Supply Chain Network Optimization using AnyLogic, Summer 2024
Designed and optimized a multi-echelon supply chain network for a logistics and distribution system to reduce delivery lead times.
Used AnyLogic's multi-method simulation (agent-based + discrete-event modeling) to analyze warehouse operations, transportation routing, and demand fluctuations.
Achieved a 15% reduction in lead time, optimized inventory levels by 18%, and improved on-time deliveries by 25%, reducing overall logistics costs.