Overview
Work History
Timeline
Generic

Tahyr Gurbanov

Natick,MA

Overview

17
17
years of professional experience

Work History

Construction Manager

Dury Kol
Arkadag
11.2022 - 02.2024
  • Prepared and maintained project documentation including submittals, progress reports, and technical requirements for pumping stations and irrigation systems
  • Developed detailed material and labor quantity takeoffs to support accurate project estimation and procurement
  • Tracked project milestones and created comprehensive construction schedules to ensure timely project delivery
  • Coordinated with field personnel to document as-built conditions and prepare closeout documentation

Construction Manager / Zone Supervisor

Bouygues Batiment International
Ashgabat
04.2009 - 06.2021
  • Developed working project documentation for waterproofing works, installation of lightweight partitions, suspended ceilings, and marble wall cladding
  • Created detailed marble cladding album for quarry production
  • Calculated material quantities according to drawings and specifications using AutoCAD software
  • Determined scope of work and conducted negotiations and tenders to select subcontractors for corresponding works
  • Performed tender analysis of construction material suppliers' proposals
  • Executed material orders
  • Prepared contracts with material suppliers and subcontractors for implementation of corresponding works and services
  • Developed and managed allocated budget for responsible works
  • Managed waterproofing works, installation of lightweight partitions, suspended ceilings, and marble cladding from start to finish
  • Maintained organized logs for progress reports, subcontractor RFIs, and change order tracking
  • Coordinated planning, labor scheduling, and communication between field teams and engineers
  • Supervised and coordinated all subcontractors and engineers in the finishing works area of 13 hotel apartments with unique designs and decorative finishes
  • Performed quality inspections and prepared detailed progress reports
  • Tracked project milestones and created comprehensive construction schedules to ensure timely project delivery
  • Coordinated with field personnel to document as-built conditions and prepare closeout documentation
  • Ensured final completion of 13 hotel top guests’ apartments

Construction Manager

Derkar Bina
Ashgabat
09.2013 - 08.2018
  • Conducted initial site assessments and participated in feasibility studies to evaluate project viability and define scope of work.
  • Collaborated with architects, engineers, and stakeholders to review and finalize project designs and construction documentation.
  • Developed comprehensive project execution plans, including schedules, budgets, risk assessments, and resource allocation.
  • Coordinated and obtained necessary permits, licenses, and approvals from local authorities and regulatory agencies.
  • Managed documentation workflow including submittals, RFIs, and procurement for residential construction
  • Procured construction materials, equipment, and subcontractor services, ensuring compliance with quality and cost-efficiency standards.
  • Established and maintained a project schedule using industry-standard tools (e.g., MS Project), tracking milestones and critical path activities.
  • Supervised on-site construction activities to ensure adherence to approved plans, specifications, and safety protocols.
  • Held regular site meetings with project teams, subcontractors, and clients to review progress and address any issues or changes.
  • Managed construction workforce, assigning tasks, monitoring productivity, and ensuring compliance with labor regulations.
  • Oversaw quality control processes and conducted inspections at key construction phases to verify workmanship and materials.
  • Administered contract documents, change orders, and claim resolution, maintaining thorough records for project transparency and accountability.
  • Monitored project expenditures, controlled costs, and prepared progress reports and financial updates for stakeholders.
  • Coordinated commissioning, testing, and final inspections, resolving punch list items and deficiencies.
  • Facilitated client handover process, including the preparation of as-built documentation, operation manuals, and warranty certificates.
  • Led post-construction activities such as project closure reporting, lessons learned, and evaluation of subcontractor performance

Construction Specialist

United Nations Development Program (UNDP)
Ashgabat
04.2016 - 08.2018
  • Developed technical requirements for design and construction documentation of UN building renovation
  • Performed quality inspections and prepared detailed progress reports for project stakeholders
  • Compiled O&M manuals and warranty documentation for project closeout and handover

Design Engineer

State Design Institute “Ahaltaslama”
Ashgabat
06.2011 - 08.2012
  • Participated in initial project meetings to clarify client requirements and define project scope for building water supply, irrigation, sewerage, and fire protection systems.
  • Reviewed architectural and structural drawings to coordinate MEP (Mechanical, Electrical and Plumbing) systems integration and ensure spatial compatibility.
  • Conducted site surveys, collected baseline data, and analyzed existing infrastructure to assess project constraints and opportunities.
  • Developed conceptual designs and preliminary layouts for internal and external water supply, wastewater, irrigation, and fire protection networks in compliance with local building codes and international standards.
  • Performed hydraulic calculations and system sizing for pipework, pumps, storage tanks, and associated equipment using specialized engineering software.
  • Selected appropriate equipment, materials, and components for water supply, irrigation lines, sewage, and fire suppression systems, considering reliability, cost-effectiveness, and maintainability.
  • Prepared detailed design drawings, including plans, sections, and schematics for water supply, irrigation, sewage, and fire protection systems, ensuring clear graphical representation and technical accuracy.
  • Developed comprehensive technical specifications and schedules for system components and equipment, adhering to project and regulatory requirements.
  • Coordinated and integrated utility connections with external networks (municipal water mains, sewers, fire hydrants, irrigation sources, etc.).
  • Collaborated with other disciplines (HVAC, electrical, structural, architectural) to resolve interdisciplinary clashes and optimize system layout.
  • Submitted design documentation for internal and external technical reviews and incorporated feedback from clients, consultants, and regulatory authorities.
  • Provided support during the permitting process, prepared responses to regulatory comments, and revised documentation as required for approvals.
  • Issued construction drawings and specifications, ensuring readiness for tendering and site implementation.
  • Provided technical support and clarifications to contractors and site teams during the construction phase, resolved field queries, and participated in site inspections.
  • Reviewed and approved (“as built”) documentation prepared by contractors to ensure compliance with design intent and project requirements.
  • Participated in system start-up, commissioning, and testing procedures for water supply, irrigation, sewage, and fire protection systems.
  • Prepared final project close-out documents, including operations and maintenance manuals, and handed over all system documentation to the client.

Mechanical engineer

Polimeks inshaat A.Sh.
Ashgabat
09.2007 - 04.2009
  • Documented completed work and maintained comprehensive project records in accordance with company and regulatory standards.
  • Prepared detailed “As-Built” drawings using AutoCAD to accurately reflect modifications and final conditions of mechanical and plumbing systems.
  • Conducted testing and commissioning of building mechanical and plumbing systems and equipment, including documenting all procedures, results, and compliance with project specifications and codes.
  • Compiled and submitted closeout documentation packages for project handover, ensuring all documentation for client acceptance and regulatory approvals was complete and accurate.
  • Coordinated with local authorities to obtain necessary permits and approvals for mechanical and plumbing systems installation and final project acceptance.

Mechanical engineer, COOP

Ruhabatgurlushyk
Ruhabat
12.2006 - 09.2007
  • Developed and implemented maintenance and repair schedules for construction machinery, ensuring optimal operational efficiency.
  • Prepared procurement requests for spare parts and components necessary for heavy machinery maintenance.
  • Coordinated and oversaw repair operations for construction equipment, ensuring timely completion and adherence to safety standards.
  • Managed inventory and tracking of spare parts and lubricants, optimizing resource allocation and reducing downtime.

Timeline

Construction Manager

Dury Kol
11.2022 - 02.2024

Construction Specialist

United Nations Development Program (UNDP)
04.2016 - 08.2018

Construction Manager

Derkar Bina
09.2013 - 08.2018

Design Engineer

State Design Institute “Ahaltaslama”
06.2011 - 08.2012

Construction Manager / Zone Supervisor

Bouygues Batiment International
04.2009 - 06.2021

Mechanical engineer

Polimeks inshaat A.Sh.
09.2007 - 04.2009

Mechanical engineer, COOP

Ruhabatgurlushyk
12.2006 - 09.2007
Tahyr Gurbanov