

Dynamic Transport Engineer specializing in circuit migration, with a strong understanding of DWDM, OTN, and Ethernet technologies. Equipped with advanced critical thinking skills and an initiative-taking mindset. Committed to embracing new challenges and driving innovative solutions that contribute to team success through effective collaboration.
Active TS Clearance
•Conducted detailed circuit design analysis for best migration from legacy transport systems to advanced optical solutions.
•Verified network configurations by logging into OSS and assessing copper and fiber port availability.
•Create port reservations in MSS.
•Researched site survey for site address, device, and location discrepancies.
•Managed discontinued circuits and processing disco orders for non-active circuits. Migrate T1, DS3 and SOET off legacy transport and onto Nokia 4200.
•Developed comprehensive workbooks including Wavelength, Port Allocation, and handoff-sheets to meet customer requirements.
•Participated in TDM working group meetings to align project deliverables with customer expectations and requirements.
•Conducted peer-to-peer reviews to verify customer requirements, project deliverables were scheduled on time.
•Built and configured new circuit paths, ensuring logical cross-connects for best network performance.
•Resolved design discrepancies by collaborating closely with Network Planners to ensure project accuracy.
•De-provisioned outdated cross-connects and efficiently turned down circuit ports to streamline operations.
•Provisioned T3 and T1 ports in Tellabs 5500 and Alcatel Lucent 1630, ensuring compliance with project specifications.
•Conducted thorough validation checks before and after circuit migrations to support network integrity.
•Groomed circuits within Time Warner, Level 3, and CenturyLink networks, enhancing service reliability.
•Provisioned DWDM, SONET, and T3 circuits across various transport platforms.
•Audited and migrated one hundred circuits from Xponders to MPLS.
•Collaborated with cross-functional teams to gather requirements and develop comprehensive engineering design packages.
•Executed circuit provisioning and de-provisioning tasks for legacy transport systems to ensure prompt transitions.
•Strong understanding of DWDM and Optical Transport networks using Cisco, Cyan, Fujitsu, Alcatel, and other vendor products.
•Worked within devices on Charter, Time Warner Cable, and Bright House Networks with ability to reverse-engineer circuits and find desirable information needed for migration and groomed circuits.
•Extensive knowledge of network design both from start and creating revisions for migrations.
•Created Change tickets in Remedy to dispatch tech for site.
● Worked projects involving circuit provisioning life-cycle, installation service orders with LECs for T1-T3, SONET OCN\'s, Ethernet, and E911
● Engineered circuit installations for moves, adds, changes, deletions of new and existing circuits.
● Evaluated circuit design paths for design integrity.
● Serviced multiple large-scale projects around Baltimore, Maryland, Northern & Southern Virginia, and West Virginia markets.
● Managed individual projects, accountable for completing projects within the allotted budget and time frame.
● Defined project scope, objectives, coordinated activities for circuit grooms, CFA Rolls, and identified resources.
● Developed project plans and managed project milestones.
● Established effective communication with Account Sales, Area Managers, and Project Managers.
● Provided project management expertise for circuit inventory database system (Granite).
● Communicated with wireless carriers on large scale orders to ensure deliverables were properly defined and expectations were met.
●Utilized strong communications skills to implement workarounds necessary for completing orders.
· Successfully migrated multiple legacy circuits to MPLS, reducing downtime and improving network resiliency.
· Strengthening collaboration between DISA operations, vendors, and service providers through effective communications.
· Effectively overseen projects to ensure circuits installations were conducted correctly. Reduced annual costs of more than $5M by disconnecting unused circuits.
· Provisioned 1,125 circuits two months ahead of the project schedule.
· Achieved 100% accuracy of data integrity.
· Awarded Excellent Performance for contributions to Project Delta by completing 7 Port Migration MOPs at 100% success rate, and achieving the project goal of getting 68% of subscribers on Cyan Z equipment converted to 8032 protection protocol in advance of the target date.
· Provided technical support for more than five members of Software Upgrade Deployment Team to upgrade Cyan Nodes to 8.0.07.