TAIWO OSHIN

CIVIL ENGINEER
DOHA

Summary

Results-driven Construction Project Manager with over sixteen years of experience in the GCC region and Africa. Proven track record of successfully delivering complex construction projects on time and within budget. Adept at leading cross-functional teams, collaborating with stakeholders, and ensuring compliance with industry regulations. Skilled in strategic planning, risk management, and contract negotiations. Strong leadership abilities combined with excellent communication skills to effectively manage project timelines, resources, and client expectations. Dedicated to delivering high-quality results while fostering a culture of safety and innovation. Dynamic, adaptable, and knowledgeable in GCC construction practices, aiming to drive project success and exceed client satisfaction in the challenging and diverse construction landscape of the GCC region.

Overview

14
14
years of professional experience
5
5
years of post-secondary education

Work History

PROJECT CHIEF ENGR

BAHADIR INSAAT MUHENDISLIK
Doha
09.2020 - Current
  • Falcon 5 Beddown project. Total value: $600 Million.
  • Completed 100,000 m² Asphalt area, 2 million cubic meters of Bulk Earth Works & Infrastructure works , such as Excavation, Backfilling and casting of 114 Km different kinds of Duct Banks, 112 km of different diameter of HDPE/Cast Iron Pipelines for Storm & Sanitary , 12 km of Different diameter of Cast Iron Pipes for Chilled Water System
  • Construction of 11000 Manholes , 60 Sewage Tanks, 25 Foam Tanks , 15 Pump Stations , Heavy Foundations (50 no’s ) for High Mast Lights , 900 Light poles foundations & their Erections, 100,000 m2 Construction of Sub-grade , Sub-base & 100,000 m2 Asphalt Works , 2500 L-m chain Link’s Fence Installation with Foundations, 12 no’s of Fence Gates Installation .
  • Erection of Steel Structure Car Park Shades, 780 Piles , 1250 L-m of Heavy Beams 3m x 3m , 60000 m2 of Concrete Slab 36 cm thick for Aircrafts Munition Storage Areas, Aircraft Hangers and Maintenance structures, Squadron Areas, Military Operations and Training facility, Live Ordinance loading area facilities, Corrosion control Hangars, Fuel cell Maintenance hangars and other airfield support facilities
  • Complete supervision from design to completion of Squadron operations facilities Fit-out works and architectural finishes
  • Held full responsibility for appointing corresponding site staff and provided management for internal teams, contractors and vendors
  • Organized, supervised, administrated, coordinated and evaluated project operations, in order to ensure correct procurement of suitable equipment, machinery and material
  • Increased savings by initiating and fostering relationships with vendors to communicate on problematic areas and worked closely to resolve them
  • Fostered compliance with contract requirements and budget restraints, ensuring that all Company’s objectives were met and achieved
  • Continuously improving project performance by identifying open areas where progress can be made to avoid delays
  • This has helped us to gain over 35 days despite covid delays.
  • Collaborated with contractors, architects, engineers, and public agencies to complete projects within timeline limitations and budget constraints.
  • Verified completed projects met approved time, quality, and cost estimates.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
  • Planned and implemented comprehensive construction schedule to guarantee completion of project on time and within budget.
  • Supervised team of 3000 construction workers to maintain productivity and quality of work.
  • Established and maintained relationships with vendors to source affordable and high quality materials and equipment for construction projects.
  • Oversaw effective disposal of construction waste and implemented programs to increase use of recycled materials.
  • Reduced costs by streamlining contract bidding and procurement processes to assure best prices for materials and services.
  • Tracked project costs and other financial metrics to maximize profitability.
  • Conducted critical pre-installation conferences with general contractors, subcontractors, consultants, and manufacturer's representatives.

SITE MANAGER

Consolidated Contractors company
Lusail City (Qetaifan Island)
01.2020 - 09.2020
  • QETAIFAN PROJECTS/KATARA HOSPITALITY. Project value: $192
  • Leading of Material Procurement and Quality Control tasks related to project’s materials, Sub-Contractors qualification and selection.
  • The Project is multi-phased EPIC Project consisted of earthworks, infrastructures and Road works for future Industrial Area, backfilling works of 6 million Cu.M, construction of 20 K.M of road network with all related infrastructure services including Sewer network, sewer pumping stations, surface water drainage, street lightning and electrical substations and network, telecommunication network, TSE and Potable water networks etc
  • Implemented contactless inspection procedure and zero paper policy in line with authorities covid regulations to avoid project closure while ensuring compliance of all stakeholders.
  • Monitored contracts and service level agreements to identify potential risks and implement mitigation actions to protect development process from unforeseen delays and costs.
  • Maintained schedules to meet key milestones at every project phase.
  • Directed changes to project scope and cost and implemented appropriate change management processes to keep project on track.
  • Partnered with project team members to identify and quickly address problems.
  • Established and managed change management processes to fulfill successful project transitions.
  • Monitored project progress, identified risks and implemented corrective measures to acquire success.
  • Developed and maintained project budgets to control costs and meet organizational and project goals.
  • Scheduled and facilitated meetings between project stakeholders to discuss deliverables, schedules and conflicts.
  • Tracked project and team member performance closely to quickly intervene in mistakes or delays.

CONSTRUCTION MANAGER

EUROFINSA CEINSA CONSTRUCTION
Lusail City, Qatar
02.2018 - 01.2020
  • Lusail Marina yacht club $18million BP15, Entertainment Island Land Reclamation and Backfilling (preconstruction works) $120million, Kingdom of Saudi Arabia Ministry of Foreign affairs Embassies across West-Africa. $150 million
  • Duties include Verified completed projects met approved time, quality, and cost estimates.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
  • Coordinated material procurement and required services for projects within budget requirements.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.
  • Negotiated and managed third-party contracts related to project deliverables.
  • Scheduled and facilitated meetings between project stakeholders to discuss deliverables, schedules and conflicts.
  • Worked closely with account team to identify areas to improve cash flow and leverage tools to improve cash flow from contracts.
  • Monitored contracts' performance to detect non-compliance with terms and deficient returns and organize proactive resolutions.
  • Maintained primary relationship accountability for clients, overall servicing responsibility and client satisfaction to maximize profitability of client relationships.
  • Directed day-to-day operational aspects of project and scope and monitored progress of construction activities.
  • Implemented quality control standards for consistent approach and results.
  • Achieved maximum cost effectiveness by providing value engineering for construction means and methods.
  • Identified special circumstances and constraints in order to develop effective alternatives or solutions.
  • Scheduled workforce needs with superintendents and allocated company resources to meet project requirements.
  • Verified completed projects met approved time, quality, and cost estimates
  • Surveyed sites to determine material needs and accurately manage inventories and budgets
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion

QAQC MANAGER

Khalid Bin Al Suwaidi Trading and contracting
Norther Areas (Al daayen municipality)
01.2017 - 02.2018
  • NORTHERN AREAS PROJECT, JERYAN FARMS IRRIGATION AND SEWER SYSTEMS, AL MARKHIYA LOCAL ROADS AND DRAINAGES, UMM AL AMAD PROTECTION BUND, AL DAAYEN MUNICIPALITY LOCAL ROADS. PROJECT CODE: IA 2017 C005I. Project Value: $40 Million
  • PWA ENGR IN-CHARGE: SULTAN YASSIN, PANKAJ SHARMA. KHARAMAA ENGR IN CHARGE: ENGR ASHRAF, ENGR ANOUAR
  • Checking/ evaluating the implementation of quality standards, inspection and testing in line with company and project requirements
  • Ensuring development of project specific plans, procedures, and forms by the QA/QC team and overseeing implementation at project level.
  • Developing project quality plan and associated procedures in coordination with project management team.
    Developing and establishing standards and methods for inspections, testing procedures and reporting their implementation effectiveness.
  • Ensuring all required Inspection & Test plans are produced, reviewed and implemented.
    Ensuring all required method statements and associated risk assessments are produced, reviewed and implemented
  • Ensuring all required material submittals are processed and approved prior to being used at site.
    Supporting and advising project team on all QA/QC issues, and managing their performance.
  • Developing project audit program and ensuring that it is managed and maintained.
    Communicating all audit results and recommendations, and ensuring that action plans are defined, implemented and verified

CONSTRUCTION ASSURANCE MANAGER

Medad Engineering Consultancy
Pearl Qatar
09.2015 - 01.2017
  • Qatar Development Company (QDC) project Value: $1 Billion
  • AQ3AQ4 Package (4 Towers (B+G+42F) + 2 Townhouses (B+G+7F) + 15 Standard Villas + 3 VIP Villas) with total BUA 221,155 m2 & total cost of 1.1 billion Qatari Riyals.
    AQ5AQ6 Package (2 Towers (B+G+42F) + 2 Townhouses (B+G+7F) + 10 Standard Villas + 3 VIP Villas) with total BUA 225,313 m2 & total cost of 1.0 billion Qatari Riyals.
    Abraj Quartier project located in the heart of Doha city (Pearl Qatar). Project includes 4 Nos. of High-Rise Residential Tower (G+42) and 28 Executive Villas, 5 Nos. VIP Villas and & Townhouses. Total BUA of the project is 444000 sqm. with 1324 units flats, 134 units in townhouse, 25-unit flats in villas and 5 units VIP villas with parking space of 2562 no. at 3 level podiums
  • Focal point for implementation of Quality Management System across the project
  • Liaise with Program Sponsor for pre-qualification of Contractors/Consultants.
  • Dealing with quality issues in coordination with Consultants/ Contractors/ Project Managers
  • Identify gaps in quality issues in relation to the program either internally or externally and address them to ensure success.
  • Conduct quality meetings with the Project Team to take a lead in implementation.
  • Ensure that the program is completed with expected quality and client satisfaction
  • Auditing of QMS of Contractors/Consultants to ensure that the contractual requirements are accomplished.

PROJECT QAQC MANAGER

RLS-JV RED LINE SOUTH JOINT VENTURE
DOHA
12.2014 - 09.2015

M10/M11 Switchbox, Red Line south Doha Metro. Total Value $2billion. Emergency Exit West. Qatar Emiri Airforce base Total Value $100 million

  • Responsible for establishing & managing QDVC’s Quality Management System for Red Line South Switchbox M10/M11 Project, Qatar.
  • Project Deliverable: Ensure by coordination that Project deliverable are delivered as per Q-Rail’s Scope of work.
    Review of Submitted Documentation: Ensure that all inspection/tests, Shop Drawings, prequalification of subcontractors, Material Submittals and all other documents are tracked, logged and updated.
  • Auditing: Audit program covering externally with Sub-Contractor/ Suppliers /Third Party- and internally within RLS-JV.
    Inspection & Testing: Manage RLS-JV Inspection & Testing Hold-Point/Witnessing Program and ensure response/documentation in 'Inspection Analysis Log'.
  • Interfaces: Liaise with the project team at all levels with the aim of maintaining excellent Quality Management Standards for the Project and acting on identified Improvement Proposals.
  • Ensure that RLS-JV Team monitor & coordinate construction scope of works between various trades; carry-out site inspections and witnesses on-site testing by Testing Agencies and also factory tests; monitor the QA-QC Procedures followed by the Contractor and that their Quality Verifications Files (QVF) are being maintained satisfactorily; monitor the Contractor's compliance with procedural Conditions of Contract; Site Dairies are produced and reported
  • Review the Sub-Contractors NCRs and NCR Reports/Logs, provide input and ensure that the Designer has no objection to any changes that may be the result of Corrective Actions to be carried out. Coordinate NCRs raised by other stakeholders.
    Monitor trends. QA-QC Meetings: Chair weekly QA-QC Meeting with the Contractor attended by the Project Manager, Client etc.

SENIOR QAQC/ARCHITECTURAL FINISH ENGINEER

AKTOR SA
DOHA, ABU-DHABI
04.2009 - 12.2014

Abu-dhabi Aloft Hotel, Al-Sadd Multipurpose Sports hall.

Managed the Erection of Steel Structure Buildings of about 2500m2 areas, Pre cast Panel, fixing and comprehensive Civil, Electrical, Plumbing Works, HVAC, Fire Alarm & Telecommunication works. Civil works comprise gypsum board; Vinyl Tiles; Toilet Partitions; Sanitary fixtures; Painting; CMU; Plastering; Tiling, Acoustic ceiling, Marble counter tops, Metallic Doors etc.

  • Develop and implement quality control plans and procedures to ensure compliance with industry standards and project specifications.
  • Review project plans and specifications to identify quality requirements and ensure they are properly communicated to project teams.
  • Collaborate with project managers, engineers, and subcontractors to address quality-related issues and develop effective solutions.
  • Monitor construction activities to verify adherence to quality control procedures and identify areas for improvement.
  • Conduct regular site visits to assess quality control measures and provide guidance to project teams.
  • Coordinate and conduct quality training programs for project staff to enhance their understanding of quality control principles and practices.
  • Track and analyze quality data, including non-conformities and corrective actions, to identify trends and implement preventive measures.
  • Prepare comprehensive quality control reports and documentation, including test reports, inspection records, and quality control checklists.
  • Liaise with clients, regulatory agencies, and third-party inspectors to ensure compliance with project requirements and resolve quality-related issues.
  • Stay updated on industry standards, regulations, and best practices in quality control and implement necessary changes to enhance project quality.
  • Provide guidance and mentorship to junior quality control staff, promoting a culture of excellence and continuous improvement.

Education

Bachelor’s Degree - Civil Engineering

AMBROSE ALLI UNIVERSITY
Edo State, Nigeria
07.2002 - 09.2007

Skills

Subcontractor management

undefined

Accomplishments

  • Introduced the process of monitoring and documenting concrete wastage on site by comparing the actual concrete ordered with the theoretical quantity required as per approved shop drawing which helps to reduce concrete wastage on site by over 30 percent with over QAR 2 million saved in concrete costs
  • Production of all Strom drain concrete Trench, Telecom Manholes, street light foundations, car shade foundations, pedestrian shade foundations and chilled water precast concrete segments on site instead of subcontracting to a precast company and saving over 25% of the total projected cost
  • Continuously improving project performance by identifying open areas where progress can be made to avoid delays. This has helped us to gain over 35 days despite covid delays.
  • Reduced project overhead cost by over 50% in my first 90 days of being at the helm of the Saudi Arabian Embassy projects.
    Reviewed and cancelled non-performing contracts with subcontractors unable to fulfill the obligations of their contracts
    Taking stock of all the material needed for the timely completion of the project and sourcing these material from the local market which saves a lot of time and logistics costs and with positive impact on the project delivery date
    Reducing redundancies and eliminating overlapping responsibilities of staffs which leads to increase in productivity and cost savings
  • Introduced and implemented a “Right first-time” culture for all inspections raised by ensuring all activities are monitored properly to ensure compliance with project requirement. This led to high level of trust and improvement of contractor client relationship which reduced client inspection time by over 50 percent
  • Supervised the completion of all scope related to structural works with over $10 million dollars in savings within a period of 18 months; which was achieved by siting a precast yard on site to produce all precast elements thereby saving costs and increasing production while taking the project 90 days ahead of schedule.
  • Implementation of Lean construction techniques by reducing redundancy, eliminating waste (time and resources)
  • Introduced and implemented the use of cost codes for all labors on site to prevent losses and to ensure maximum productivity

Software

AutoCAD

Revit

Acconex

Mezzoteam

Microsoft office

Timeline

PROJECT CHIEF ENGR

BAHADIR INSAAT MUHENDISLIK
09.2020 - Current

SITE MANAGER

Consolidated Contractors company
01.2020 - 09.2020

CONSTRUCTION MANAGER

EUROFINSA CEINSA CONSTRUCTION
02.2018 - 01.2020

QAQC MANAGER

Khalid Bin Al Suwaidi Trading and contracting
01.2017 - 02.2018

CONSTRUCTION ASSURANCE MANAGER

Medad Engineering Consultancy
09.2015 - 01.2017

PROJECT QAQC MANAGER

RLS-JV RED LINE SOUTH JOINT VENTURE
12.2014 - 09.2015

SENIOR QAQC/ARCHITECTURAL FINISH ENGINEER

AKTOR SA
04.2009 - 12.2014

Bachelor’s Degree - Civil Engineering

AMBROSE ALLI UNIVERSITY
07.2002 - 09.2007
TAIWO OSHINCIVIL ENGINEER