To utilize my skills within a company offering the chance to further my career.
Overview
19
19
years of professional experience
Work History
Lifting & Rigging Supervisor
Acciona Facility Service
04.2023
Worked in Ras lafan industry area NFE-1 project North Field East Project Onshore LNG Facilities
Logistic department in lay down area loading unloading work
GRE Pipe, Spool, SS Pipe, Spool, Steel Structure, Cable Drum, Transformer, Electric Panel, Motor, Pump, PVC Pipe, Pressure Vestal, etc.
Rigging Supervisor
Gulf Contracting Company
11.2022 - 04.2023
Worked in Ras lafan industry area NFE-1 project North Field civil and structural and mechanical loading unloading erection and installation work.
Rigging Supervisor
Doha Petroleum Company
01.2021 - 02.2022
Worked in fifa pipeline project in messaide industry city
32” pipeline Loading unloading lifting shifting erection and fit-up work
This line 14 kilometer Complete fit up and safely all work done.
Rigging General Foreman
Bechtel co.
08.2016 - 08.2019
Worked on Riyadh Metro project
Worked on rail concrete module steel re-bar loading, unloading, lifting, shifting, and erection work.
Rigging Foreman
Madina Group WLL
03.2015 - 01.2016
Worked on QStec (Qatar Solar Technology Project) shutdown
Worked on CS Pipe, Spool, SS Pipe, Spool, Valve, Structure, Loading Unloading, Lifting Shifting & Erection Work.
Rigging Supervisor
ISCO Co.
11.2014 - 01.2015
Worked on Equate Co
Turnaround 2014 Project
Worked on Piping Modification Work.
Rigging Supervisor
Al-Hassan Engineering co. LLC
01.2013 - 08.2014
Worked on SGD (Shah Gas Development) project
Main Contractor Samsung Engineering & FLOOR
Worked on Heavy piping Erection Work.
Rigging Supervisor
Kharafi National Co.
03.2011 - 10.2011
Worked on Habshan-5, Gasco Integrated Gas Development Habshan-5 Process Plant Project
Main contract GASCO-TECHNIMONT
Worked on Fan Cooler Structure & Tube Bundle Assemble, Shifting Lifting - Erection & Installing.
Rigging Supervisor
Kharafi National Co.
12.2009 - 03.2011
Worked on Al-Saad West Water Treatment Plant Project
Worked on Heavy Motor & Rotating, Pipe Spool, And Equipment Loading Unloading Lifting shifting & Erection.
Rigging Supervisor
Kharafi national Co.
11.2007 - 10.2009
Worked on Aromatics Complex (1265) Petroleum Industrial Company Project
Main Contract Bechtel & Technimont
Worked on Erection All Heavy Lifting Equipment – In Project As Vessel Column, Heater, Pump, Fan Cooler, Rotary Valves For Absorbent Chamber, Compressor, Generator, Structure, Piping 72”
Loading Unloading Lifting Shifting And Erection Work.
Rigging Foreman
Nasser S. Al-Hajri Co.LTD.
01.2006 - 09.2007
Worked on Cheweda Technip Joint Venture
Worked on Concrete Column Lifting, Shifting, Preparation & erection Work.
Rigging Foreman
Nasser S. Al- Hajri Co. LTD.
09.2004 - 12.2005
Worked on Oryx GTL Gas To Liquid Project Ras Laffan Industrial City
Main Contract Technip S.P.A.Italic
Worked on Pipe, Spool, Valve, Blind, Sport, Loading, Unloading, & Erection Work.
Lifting and Rigging Supervisor at China Petroleum Pipeline Engineering Co., LtdLifting and Rigging Supervisor at China Petroleum Pipeline Engineering Co., Ltd