Summary
Overview
Work History
Education
Skills
LANGUAGES
Timeline
Generic

Taylor Payton

Price

Summary

I am excited to optimize workflows, perform correct safety procedures in the workplace, and be a good employee too your company.

Overview

9
9
years of professional experience

Work History

Fountain Installer

Pepsi
09.2023 - Current
  • Laid out materials and system components to prepare for installation.
  • Collaborated with team members to ensure smooth workflow and successful project completion.
  • Drove box truck too customers business and Installed Beverage fountain equipment.
  • Consisted of doing a Line run, placing equipment, Hooking it up, and firing it up.
  • Reduced callbacks for installation adjustments by ensuring quality control during initial setup.
  • Operated tools, equipment, and machinery according to safety standards.

Core Energy Group (Solgen construction)
  • Installed Solar residentially I have done Enphase, Solar Edge, Tigos, and AP systems. I have worked with panels from 325w to 455w all types of brands. For racking I have used snap n rack and unirack. I also know how to do electrical from start to finish to get the system done and commisioned. I've done sub panels when needed as well. I have been in solar for a year and I love it so I am happy to come be apart of your team and I will make a great asset to your company.

Apprentice plumber

Jack Serdar Plumbing Inc.
10.2020 - 11.2021
  • New Construction Subrough is what I Started doing for 7 months. It involved Digging and grading your trench so the pipe your laying has grade. Had to make sure to look over the plan and get the bathrooms, sinks, and laundry marked out. Had to put stacks for the rough stage. Always have to pay close attention to the plan and make sure everything is in the correct spot. Was using a Hilti jack hammer a lot to break out concrete and break up the compacted dirt/Rocks.
  • New Construction Rough is what I started doing after 7 months of Subroughs. Starting a house Drilling all your Drainage/water holes for ABS/Pex to stay in the walls of the home. Then I was running Pex Water Lines to every plumbing fixture in the home. It involved using J-Hooks to make sure they are secured on the joist. Also Making sure that your 4 feet off mechanical room wall sometimes more so your not in the way of H-vac. Always have to make sure you are hitting every fixture with the right water (Hard/Soft). After finishing all the Water lines then move to Setting Tubs and putting valves up for the Tubs and showers.

Laborer /Operator

Black Forest Paving, West Jordan Ut
06.2020 - 10.2020
  • Laborer working the shovel and racking this required the asphalt to be maintain and leveled. I was also trained on running the skid ster to fill in patches and other needs required as needed.
  • I was also trained and drove the finish roller behind the main roller to ensure all lines/bumps were smoothed out.
  • Seasonal

Cabinetry Professional cabinet maker an installer

Pepper Tree, Salt Lake City, Ut
04.2018 - 05.2020
  • Company Overview: Pepper tree kitchen and bath is a very high-quality cabinetry company. Our main goal is to always work hard to provide outstanding customer service. We custom make requested cabinetry and install the best quality material

Warehouse

Envirotech Molded Product, Salt Lake City, Ut
09.2017 - 03.2018
  • The main requirements for this position was to load various products using a forklift to distribute them to the shipping department. Being very fast and efficient was a very important trait to carry as the tasks that I was given needed to be done in a timely manner to ensure our consumers were getting their products on time.
  • I went back to my previous employer 3-form fabrication
  • Inventory: Being very detail oriented was an important factor to ensure that our records indicated the correct shipping/receiving calculations. Paying very close attention to detail was important in order to make sure that our clients received exactly what they were supposed to.
  • Mixing Material and Pulling Kits: Mixing Material consisted of paying very close attention to the materials needed in order to complete the tasks that were given in a timely manner. This was important to make no mistakes because the other departments needed the correct material on time. Pulling Kits were an important part of each day for the departments to have the correct hardware to complete each of their parts.

Fabricator

3 Form Fabrication, Salt Lake City, Ut
09.2016 - 09.2017
  • Working as a team lead in the sand and polish department came with a lot of responsibility including training new hires to meet and exceed 3form expectations
  • Team Lead of Sand & Polish department: Made and submitted orders to ensure the correct inventory was available for my team to complete their jobs successfully before being shipped out to our valued customers, as I accomplished goals as a team lead I maintained and worked alongside my co- workers sanding and polishing. It was important that I maintained the workflow in my area through the day by getting jobs off the racks that are prioritized to ship as scheduled.
  • Machinery: This area requires the ability to learn quick and efficiently exercise the safety requirements to accomplish polishing acrylic, cutting wood on the beam saw to required measurements. I was also skilled and crossed train to use many different hand tools to complete fabrications.
  • Paint Department: This area requires being detail oriented self-motivated to get the job done as efficient as possible this area required scuffing panels and staining alders correctly
  • Post Manufacturing: This area requires quality work and the ability to work in a fast-pace environment as packages are being prepared to be sent out.

Landscaping

Tom Steele Landscaping, Price, Ut
03.2016 - 08.2016
  • This job required excellent communication skills, speaking with customers and understanding directing is essential to getting the job done. This job requires being physically fit to maintain and to finish the jobs
  • Job Responsibilities: Aerating Lawns, Trimming Trees, mowing lawns, and implementing sprinkler systems.

Education

Diploma -

Carbon School District
Price, Utah

Skills

  • Self-motivated
  • Hard labor
  • Problem solver
  • Great communication skills
  • Detail oriented
  • Working with all tools
  • Quality Check Offs
  • Reading blueprints
  • Variety of Installations

LANGUAGES

English

Timeline

Fountain Installer

Pepsi
09.2023 - Current

Apprentice plumber

Jack Serdar Plumbing Inc.
10.2020 - 11.2021

Laborer /Operator

Black Forest Paving, West Jordan Ut
06.2020 - 10.2020

Cabinetry Professional cabinet maker an installer

Pepper Tree, Salt Lake City, Ut
04.2018 - 05.2020

Warehouse

Envirotech Molded Product, Salt Lake City, Ut
09.2017 - 03.2018

Fabricator

3 Form Fabrication, Salt Lake City, Ut
09.2016 - 09.2017

Landscaping

Tom Steele Landscaping, Price, Ut
03.2016 - 08.2016

Core Energy Group (Solgen construction)

Diploma -

Carbon School District